Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig.

Similar presentations


Presentation on theme: "Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig."— Presentation transcript:

1 Federal Aviation Administration Data Comm 1 Federal Aviation Administration Key Site Timelines Hal Ludwig

2 Federal Aviation Administration Data Comm 2 Key Site Timelines

3 Federal Aviation Administration Data Comm 3 KSLC – Carrier DFV Participation Lead-Up Timeline

4 Federal Aviation Administration Data Comm 4 KSLC Date Testing Window (Tentative) ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Testing w/ WJHTC 07/16 – 07/18 Th, F, Sa Mid-Shift Test mode Testing w/ Carrier 07/19– 07/20 Su, M Mid-Shift Test mode Testing w/ Carrier 07/21 – 07/26 Tu, W, Th, F, Sa, Su Tue-Fri: Mid-Shift or Day & Swing Shift (as Aircraft avail.) 10:45 – 13:00 15:00 – 16:15 17:00 – 18:30 Sat-Sun: Open Active and Back- Up mode Carrier File and Fly 7/27 – 8/07Normal Ops Active and Back- up mode IOC8/7 Note: Mid-Shift is 2200-0300 or 0500 (Local)

5 Federal Aviation Administration Data Comm 5 KIAH – Carrier DFV Participation Lead-Up Timeline

6 Federal Aviation Administration Data Comm 6 KIAH Date Testing Window Tentative ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Testing w/ WJHTC 08/19 – 08/21 W, Th, F Mid-ShiftN/A Testing w/ Carrier 08/22 – 08/23 Sa, Su Mid-ShiftN/A Testing w/ Carrier 08/24 – 08/27 M, Tu, W, Th Mid-Shift or Day & Swing Shift (as Aircraft avail.) Active and Back-Up mode Carrier File and Fly 08/28 – 09/03 F, Sa, Su, M, Tu, W, Th Normal Ops Active and Back-up mode IOC9/3 Note: Mid-Shift is 2200-0300 or 0500 (Local)

7 Federal Aviation Administration Data Comm 7 KHOU – Carrier DFV Participation Lead-Up Timeline

8 Federal Aviation Administration Data Comm 8 KHOU Date Testing Window Tentative ERAM Dispatch (FPL Filing) Local Flight Deck Remote Flight Deck AOC System Testing w/ WJHTC 08/24 – 08/26 M, Tu, W Mid-ShiftN/A Testing w/ Carrier 08/27 – 08/28 Th, F Mid-ShiftN/A Testing w/ Carrier 08/29 – 09/02 Sa, Su, M, Tu, W Mid-Shift or Day & Swing Shift (as Aircraft avail.) Active and Back-Up mode Carrier File and Fly 009/03 – 09/10 Th, F, Sa, Su, M, Tu, W, Th Normal Ops Active and Back-up mode IOC9/10 Note: Mid-Shift is 2200-0300 or 0500 (Local)

9 Federal Aviation Administration Data Comm 9 AOC Interface Scorecard AOC Test Activity% CompleteIssuesNotes ARINC implementation of 6 SMHP Messages100% IFCET implementation of TDLS-CSP IRD / ICD0%726 Fix targeted for CPDLC Release (May) Verify TDLS to CSP Connectivity100% Verify TDLS to CSP to AOC Connectivity100% TDLS to UPS CCI/CCA exchange0%726 TDLS-CSP IRD & ICD compliance planned 5/15 TDLS to United AOC Production0% Tentatively planned for 5/27 TDLS to Southwest AOC Production0% Tentatively planned for 6/3 TDLS to UPS AOC Production Tentatively planned for 6/10 TDLS to FedEx AOC Production Tentatively planned for 6/17

10 Federal Aviation Administration Data Comm 10 Discussion Items TDLS Updated IRD Review SDB Inputs –Will provide notification when the SDB web portal gets turned on