The backplane and crate infrastructure for the digital processors of the ATLAS Level-1 Calorimeter Trigger (L1Calo) are presented, The L1Calo system is.

Slides:



Advertisements
Similar presentations
Special Mines Services An Employee Owned Company.
Advertisements

ZH and ZR Connectors To introduce the ZH crimp style and ZR insulation displacement wire-to-board connector series.
SYSTEM 2000.
Multi-Drop Sealed Connector System Introduction Fully sealed to IP66 & 67, the Multi-Drop Sealed Connector System uses cable-pierce technology to offer.
VL Connector To introduce the VL wire-to-board and wire-to-wire, crimp style connector series.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Safely Using Drill Collar Clamps
Assembling a Functional Multi-Wire Proportional Counter - Page 1 Work in pairs. One person will take the chamber apart, and the other will reassemble it.
MFS, MPO 4/8/12-Fiber connectors and Fan-Out assemblies.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. Insert Photo Here OneGear™ 7.2kV Motor Control Center.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
JWPF Connector Wire –to-Wire Wire –to-Board
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
I have almost 20 years experience in the components and devices used in industrial control, instrumentation and automation applications. Before I came.
8 th Workshop on Electronics for LHC experiments - Colmar- September 9 th -13 th 2002Gilles MAHOUT Prototype Cluster Processor Module for the ATLAS Level-1.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
RPC Electronics Overall system diagram –At detector –Inside racks Current status –Discriminator board –TDC board –Remaining task.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer JEM Status and plans Algorithms Hardware JEM0, JEM1 Tests Plans.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
SH / SR Connectors PURPOSE: To introduce the SH crimp style and SR insulation displacement wire-to-board connector series.
Sales Training Outline 2006 Jeff Roye Product Manager DIN Enclosures 35 Royal Road Flemington, NJ
The backplane and crate infrastructure for the ATLAS Level-1 calorimeter processor (L1Calo) are presented, The L1Calo system is a relatively compact, high-
ZTF Interconnecting Scheme Stephen Kaye
Table of Content – High Power Connector Power + Signal, Blade Style Contact Table of Content – High Power Connector Power + Signal, Blade Style Contact.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
Typical product developments and applications JF Daucourt Product Development & Quality Manager.
Hardware proposal for the L2  trigger system detailed description of the architecture mechanical considerations components consideration electro-magnetic.
MSS2 HARDWARE ASSEMBLY  FROM LAURENT DERONT. FORMAT STANDARD 6U CRATE  1 ST BACKPLANE INTERFACE CONNECTOR DB37 (Front side) TO DIN (Back Side) 1.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Table of Content – High Power Connector Power + Signal, Blade Style Contact Table of Content – High Power Connector Power + Signal, Blade Style Contact.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Sageon Power Module Distribution Sageon Rack Trim Pieces.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
12 th Workshop on Electronics for LHC experiments - Valencia- 25 th - 29 th Sept. 2006Gilles MAHOUT Production Test Rig for the ATLAS Level-1 Calorimeter.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Abstract A small portable test system for the TileCal Digitizer system Attila Hidvégi (1), Daniel Eriksson (1) and Christian Bohm (1) (1) Fysikum, Stockholm.
HF Source Drivers Performance Observations and Recommendations Paul Debbins University of Iowa Nov. 10, 2004.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Terminal Splitters in a Cabinet December Terminal Splitters in a Cabinet The purpose of this presentation is to share our findings around the.
FLATPACK Rev.5 September 2002 Updated versions may be available.
RuggedPOD Proto 1 bugs SDS team Wolfe Engineering.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Meeting CERN 28 Nov A.B.Lodge - RAL 1 ECAL CMS ECAL Mechatronics Task Force Meeting.. CMS ECAL Mechatronics Scheme Applicability to EE Meeting held.
