Presentation is loading. Please wait.

Presentation is loading. Please wait.

Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)

Similar presentations


Presentation on theme: "Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)"— Presentation transcript:

1 Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
26 September 2013

2 Production DCL End2End Summary:
Example Changes from Trials Users designate DCL and PDC flights via ICAO Flight Plan filing and Subscriber Data Base (SDB); no more FRC DCL in Field 18 REM/ field CPDLC (Connection establishment) only after ATC approves the DCL No CPDLC “Active Status” if user logs on early (prior to P-Time-30 min) Flights with local (unpublished) arrival procedures (PARs) in the route are now eligible for DCL; will not be cleared for the local arrival procedures until en route NAV Database differences may result in differences for international flights, i.e., “TO” point for UM79? Production uses ERAM NAV DB; Trials has its own Jeppesen UM83 currently in Production system; open issue for post-initial release to put in a switch Gate Request Message to AOCs as separate message, sent when controller approves the DCL Fallback from DCL to PDC capability and user preference to do so

3 Production End2End Document
Based on Trials End2End Action Item from DCIT 26 Draft, and feedback appreciated Any comments to Carol Burr Bruce Notley and Rob Mead


Download ppt "Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)"

Similar presentations


Ads by Google