Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca.

Slides:



Advertisements
Similar presentations
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Advertisements

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Data Comm Proposed DCL Services Deployment Waterfall
A service of Maryland Health Benefit Exchange MHBE IAC System Update July 17, 2014.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
AOC/FOC Interface for Data Comm Production System
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
How a Seemingly Minor Weather Concern Can Have a Significant Economic Impact on the Aviation Industry Aviation Case Study Kim Runk, NWS Las Vegas Southwest.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Harris.com Michael Earl Systems Engineering, Trials and OPR Trials Status and OPR Update.
Data Link Communications
Federal Aviation Administration NextGen Test Bed Capabilities and Future Plans Presented by: Vince Lasewicz Laboratory Services Group Date: 11/05/09 William.
Document Tracking and the Related Process Andria Roney Rob Mead Andy Fry Andrew Onken.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Presented to: By: Date: Federal Aviation Administration Weather System Engineering Issues Friends & Partners in Aviation Wx Raymond Moy, Air Traffic Organization,
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Federal Aviation Administration NextGen Integration & Evaluation Capability (NIEC) Presented by: Vince Lasewicz Laboratory Services Group Date: 01/07/10.
Federal Aviation Administration DCIT 39: S1P1 DCL E2E Summary DRAFT To: DCIT All WG From: Data Comm Production SE Date: DCIT 39, 11 March DRAFT.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #33 Agenda 6/4/2014 Harris – Washington, DC.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 Agenda 06/12-06/13/2013 Boeing – Arlington, VA.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 29 From: Data Comm Production Sub-Team Date:
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: Net Centric Demonstrations and Prototypes TIM #5 By: Mary Delemarre Federal Aviation Administration WJHTC Laboratory Services Group Concepts.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #23 Plenary 05/09/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Presented to: By: Date: Federal Aviation Administration DCIT 44 Mark Patterson, FAA, AFS Nov 2015 Flight Standards Update.
Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT 37 Plenary Agenda December 10, 2014 Harris Corp Washington, DC.
| 1 harris.com Matt Maki DCL Trials Lead DCL Trials Decommissioning Plan 29 Sep 2015.
Harris.com Doug Dixon Key Site Ops Metrics and Benefits.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
CIE ENGINEERING INC Federal Aviation Administration WJH Technical Center & Rockwell Collins VDL Mode 3 STC Testing 16 & 17 October, 2004 WJH Technical.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #9 Meeting 09/21/2011 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration System Wide Information Management SWIM Implementing Programs (SIPs) Status Presented to: Demonstrations and Prototypes.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #22 Plenary 03/14/2013 To: DCIT By: Gregg Anderson.
Federal Aviation Administration Subscriber Database (SDB) and Web Access To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 3/13/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #25 Agenda 07/17-07/18/2013 Harris Corp – Washington, D.C.
Presented to: By: Date: Federal Aviation Administration Florida NextGen Test Bed Demonstration and Prototyping Information Exchange Briefing Alex Nguyen,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
Federal Aviation Administration Test Planning for AOC/FOC Interface for Data Comm Production System To: DCIT 26 From: Data Comm Production Sub-Team Date:
DCIT Document Hierarchy End-to-End Procedures and operational system features effecting multiple organizations Systems Integration Document Detailed system.
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
International Civil Aviation Organization
Ops Metrics.
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
Data Communications Implementation Team (DCIT)
Data Communications Implementation Team (DCIT)
Data Communications Program
Presentation transcript:

Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig & Pete Muraca

Federal Aviation Administration Data Comm 2 Accomplishments Since Last DCIT SLC IOC Declared 8/7/2015 IAH and HOU upgraded to TDLS V.12 SW HOU TDLS-ERAM Direct Connect Interface is operational International Flights –Hyphen issue for non-US Flag carriers will be fixed in release on 9/10 –International flights for all carriers only CAF initially (revision by voice only) –Resolved prior to waterfall. Coordinated with first set of waterfall sites – –ZHU ZID ZNY – held first two coord mtgs – On track for IOC at MSY, SDF, and EWR. Aug. 25 kickoff with second set of waterfall sites (ZLA, ZME, ZBW, ZDV)

Federal Aviation Administration Data Comm 3 SLC Test Status-IOC Declared Operators Supported Testing leading up to IOC at Salt Lake City ̶ FedEx Express (MD11) ̶ UPS (B767 & MD11) ̶ United Airlines (B ) ̶ Southwest Airlines (B ) ̶ Harris Corporation (Falcon 9) ̶ US Air Force (KC-135)