Samuel Silverstein, Stockholm University For the ATLAS TDAQ collaboration The Digital Algorithm Processors for the ATLAS Level-1 Calorimeter Trigger.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA UNCLASSIFIED LAUR Working in Radiation Environments 2016.
Baby-MIND Modules & Services
D. Breton, S. Simion February 2012
J. R. A Booth, D. G. Charlton, C. J. Curtis, P. J. W. Faulkner, S
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Project guide B. SUBBULAKSHMI M. E Assistant Professor C. A. R
Industrial Skills Fasteners & Hardware.
JWPS Connector Wire-to-wire and Wire-to-board
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
ATLAS: Level-1 Calorimeter Trigger
L1Calo Joint Meeting Introduction
BPM Microsystems, LP.
1.11: Robot Controller.
Presentation transcript:

The backplane and crate infrastructure for the digital processors of the ATLAS Level-1 Calorimeter Trigger (L1Calo) are presented, The L1Calo system is a compact, high-performance real-time system based on a custom, monolithic 9U backplane populated almost completely with 2mm Hard Metric connectors. The high pin count and monolithic design present challenges including high insertion/extraction forces, and maintenance and repair over the lifetime of LHC. We have developed solutions for these issues, as well as providing infrastructure for power distribution and cable strain relief, while maintaining accessibility, Abstract Services Mating forces Introduction Real-time systems developed for LHC typically require high channel density and interconnectivity between modules. To achieve these goals, most system designers use 2mm Hard Metric (HM) connector systems to provide the desired pin counts. 2mm HM connectors introduce new problems for system designers. With insertion forces of up to 0.75N per pin, a 9U module requires hundreds of Newtons to insert or remove. And exposed male backplane pins are easily bent and damaged, presenting serious long-term maintenance issues over the lifetime of LHC. Crate infrastructure and power distribution must be designed to allow maximum accessibility for maintenance.. The ATLAS Level-1 Calorimeter Trigger [1] uses a common system-crate architecture for the EM/Tau cluster and Jet/Energy-sum processor subsystems using a custom monolithic backplane with very high signal densities. It is a demanding application that highlights these potential problems, and part of our development work has been to find integrated solutions for force reduction, integrated cable strain relief and power distribution, while providing maximal access for testing as well as long-term maintenance and repair. [1] The ATLAS Level-1 Calorimeter Trigger Architecture, IEEE Transactions on Nuclear Science, Vol 51, No. 3, June 2004 Maintenance and Repair High-Density Backplanes: Problems and Solutions Samuel B. Silverstein, Stockholm University, Stockholm, Sweden For the ATLAS Level-1 Calorimeter Trigger Collaboration Backplane and Crate The processor backplane (PB) is a monolithic construction with 9U height and 21 single-width module positions. It is populated almost entirely with 2mm HM connectors, with 1148 signal and ground pins to each processor module. The PCB is 4.9mm thick, with 8 signal layers and 10 ground planes, Up to 384 serial LVDS cable assemblies, plus two rear transition modules for system merger cables, are connected to the rear side of the backplane. Three high-current DIN connector pins at the bottom of each module position deliver up to 20A of low-voltage (3.3V and 5V) current. The backplane is installed in CERN-standard Series 6000 LHC crates [2], which have been modified to accommodate our custom power distribution, cable strain relief, and module insertion/extraction system. [2] See or the CERN ESS website With 1148 signal pins per module position, the nominal insertion force for a typical module is nearly 500N, and the extraction force over 400N. Without reinforcement the backplane PCB bows horizontally during insertion/extraction. The resulting pin misalignment adds dramatically to the mating forces. We use six vertical brass reinforcement ribs that are 20mm deep and 5mm wide. These