Module Production T. Bowcock. Substrates Twist problem –Further understanding of the warp/weft and layup problem Chirality of the twist –Looks like it.

Slides:



Advertisements
Similar presentations
Solve this equation to find x
Advertisements

Special Right Triangles
How much do you know about bald eagles? Part 2 T. Trimpe 2008
Special Right Triangles Moody Mathematics. Take a square… Moody Mathematics.
TEMPERATURE CONVERSION
Module Production T. Bowcock. News Since Last Meeting Engineering Design Review (20-21 st April) –Mechanics including module and fixtures –Components.
LHCb Velo Electronics PRR
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS EDR LIVERPOOL APRIL 05 Tony Smith.
Mechanical/Thermal Measurements T. Bowcock, J. Carroll.
LHCb VELO Production Visit November 9 th 2005 Introduction to staff Status Schedule.
23-Aug-2005 VELO Production UCD VELO Module Production at Liverpool T. Bowcock.
1 Liverpool Production Status Week of 23 February 2007.
LHCb Velo Construction Authorisation steps Tony Smith.
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
1 Liverpool Production Status Week of 02 March 2007.
Constituent Materials 1 Laminate Plate Theory $100 $200 $300 $400 $500 Potpourri and Processing Composite Laminates $400 $500 Constituent Materials.
Short term offer for 1room apartment in Old Riga Price from 70 EURO per 24h * discount starting from 1 week.
EELE 461/561 – Digital System Design
Presented By: Michael Olka P.E.
Lab Module 05 Entity Routing
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
HV-CMOS Hybridization
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
Special Right Triangles
Special Shortcuts for and Triangles
Special Shortcuts for and Triangles
Hepatitis B Virus. Hepatitis B - Clinical Features Incubation period:Average days Range days Clinical illness (jaundice):
Special Right Triangles
Marzo 2004Flavio Dal Corso INFN-Pd1 Status of Drift Tubes Local Trigger Electronics.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
ATLAS SCT module performance: beam test results José E. García.
Scintillating Fiber, Ribbon Production, Cryo Update Alan Bross MICE Tracker Meeting IC November 8, 2006.
Tony Smith LHCb Velo EDR Liverpool 20-21/04/05 1 HYBRIDS- construction CONSTRUCTION of composite SUBSTRATE - many lay-ups tried – best flatness obtained.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
1 Absolute Pressure Sensors Z. Celik-Butler, D. Butler and M. Chitteboyina Nanotechnology Research and Teaching Facility University of Texas at Arlington.
FFII Module A Hillcrest Fire Department © 2001
P. Riedler- GGT Meeting 3/4/20061 Status of Sensor Irradiation and Bump Bonding P. Riedler, G. Stefanini P. Dalpiaz, M. Fiorini, F. Petrucci.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
Work Breakdown Schedule. Components Research and find all components  Pressure Sensor  Micro controller  LED Display  Operational Amplifier Order.
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
WEEK 1 You have 10 seconds to name…
Do Now 1/9/12 1.) Draw 2 triangles 2.) In the first one, draw the perpendicular bisectors. 3.) In the second one, draw the angle bisectors.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
R&D ON RESISTIVE TECHNOLOGY FOR MICROMEGAS BUKL STEPHAN AUNE 03/06/2015. S.Aune.
Dummy Modules The next step is to build and test 10 thermal modules for tests and distribution. What do we want to test? Thermal performance and variation.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
SLHC SCT Hybrid (CERN 2nd July 2007)1 SLHC SCT Hybrid Concept Ashley Greenall The University of Liverpool.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
VELO Replacement Girish Patel University of Liverpool.
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
T. Bowcock University of Liverpool
WP3 14 April 2016 – Liverpool Status
TIA-1083-A and C63.19 Magnetic Interference Requirements Compared
News about the WA104 Programme
Status of straw production straw module assembling
SCHEDULE Nov 1st - Assembly Table Complete
CMS Perugia Modules Production Review
TEC Module Production Overview
Quality Control – Assurance
OGP Surveying & DB Entry
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg

Presentation transcript:

Module Production T. Bowcock

Substrates Twist problem –Further understanding of the warp/weft and layup problem Chirality of the twist –Looks like it can be controlled It looks like it is a function of the 45°layer. –The current layup is good ~0.5° (Limit about 3°) Pressure identified as part of problem –Reproduce twist at Liverpool by increasing pressure >90psi –Note nominal maximum pressure ~300psi Determine the CF/Epoxy ratios –For our modules ~ 9.9g/Weight (module) –Should be approx 60-68% CF by weight. PAC still quotes at 10/week.

K-05 (Re)-Processing almost complete –Last batch were untestable through overetching Circuits should be ready to laminate next week at Stevenage

Pitch Adaptors All pitch adaptors sent back to CERN for plasma cleaning Current ones not testable –2 controls done in old pas –Damage/deposit on needle

Sensors 8 arrived at Liverpool –Currents ~uA and 0<0.5% percent strips bad. –One with no bad strips Perfect cutting 2 returned to Micron for remeasurement (3 others high in dB) –One recleaned at Micron did not change current

Sensor Testing Problem On new batch of sensors on some detectors measure substantially higher current than micron Complete halt and check for damage to sensors –Inspection of old sensors –Running tests with mechanicals –Tests with quartz Repeat of tests using chuck/kapton –Currents confirmed

Sensor Testing Limited evidence of microscopic liquid from vacuum holes Hypothesis that the jigs were contaminating the sensors (Noryl) 2 nd and 3 rd tier of cleaning of jigs Tests underway 8 Pairs of new (cleaner) jigs under construction for Liverpool and Micron –Acetal rather than Noryl

Bonding & Jigs Now have 4 double sided bonding jigs –1 for backend –2 for frontend –1 for laser system 2 handling frames created (expect about 10 at the end)

Module Production Feet and Bases still in production Paddle Moulds (3 off) still to be made

Testing Equipment Laser rig plate finalized and submitted Thermograph equipment designed (to be reviewed) Gluing equipment expect to start the metrology and programming next week

Summary K-05 circuits close to delivery Twist story still approx 2 weeks from resolution –Living with the twist? Pitch adaptor problems again. Need cleaning? Sensor testing issues uncovered –Micron results look OK All mechanics except the thermograph system and the final paddle-hybrid assembly (twist) ready by July.

Timeline No prototype modules will be completed until end Aug 05 based on current status of K-05 and twist (guesstimate) –4 double sided modules Look for real production start ~ Oct 05