1 WP3 14 April 2016 – Liverpool Status
First batch of unpopulated hybrids from ZOT to be shipped today (confirmed) – will receive tomorrow Where due last week but one hybrid panel failed vendors QC Expecting full complement of 4 panels (32 circuits total) Have yet to get a confirmation date for delivery from Stevenage for remaining 10 panels Should know next week Quotations are in from Norcott for hybrid population, based on either 10 day or 20 day schedule What do we require? Norcott have also feedback information regarding the cleaning of their PCBs after re-flow, vis: Two types of cleaning chemistry used, Vigon A250 and Vigon N600 Vigon N600 is being trialed, close to PH neutral – if shown to be favourable will phase out Vigon A250 Results so far are very good Vignon N600 data link: Cleaning sequence is the same, whichever agent is used: 20 minute wash in the chemical 4 minute rinses in de-ionised water 30 minute drying cycle


Download ppt "WP3 14 April 2016 – Liverpool Status"

Similar presentations


Ads by Google