Federal Aviation Administration Data Comm 4 Path to ISD /22 JULAUGSEPTOCTNOVDEC ZLC/SLC IOC 8/7 ZHU IAH IOC 9/10 ZHU HOU IOC 9/30 ZLC ZTL Complete 11/30 IOA Complete 12/09 ISD Phase 3 EAD40 Phase 5 Milestones V /6 EADXX = ERAM = TDLS = TIMS V12.XX ZLC SLC ZTL Draft v5.1 9/3 Field Activities ZLC/ZTL Nat’l Site Failover ZLC/ZTL Nat’l Site Failover CPDLC - SLC ZLC/SLC DFV Dry run & Conduct ZLC/SLC DFV Dry run & Conduct Phase 4 8/19 9/10 9/30 ZHU/IAH/HOU DFV Dry Run & Conduct ZHU/IAH/HOU DFV Dry Run & Conduct IAH/HOUEnhanced CHI ZHU EAD30 Install TDLS 9/18 V /18 ZLC EAD30 Install 8/7 ARTCC EAD40 Install 8/27 Test only TIMS You are here P1 ZHU ERAM uplevel to DC ZHU ERAM uplevel to DC 7/6 - 7/9 P0 IAH TEDC IAH TEDC HOU TEDC HOU TEDC 7/1 8/13 V xxx 9/10 SLC BOI V Int’l Flights IAH HOU 7/21 ZLC/SLC TO & FM Testing ZLC/SLC TO & FM Testing 7/9-11 7/22 SLC BOI IAH HOU 7/ /10 P3 7/29 – 8/5 8/3-4 8/6-8/12 EAD30 7/30 - 8/1 ZLC/ZHU Parent/Nat’l Integration ZLC/ZHU Parent/Nat’l Integration P4 8/13-17 SLC BOI IAH HOU SLC BOI IAH HOU V /15 SLC BOI 7/16-18 V TIMS V /14 SLC BOI IAH HOU 8/ /21 Thanksgiving 11/3012/19 Christmas 1/4 8/18-20 ZTL EAD30 Install 8/17 ZTL Network Connectivity Testing & SSM-220 ZTL Network Connectivity Testing & SSM-220 8/31 9/4 8/5

Federal Aviation Administration Data Comm 5 KIAH – Carrier DFV Participation Lead-Up Timeline

Federal Aviation Administration Data Comm 6 KIAH Date Testing Window Tentative ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Testing w/ WJHTC 08/19 – 08/21 W, Th, F Mid-Shift Active and Back-Up mode Testing w/ Carrier 08/22 – 08/23 Sa, Su Mid-Shift Active and Back-Up mode Testing w/ Carrier 08/24 – 08/27 M, Tu, W, Th Mid-Shift or Day & Swing Shift (as Aircraft avail.) Active and Back-Up mode Carrier File and Fly 08/28 – 09/03 F, Sa, Su, M, Tu, W, Th Normal Ops Active and Back-up mode IOC9/3 Note: Mid-Shift is or 0500 (Local)

Federal Aviation Administration Data Comm 7 IAH Test Status Conduct DFV field IAH with the following major carriers and test facilities: –UPS –UAL –FDX –FAA Technical Center Bench Avionics (B757 / 767, B737)

Federal Aviation Administration Data Comm 8 KHOU – Carrier DFV Participation Lead-Up Timeline

Federal Aviation Administration Data Comm 9 KHOU Date Testing Window Tentative ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Testing w/ WJHTC 08/24 – 08/26 M, Tu, W Mid-Shift Active and Back-Up mode Testing w/ Carrier 08/27 – 08/28 Th, F Mid-Shift Active and Back-Up mode Testing w/ Carrier 08/29 – 09/02 Sa, Su, M, Tu, W Mid-Shift or Day & Swing Shift (as Aircraft avail.) Active and Back-Up mode Carrier File and Fly 009/03 – 09/10 Th, F, Sa, Su, M, Tu, W, Th Normal Ops Active and Back-up mode IOC9/10 Note: Mid-Shift is or 0500 (Local)

Federal Aviation Administration Data Comm 10 HOU Test Status Conduct DFV field HOU with the following major carriers: –UPS –SWA –UAL –FDX –FAA Technical Center Bench Avionics (B757 / 767, B737)

Federal Aviation Administration Data Comm 11 AOC Interface Scorecard Completed testing with UPS, FDX, and UAL Working with USAF TACC to test Interface SWA working based on SLC testing.

Federal Aviation Administration Data Comm 12 Discussion Items TDLS Updated IRD Review –IRD Rev A has NAS CCB approval Interface is available for test (WJHTC and IFCET) –IRD Rev B NAS CCB approval SDB Inputs –Web interface activation delayed for additional testing. SLC Daily Test Coordination Meeting Feedback