Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.

Similar presentations


Presentation on theme: "Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials."— Presentation transcript:

1 Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials Update 3/13/2014 Matt Maki DCL Trials Lead

2 Federal Aviation Administration DTAP Build 7.1 Schedule Update Build 7.1 Limited Climb Via SID Compliance: -Interim Build with KEWR focus -UM169 CVS UL when MAINT ALT Set to NONE -National 7110.65 CVS ATC Implementation set for April 3 -Trials will seek EWR/MEM CVS DTAP waiver thru May 15 -EWR ATC FAT Input Planned Build 7.1 Estimated Schedule: -April 14-15:FAT at Thales -April 16:Install at FAATC -April 17-25:Testing at FAATC -April 28 - May1:Install and SAT at MEM and EWR (Parallel installs)

3 Federal Aviation Administration DTAP Build 7.2 Schedule Update Build 7.2 Full Climb Via SID Compliance: -Compliance with full 7110.65 CVS Changes -CVS, CVS Except Maintain, Maintain ALT Selections -Longer WJHTC lab testing period expected due to CVS scale Build 7.2 Estimated Schedule: -June 11-12:B7.2 FAT at Thales -June 13:Install at FAATC -June 16 - July 3:Testing at FAATC -July 7-10:Install and SAT at MEM and EWR (Parallel installs)

4 Federal Aviation Administration KEWR DCL Trials Status Update UAL, FDX MD11/B777 Daily Ops Ongoing: -Open OPR reports diminishing -UAL FRC DCL Filing Error Reductions -Resuming of UAL B767 ops expected next month+ UPS Starts Daily MD11/B767 Ops March 15: -Approx. 24 Ops/week expected AFS-50/400/2P Approval letter to UK CAA pending: -BAW, SAS, DLH CAA Approval letters back to FAA pending -BAW approval expected first

5 Federal Aviation Administration KEWR DCL Trials Status Update NetJets Trials Participation at KEWR: -NetJets confirmed interest in participating -Kick off Telcon set for March 19 with AOC and Pilot Reps -Bombardier Global Express 5000/6000 aircraft FANS equipped -Bombardier Challenger 350 FANS/VDL2 upgrades expected in July -1-2 DCL flights/week from KEWR expected March 1-4 ZNY 72 HR ERAM Testing Complete: -Test was successful -Next 72 HR ERAM run expected April 5-8

6 Federal Aviation Administration

7 Federal Aviation Administration KMEM DCL Trials Update DTAP Running Stable: -Unplanned Recons minimized – 1 event since last DCIT -Server 1, 2 Re-starts On-going (Tues/Fri) -DTAP Processing 20-40 FDX DCL ops per push -Route Revisions remain minimal/none in #s MEM ATC confirms use of CVS phraseology: - Planned CVS waiver will include MEM

8 Federal Aviation Administration DCL Ops Advantages During Upcoming SWAP Season

9 Federal Aviation Administration Questions ? KUSA