Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University.

Slides:



Advertisements
Similar presentations
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
The Origami Chip-on-Sensor Concept for Low-Mass Readout of Double-Sided Silicon Detectors M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna.
Construction and Status of the Origami Module Prototype C. Irmler HEPHY Vienna.
5. July 2010 Christian Irmler (HEPHY Vienna), Yoshiyuki Onuki (Tohoku University) 6” Origami Module and Front End Electronics 6 th Open Meeting of the.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Construction and Performance of a Double-Sided Silicon Detector Module using the Origami Concept C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
M.Friedl, C.Irmler, M.Pernicka HEPHY Vienna
19 November 2009 Christian Irmler (HEPHY Vienna) APV25 and Origami Scheme 4 th Open Meeting of the Belle II Collaboration.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
APV25 for SuperBelle SVD M.Friedl HEPHY Vienna. 2Markus Friedl (HEPHY Vienna)11 Dec 2008 APV25 Developed for CMS by IC London and RAL (70k chips installed)
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Kodali Kameswara Rao TIFR, Mumbai
FVTX Review, November 17th, FVTX Mechanical Status: WBS 1.6 Walter Sondheim - LANL Mechanical Project Engineer; VTX & FVTX.
The Mechanical Structure for the SVD Upgrade
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Construction and Status of the Origami Module Prototype C. Irmler, M. Friedl HEPHY Vienna.
DSSD update. 2Manfred Valentan, 3 rd Open Meeting of Belle27-9 July 2009 Outline DSSD design in Vienna: How it is done First test batch of SVD DSSDs Status.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
The Belle II Silicon Vertex Detector assembly and mechanics
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD Ribs and SLM M.Friedl, F.Buchsteiner, R.Thalmeier (HEPHY Vienna) 27 May 2014.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Status & schedule of ladder parts production Oct. 2, 2014 Koji Hara (KEK)
Mechanics Status VXD Mechanics Meeting F.Buchsteiner (HEPHY Vienna) 07 September 2015.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
SVD Electronics Constraints
SVD Introduction Wetzlar SVD-PXD Meeting, 4 February 2013
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Bonding study of wrapping part of PA1/2
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
WG4 – Progress report R. Santoro and A. Tauro.
Comments to the SVD4 structure
C. Irmler, M. Friedl, M. Pernicka HEPHY Vienna
Presentation transcript:

Origami Chip-on-Sensor Design: Progress and New Developments 19th September 2012 TWEPP 2012, C. Irmler (HEPHY Vienna) TWEPP 2012, Oxford University

Outline Introduction Status 2-DSSD Module Cooling Summary 2TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Motivation Belle II SVD (  M. Friedl) Super KEKB –7 GeV e - on 4 GeV e + –Center of mass energy: Y(4S) (10.58 GeV) 3TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 ~1 km in diameter Super KEKB Belle II Linac About 60km northeast of Tokyo SVD Requirements: –Twice as large –Low material budget –Low occupancy –Fast readout (APV25) –High SNR –Chips closest to sensor strips Origami Chip-on-Sensor Concept

The Origami Chip-on-Sensor Concept 4TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 CF reinforced ribs 6” DSSD 1mm Airex sheet 3-layer polyimide PCB Thinned APV25 Connection to Strips: –PA on top side –wrapped PA for bottom Single cooling pipe Trade-off between material budget & SNR 0.55 X 0 (averaged) n-side p-side

Belle II SVD 5TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 APV25 chips Cooling pipe Origami ladder Sensor underneath flex circuit Pitch adapter bent around sensor edge End ring (support)

Belle II SVD 4 layers of 6” DSSDs Radii: 38/80/105/135 mm 2/3/4/5 sensors per ladder Origami PCBs in L4-6 L3 & edge sensors read out by conventional hybrids 3 different PCB designs 6TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Outline Introduction Status 2-DSSD Module Cooling Summary 7TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Origami PCBs 3 types of 3-layer Origami PCBs: –backward (-z), short tail –center (ce), for central sensor, long tail –forward (+z), routed along slanted sensor, complex shape 8TWEPP 2012, C. Irmler (HEPHY Vienna)19th September z ce +z

Pitch Adapters All available in single- and double-layer designs PA0: short, n-side, glued onto Origami PCB PA1: first half of p-side strips PA2: second half of p- side strips 9TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 Bond pads of single-layer PAs

The Evolution of Origami Modules 2008: Introduction of concept 2009: Feasibility shown with 4” DSSD module 2010: First full-size module with 6” DSSD 2011: Re-design to fit mechanical requirements of Belle II SVD ladders, beam test with CO 2 cooling, … 10TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

2012 How to assemble ladder with two or more Origami PCBs? Not possible sensor by sensor Combined procedure required 2-DSSD Origami module –2 HPK DSSDs –Two types of Origami PCBs (-z and ce) –Single-layer PA0/PA1/PA2 11TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Outline Introduction Status 2-DSSD Module Cooling Summary 12TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Assembly Location Kavli IPMU Institute for the Physics and Mathematics of the Universe Belongs to Tokyo University Kashiwanoha Campus New clean room and lab for L6 ladder assembly 13TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 ~30km north of Tokyo

Team K. Kamesh (TIFR), C. Irmler (HEPHY), Y. Onuki (Tokyo U.), K. Negishi (Tohoku U.) 14TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 E. Kato (Tohoku U.) N. Shimizu (Tokyo U.)

