DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

DAQ for the TPC Sector Test at Test Beam T10 ALICE DAQ Group ALICE TPC Collaboration Meeting Cagliari, Sardinia 16 – 17 May 2004.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
1 Databases in ALICE L.Betev LCG Database Deployment and Persistency Workshop Geneva, October 17, 2005.
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
1P. Vande Vyvre - CERN/PH ALICE DAQ Technical Design Report DAQ TDR Task Force Tome ANTICICFranco CARENA Wisla CARENA Ozgur COBANOGLU Ervin DENESRoberto.
11/12 December 20061Borge S. Nielsen, NBI FMD contribution Second Installation and Commissioning Workshop DAQ and ECS FMD contribution Børge S. Nielsen,
DAQ for Test&Commissioning at Point 2 Klaus Schossmaier CERN PH-AID ALICE TPC Collaboration Meeting Heidelberg, Germany February 2004.
Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006.
1 HLT – ECS, DCS and DAQ interfaces Sebastian Bablok UiB.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Jochen Thäder – Kirchhoff Institute of Physics - University of Heidelberg 1 HLT for TPC commissioning - Setup - - Status - - Experience -
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky TIM OVERVIEW1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
MSS, ALICE week, 21/9/041 A part of ALICE-DAQ for the Forward Detectors University of Athens Physics Department Annie BELOGIANNI, Paraskevi GANOTI, Filimon.
ALICE DAQ Plans for 2006 Procurement, Installation, Commissioning P. VANDE VYVRE – CERN/PH for LHC DAQ Club - CERN - May 2006.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
R. Fantechi. DAQ tools My feelings Not dealing with readout stuff No TEL62, no CREAMS, etc But the auxiliary software needed to run the experiment After.
1 Alice DAQ Configuration DB
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Greg Sullivan University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
The ALICE Data-Acquisition Software Framework DATE V5 F. Carena, W. Carena, S. Chapeland, R. Divià, I. Makhlyueva, J-C. Marin, K. Schossmaier, C. Soós,
TB Peter Glässel, Heidelberg1 TPC Progress.
Local Trigger Unit (LTU) status T. Blažek, V. Černý, M. Kovaľ, R. Lietava Comenius University, Bratislava M. Krivda University of Birmingham 30/08/2012.
ALICE Computing Model The ALICE raw data flow P. VANDE VYVRE – CERN/PH Computing Model WS – 09 Dec CERN.
Roberto Divià, CERN/ALICE 1 CHEP 2009, Prague, March 2009 The ALICE Online Data Storage System Roberto Divià (CERN), Ulrich Fuchs (CERN), Irina Makhlyueva.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
F.Carena, CERN/ALICE The ALICE Experiment Control System F. Carena / CERN-PH.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
NA49-future Meeting, January 26, 20071Ervin Dénes, KFKI - RMKI DATE the DAQ s/w for ALICE (Birmingham, Budapest, CERN, Istanbul, Mexico, Split, Zagreb.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
The Past... DDL in ALICE DAQ The DDL project ( )  Collaboration of CERN, Wigner RCP, and Cerntech Ltd.  The major Hungarian engineering contribution.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
Status of the Shuttle Framework Alberto Colla Jan Fiete Grosse-Oetringhaus ALICE Offline Week October 2006.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
Management of the LHCb DAQ Network Guoming Liu *†, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Monitoring for the EMEC/HEC Combined Run in August HEC/FCAL/Combined Testbeam Meeting 16 April 2002 Rob McPherson for the UVic group (Fincke, Kanaya, Keeler,
Status of Integration of Busy Box and D-RORC Csaba Soós ALICE week 3 July 2007.
R.Divià, CERN/ALICE 1 ALICE off-line week, CERN, 9 September 2002 DAQ-HLT software interface.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
COMPASS DAQ Upgrade I.Konorov, A.Mann, S.Paul TU Munich M.Finger, V.Jary, T.Liska Technical University Prague April PANDA DAQ/FEE WS Игорь.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
P. Vande Vyvre – CERN/PH for the ALICE collaboration CHEP – October 2010.
Sergio Vergara Limon, Guy Fest, September Electronics for High Energy Physics Experiments.
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
Straw (T)DAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
The ALICE Data-Acquisition Read-out Receiver Card C. Soós et al. (for the ALICE collaboration) LECC September 2004, Boston.
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Status of NA62 straw readout
LHC experiments Requirements and Concepts ALICE
TPC Commissioning: DAQ, ECS aspects
ALICE Trigger Upgrade CTP and LTU PRR
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
TPC Status Outline Completion of installation 14 September 2006
ITS combined test seen from DAQ and ECS F.Carena, J-C.Marin
M. Krivda for the ALICE trigger project, University of Birmingham, UK
Presentation transcript:

DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena

6 July 2006DAQ, ECS for TPC commissioning2 DAQ Setup for TPC Commissioning TDS LDC GbE Switch (HP) LDC 6x DRORC PX24/CR2 PC (SLC4): operation PC (SLC4): operation HLT-LDC 1x DRORC PX24/CR1 RCU SIU SXL2 GDC TDSM Server: DAQ, ECS, MySQL, MOOD Gateway aldaqtds03 2x 1.4 TB RAID5+spare, XFS aldaqcon02 RCU SIU 6x DDG 1x DRORC Server: SLC3,DHCP, DNS,… pcald25 /local (160GB) aldaqds001aldaqds002 /mdlocal aldaqpc001 aldaqpc013aldaqpc010aldaqpc012aldaqpc011 SLC Castor DATE 5.16  MySQL MOOD ECS MB/s (to be upgraded) /tds PC: TPC monitoring aldaqpc021 GDC TDSM aldaqpc002 aldaqcon03 /tds1 LTU TTCvi, TTCex lnxpool13 TTC GbE Switch GPN HLT Farm — Sector1 —— Sector2 —

6 July 2006DAQ, ECS for TPC commissioning3 Changing from one sector to another Equipment Ids must be changed –Equipment Ids == data origin (i.e. from which sector) –Table of equipment Ids agreed (TPC, Offline, DAQ, HLT)

6 July 2006DAQ, ECS for TPC commissioning4 Working with HLT mode A+ A+ –Data sent to HLT farm (splitters on and ‘forced’) –DAQ does not receive data from HLT (no HLT LDCs)

6 July 2006DAQ, ECS for TPC commissioning5 LTU-proxy A component of the ECS/TRIGGER interface –A process running on the VME crate where the TPC trigger partition (LTU, TTCvi, TTCex) is located (lnxpool13) Is configurable –Two run modes (BC and pulser/edge) –In BC mode allows the selection of the event frequency –SOD and EOD events can be enabled/disabled Not a debugging tool –Does not offer all the feature of the ‘vmecrate ltu’ interactive program (A.Jusko) Gives to the ECS the control of the LTU –Connected to the DAQ network (ethernet over fiber) Under the ECS control, it allows the generation of sequences of events starting with a SOD event and ending with an EOD event

6 July 2006DAQ, ECS for TPC commissioning6 HLT-proxy A component of the ECS/HLT interface Will run on the HLT farm For the time being we can use for test purposes a dummy version or (better) the HLT-proxy with TaskManager emulation provided by S.Bablok The HLT-proxy with TaskManager emulation runs on the same machine as the Detector Control Agent

6 July 2006DAQ, ECS for TPC commissioning7 ECS: TPC Detector Control Agent Controls standalone runs –Starts / stops DAQ and Trigger (LTU) –Dummy DCS for the time being Detector always ready –Dummy HLT-proxy or HLT-pxoxy with taskManager emulator provided by S.Bablok Receive the right sequence of commands It is a good starting point for the required development

6 July 2006DAQ, ECS for TPC commissioning8 DCA: before starting a standalone run

6 July 2006DAQ, ECS for TPC commissioning9 Output messages from HLT-proxy

6 July 2006DAQ, ECS for TPC commissioning10 DCA: after a standalone run

6 July 2006DAQ, ECS for TPC commissioning11 To do DAQ: –Installation of DATE V5.19 (Monday 10 July 2006) Main difference TDSM (migration of files to CASTOR) Probably the last version supported on SLC3 ECS: –Interaction with a real DCS –Interaction with a real HLT-proxy –Implementation of various types of runs Pedestal runs (in progress) –Implemented in ECS –Roland preparing the required scripts –To be tested this week Datapath Test runs Calibration Pulser runs Physics runs –Require a close collaboration with Luciano, Uli, Roland, ….

6 July 2006DAQ, ECS for TPC commissioning12 Pedestal runs: ready for testing