fit in the gaps between module positions, and are bolted to the top and bottom extrusions through the backplane. Two retention bolts at 1/3 and 2/3 of the backplane's height secure the backplane against extraction forces. This configuration dramatically reduces backplane bowing during insertion and extraction, giving a maximum displacement of less than 1mm. Threaded holes on the back of the ribs provide mounting points for the power bus bars and cable strain-relief system. IEEE handles [3] apply leverage against special front crate extrusions to provide the high insertion/extraction forces necessary. We have observed vertical bowing of these crate extrusions, resulting in a poor grip that causes the handles to slip and accelerates wear on the handles and crate. The wear issue has been addressed by using solid aluminum handles for final production [4]. Flexing can be reduced by the practice of tightening the front-panel screws on inserted modules to provide vertical reinforcement. of the extrusions. Finally, guide pins on each module [5] ensure correct alignment during mating. This reduces the force of initial contact, and protects the pins from damage. [3] American National Standard for VME64x 9U 400mm Format, 1997 [4] Triple E Corporation, [5] Tyco/AMP part number The backplane reinforcement system also serves as a mounting point for the cable strain relief system and the power distribution bus bars. The cable strain relief system provides secure retention for up to pair LVDS serial cable assemblies that provide the processor modules with input data. Vertical "forks" straddle the cables at each module position, and secure the connectors within the connector shrouds. A robust power bus bar assembly of 6mm copper is mounted at the bottom of the backplane and distributes 5V and 3.3V power to each of the 21 modules through three high current pins [6] rated at 20A each. The ground pins are make-first break- last to minimize the risk from an accidental live extraction. [6] E.g. see ERNI part number When signal pins become damaged, a repair and replacement procedure is critical. Tyco/AMP produces a toolkit [7] that we have successfully used for field replacement of single connector pins, without removing the backplane from the crate. This kit works best for AMP brand connectors, whose pins are loaded into the front of the shroud and held in place by friction. Other connector brands such as ERNI are less suitable for field repair, since the pins are loaded from the back of the shroud, and are therefore less easily extracted. Nevertheless we have also succeeded in replacing several ERNI pins with the AMP toolkit with satisfactory results. R. Achenbach 2, V. Andrei 2, B.M. Barnett 5, B. Bauss 3, C. Bohm 6, J.R.A. Booth* 1, I.P. Brawn 5, D.G. Charlton 1, C.J. Curtis 1, A.O. Davis 5, J. Edwards 5, E. Eisenhandler 4, P.J.W. Faulkner 1, F. Föhlisch 2, C.N.P. Gee 5, C. Geweniger 2, A.R. Gillman 5, P. Hanke 2, S. Hellman 6, A. Hidvégi 6, S. Hillier 1, E.-E. Kluge 2, M. Landon 4, K. Mahboubi 2, G. Mahout 1, K. Meier 2, V.J.O. Perera 5, W. Qian 5, S. Rieke 3, F. Rühr 2, D.P.C. Sankey 5, U. Schäfer 3, K. Schmitt 2, H.-C. Schultz-Coulon 2, S. Silverstein 6, R.J. Staley 1, S. Tapprogge 3, J.P. Thomas 1, T. Trefzger 3, D. Typaldos 1, P.M. Watkins 1, A. Watson 1, P. Weber 2, E.-E. Woehrling 1 1 School of Physics and Astronomy, University of Birmingham, Birmingham B15 2TT, UK 2 Kirchhoff-Institut für Physik, University of Heidelberg, D Heidelberg, Germany 3 Institut für Physik, University of Mainz, D Mainz, Germany 4 Physics Department, Queen Mary, University of London, London E1 4NS, UK 5 CCLRC Rutherford Appleton Laboratory, Chilton, Didcot, Oxon OX11 0QX, UK 6 Fysikum, Stockholm University, SE Stockholm, Sweden * Also at CCLRC Rutherford Appleton Laboratory The ATLAS Level-1 Calorimeter Trigger Collaboration For more extensive damage the backplane should be removed from the system and entire connectors replaced, usually by an external company. The backplane and its hardware are assembled as a single unit that can be relatively easily removed and replaced for this purpose. [7] Tyco/AMP part number