©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.

Slides:



Advertisements
Similar presentations
The process whereby human beings convert raw materials into finished products or useful goods designed to make ____ product ______ one on-site.
Advertisements

SHORELINE SCHOOL DISTRICT Site & Facilities Assessment September 22, 2008 SHORECREST HIGH SCHOOL.
Tam Valley School Modernization - Phase 1 Summer 2011.
Oakwood Presbyterian Church Feasibility Study 10/02/2012Copyright Hoffman Architecture The Trellis and the Vine Oakwood Presbyterian Church.
Addressing Highest Priority Facility Needs
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
eQuest Quick Energy Simulation Tool
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
The Franklin Care Center Addition and Renovation Franklin Lakes, New Jersey Jennifer Curley Lighting/Electrical Option Faculty Advisor: Dr. Moeck.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Capital Project Presentation As approved through formal resolution by the RCS Board Of Education on March 11,2015. This new presentation outlines the $750,000.
pae consulting engineers, inc. Nick Collins, P.E., LEED™ AP
Glenbard Township High School District 87 Facility Master Plan Steering Committee July 20, 2011.
Building Expansion Project Update ECCC 4.9 Growth Strategy We will continue to grow as a “one site multi congregations & services” church.
 Today, the church has 82 members plus a growing number of children and offers 5 Sunday school classes each week for children and adults, as well as.
NEW MERCY CENTER. Dramatic 35 foot tall Bright Silver Building entrance cross. Recognition by custom engraved plaque. This Cross will be up lit at night.
Building Plan Presentation The Evangelical Lutheran Church of The Holy Trinity.
Facilities Update Site Improvements Encinitas Union School District September 5, 2006.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
Church Renovation/ Expansion Proposals Willowdale.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
SUSTAINABLE RESIDENTIAL DESIGN PROJECT SIKESTON HOUSE Project 12 DS 413 MAY 8 TH, 2012.
A SUSTAINABLE RESIDENTIAL DESIGN PROJECT Project 1 DS 413: Design Studio 413 May 9, 2012.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Overview of HMS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
ACOUSTICS (EF) WALL STRUCTURE FOR SOUNDPROO FING (EF) NOISE ABATEMENT (C) SPECIAL NEEDS STUDENTS EQUIPMENT (C) PROPERLY EQUIPPED WITH TEACHER RESOURCES.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Design of HVAC systems for bld 3862 – LHCb control room and for bld 2885 – LHCb new workshop.
NOW, to what we have already achieved… We have a new roof on sanctuary and ground work to prevent prior water issues…..
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
Tangible Property Regulations Presented by David W. Jennings, CPA.
CTRA Green Features. 1. Green Roof 2. Hot Water Solar Heaters These are a type of solar panel. It is called evacuated tube collectors and they heat our.
October 15, 2012 Oakwood Presbyterian Church Feasibility Study Design Meeting 2 Copyright Hoffman Architecture /02/20121.
Questions From these four questions yielded the following cards… 1)Thinking of Facilities….What’s needed to create a “comfortable” learning environment?
Facilities for a Quality Child Development Program Child Services II.
Advanced Energy Engineering Technology Modeling Building Energy Systems Session 9: Modeling heating and cooling systems.
Team 3. …Because the next generation of building is restorative. East Halls.
HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO COMMUNITY UNIT SCHOOL DISTRICT 3 HILLSBORO, ILLINOIS High School Building Project.
Building Lighting Controls
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Energy Conservation Building Upgrades Alma School District.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
Bethany Room Pre-K Sunday School and general storage. Room is very long and has access from each end and from parlor. No closets. INVENTORY – CURRENT USEIMMEDIATE.
ESKOM - MWP NEW ENERGY CENTRE Mechanical Installation 16 April 2014.
Facilities Focus Group
Shilshole Bay Marina Customer Service Buildings
White Pigeon Community Schools
Vassar strong vision Inspire Future Excellence…Learn, Achieve, Succeed
OABCIG General Obligation Bond Referendum Presentation
A10.01 Project Description:
Capital Projects Requests
Cornwall Central School District
A10.01 Project Description:
ISA Prime Developments
Troy School District Bond Program – Series 1 Construction Update
Mary Queen of Apostles Facilities Master Plan Update
The summer of 2018 and all the work that has taken place
Capital Outlay Workshop
Community Life at St. Giles
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Park Place Wesleyan Gala 2019
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009

©2009 Strang, Inc. Option 1 Remodeled Entry and Coats Welcome Space Renovation New Restrooms and Showers Transform Fellowship Hall Unisex Toilet Update Office Finishes Update Classroom Wing Finishes

©2009 Strang, Inc. Option 1 Roofing and Exterior Wall Repair Window Replacement Some Landscape Improvement Basement Used for Storage and Mechanical Only Replace existing electrical panels. Replace Fire Alarm system. Upgrade inefficient lighting.

©2009 Strang, Inc. Option 1 Add air economizer to existing AHUs Updated controls (DDC) to improve operating efficiency Classroom wing: Add ventilation air system Classroom wing: Rework existing hot water baseboard Replace existing boiler with 2 high efficiency boilers Replace water heater with new high efficiency unit Add solar water heating system. $800,000

©2009 Strang, Inc. Option 2A OPTION 1 PLUS: Relocated Office Suite Remodel Office Suite into Adult Classroom Fully Remodeled Entry Sequence Skylights at Reception Classroom Reconfigurations Add small zoned HVAC system for relocated office area Add new zoned HVAC system for new adult classrooms $1,200,000

©2009 Strang, Inc. Option 2B *OPTION 2A PLUS: Expansion of Worship Hall Seating Larger, More Flexible Chancel New Window behind Chancel Improved Worship Hall Sightlines Upgraded Finishes throughout Facility Add rooftop A/C Unit to Serve Entire Classroom Wing Rework Existing Cooling Unit at Chancel Area of Worship Hall $1,700,000

©2009 Strang, Inc. Option 3 *OPTION 2B PLUS: 4,800 SF Classroom Addition Chapel Lounge Significant landscape improvement Add Larger Rooftop A/C Unit to Serve Entire Classroom Wing $2,700,000

©2009 Strang, Inc. Entry & Reception Intuitive Wayfinding Skylit Reception Sightlines from Reception to Entry Security Improvements Widened Corridor Additional Coat Storage

©2009 Strang, Inc. Entry & Reception Intuitive Wayfinding Skylit Reception Sightlines from Reception to Entry Security Improvements Widened Corridor Additional Coat Storage

©2009 Strang, Inc. Welcome Space Expanded Square Footage Improve Flow Open and Flexible Transparency between Worship & Fellowship Areas Visual Connectedness Overflow Opportunities Improved Lighting Quality (Indirect) Sustainable Material Selections Re-Used Stained Glass

©2009 Strang, Inc. Fellowship Hall

©2009 Strang, Inc. Fellowship Hall Warm and Inviting Space Strengthening Relationship to Creation and Outdoors with Natural Sunlight Focal Point at South End with Interplay of Sunlight with Colored Glass and a Sculptural “Brise Soleil” Curved Panels Creating “Vaulted” Ceiling Look Carpet with Labyrinth Wood Trim and Light Cove Adjacent Classrooms Convertible to Lounge and Chapel

©2009 Strang, Inc. Fellowship Hall Paneled “Stage” Backdrop with Storage Area and Stage Crossover behind it Cutaway Detail View

©2009 Strang, Inc. Existing Worship Hall

©2009 Strang, Inc. Proposed Worship Hall Visual Connections to Nature Larger, More Flexible Chancel Expanded Choir Music Area Expanded Seating

©2009 Strang, Inc. Questions?