Attaching of PA1 & PA2 15TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 Almost unchanged procedure PAs were aligned to sensor and then picked up with a vacuum jig New: mask to apply glue Ensures uniform thickness Future: cutting plotter mask samples Graphtec CE

Attaching Origami PCBs Wire bonding p-side Placing sensors onto an assembly bench Optical alignment (not done this time) Attaching Airex sheets (in future: 1 per ladder) Glue Origami PCBs –pre-assembled APV chips –first CE –then –z Wire bonding n-side 16TWEPP 2012, C. Irmler (HEPHY Vienna)19th September z CE

Bend and Glue PA1, PA2 17TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 Already established procedure Micro positioner with vacuum head Masks to dispense glue Pre-bend PA and align vacuum head Align PA to APV and lower down Glue curing Followed by ~2500 wire bonds

Final Module in Frame 18TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 Top and bottom views (w/o cooling pipe)

Outline Introduction Status 2-DSSD Module Cooling Summary 19TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Cooling Pipe 20TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 Cooling pipe Single cooling pipe for several ladders –Little space for connections –Outer  1.6 mm Custom fixture to hold the pipe

Cooling Contact – Pipe on APV25 Chips Requirements: Re-mountable cooling coil (no glue …) Easy and safe mounting (bond wires …) Electrically isolating Radiation hard material Avoid stress at sensor Efficient heat transfer –large contact area –adjust height differences of APVs –thermally conductive gap pads 2119th September 2012TWEPP 2012, C. Irmler (HEPHY Vienna)

Thermal simulations Thermally conductive Gap Pads Heatload/APV: 0.35W Coolant temperature: -20°C Tube: stainless steel AISI 316L, wall 50μm Gap pad: 86/125 Keratherm λ [W/mK]: 1.5W/mK Very soft, 1mm thick Radiation hardness?  Will be tested in October 19th September 2012TWEPP 2012, C. Irmler (HEPHY Vienna)22

Pipe Fixture – First Concepts Prototype 'big' screw clamp One part clamp Screws Too bulky Structure is fragile and the contact surface is small Large force necessary to snap tube into the clamp 19th September 2012TWEPP 2012, C. Irmler (HEPHY Vienna)23

Pipe Fixture – Improved Design Hinge clamp: PEEK G450 micro water jet cutting –fabrication tolerance: 0.01mm –Max. wall thickness:20mm –Min. inner radius:0.1mm Disadvantage: 2 parts First prototypes delivered Used on 2-DSSD module 19th September 2012TWEPP 2012, C. Irmler (HEPHY Vienna)24

Cooling Pipe Mounting Clamp bases glued onto Origami PCB Keratherm strips placed onto APV chips Pipe put into camp bases Clamps closed 25TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Final Module with Cooling Pipe 26TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Performance of CO 2 Cooling Three 6” Origami modules were tested in a 120 GeV beam (October 2011) Stable operation of CO2 cooling system for 3 days The sum of bias currents of sensors decreases from >70µA to ~20µA 27TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 Bias current of all 3 modules vs. time CO 2 system off CO 2 system on 24h 4h Pressure reduction for lower temperature

2-DSSD Origami Module Performance A week ago: first source test of new module with CO 2 cooling So far the module works well Ready for beam test in October 28TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 preliminary

Outline Introduction Status 2-DSSD Module Cooling Summary 29TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Summary Origami chip-on-sensor concept adapted to fit requirements of Belle II SVD ladders –6” sensor, three flex designs Assembly procedure extension to full ladder –in progress Design and first prototypes of pipe fixture Recently assembled a 2-DSSD Origami module Beam test and irradiation in October 2012 Start of ladder production scheduled for summer 2013! 30TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Thank You 31TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Spare Slides 32TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Improved Version of One Part Clamp 33TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Attaching Airex We used one piece per sensor Later we will use a single sheet per ladder 34TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Attaching Origami hybrids 1.Aligned CE to sensor 2.Lifted it with Origami jig 3.Applied glue 4.Put back onto assembly bench 5.Waited until glue has been cured 6.Removed Origami jig 7.Aligned –z to sensor 8.Repeated from step 2. 35TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Attaching Origami hybrids 36TWEPP 2012, C. Irmler (HEPHY Vienna)19th September & 5

Attaching Origami CE 37TWEPP 2012, C. Irmler (HEPHY Vienna)19th September

Attaching Origami -z 38TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012

Bend and Glue PA1, PA2 – Apply Mask 39TWEPP 2012, C. Irmler (HEPHY Vienna)19th September : flatten glue 2 3: dispense glue 1: apply mask 5: remove mask

Pre-bend and attach stopper 40TWEPP 2012, C. Irmler (HEPHY Vienna)19th September 2012 Stopper for PAs pre-bended PA 6 align vacuum head to assembly bench and PA design concept of PA stopper

Align PA to APV chips 41TWEPP 2012, C. Irmler (HEPHY Vienna)19th September : PA to APVs 8: lower down 9: cure glue Bond pads visible

Thermally conductive Gap Pad Responsible for Origami cooling: Annekatrin Frankenberger Selection of thermally conductive materials with different properties. 42TWEPP 2012, C. Irmler (HEPHY Vienna)19th September /125 Keratherm 2000S40 Bergquist 575-NS Parker Chomerics Sil Pad 800 Bergquist λ [W/m K] Hardness [Shore 00] Shore A 91 Thickness [mm] – – Silicone xx--x Radiation hardness ???x  Gamma irradiation tests Mol in October)

Thermal simulations Thermally conductive Gap Pads Heatload/APV: 0.35W Coolant temperature: -20°C Tube: stainless steel AISI 316L, wall 50μm Gap pad: Sil Pad 800 Bergquist λ [W/mK]: 1.6W/mK Hardness Shore A: 91 Thickness: 0.1mm  good contact? Adjusting unevennes? 19th September 2012TWEPP 2012, C. Irmler (HEPHY Vienna)43

Tube fixture Displacement simulation Necessary displacement UX = -0.4mm Acting force 1.4N 19th September 2012TWEPP 2012, C. Irmler (HEPHY Vienna)44