Fusion Experiment WENDELSTEIN 7-X

Slides:



Advertisements
Similar presentations
DuraDrive VBB/VBS Series Ball Valves and Actuators
Advertisements

Variations of the Turing Machine
ITER Organization, Cadarache, France
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Silicon Technical Specifications Review General Properties Geometrical Specifications Technology Specifications –Mask –Test Structures –Mechanical –Electrical.
EN 407. OH 1..
TPC meeting, Sardinia, May 2004Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Sardinia, May 2004 Børge Svane Nielsen Niels Bohr.
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
ASIPP Zhongwei Wang for CFETR Design Team Japan-US Workshop on Fusion Power Plants and Related Advanced Technologies February 26-28, 2013 at Kyoto University.
Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
Chapter Four Fits and Tolerances: Linear and Geometry.
Status Update on Mechanical Prototype in Rome November 6,
Study on supporting structures of magnets and blankets for a heliotron-type fusion reactors Study on supporting structures of magnets and blankets for.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Physics of Fusion power Lecture 7: Stellarator / Tokamak.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
Reconfigurable Inspection Machine (RIM). NFS Engineering Research Center for Reconfigurable Manufacturing Systems College of engineering, University of.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Page 1 Christian Grefe, DESY FLC Status of PCMAG fieldmapping analysis Annual EUDET Meeting Paris, Status of PCMAG fieldmapping analysis Christian.
CHAPTER 16 Engineering Drawings and Symbols
Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik
Photogrammetry at WENDELSTEIN 7-X Unternehmung WENDELSTEIN 7-X Max-Planck- Institut für Plasmaphysik Torsten Bräuer1Meeting with NCSX, Greifswald,
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
General Tolerance and Hole Fit
CD meeting R.Yamada1 Thoughts on 4CD (4 th Concept Detector) Solenoid System based on Alex Mikhailchenko’s Basic Design Ryuji Yamada October 20,
HL-LHC/LARP, QXF Test Facility Workshop– R. Carcagno QXF Test Requirements Ruben Carcagno BNL Workshop December 17, 2013.
1 Dimensional Control for the National Compact Stellarator Experiment R. Ellis, A. Brooks, T. Brown, W. Reiersen, S. Raftopoulos, B. Stratton Presented.
Automated Reconstruction of Industrial Sites Frank van den Heuvel Tahir Rabbani.
The OK Fast & Flexible Solution: SCS Sheet Collating System SCS 3010 – Sheet Collating System 3010 Semi-automatic positioning and fixing system for.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Trip Report from CERN and Wendelstein W7-X October 6 – 13, 2007 Michael Viola; Steve Raftopoulos; Bill Sands October 6-10 CERN Geneva, Switzerland October.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
WENDELSTEIN 7-X Basismaschine Design Review Plasma Vessel Max-Planck- Institut für Plasmaphysik J. Reich, W7-X BasismaschineDesign Review Plasma Vessel.
CLIC Module meeting, 22/08/2011 N. Chritin (EN/MME) Cradles design for CLIC module supporting system (EDMS )  General principle  Main inputs an.
Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly.
Max-Planck- Institut für Plasmaphysik U. Schultz, Assembly- Technology Working package Port assembly 1 Working package Port assembly Uwe Schultz.
Print Reading for Industry BRX 210 – Module 1
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
1 Research on laser tracker measurement accuracy and data processing Liang Jing IHEP,CHINA
HL-LHC Meeting, November 2013D2 Status and Plans – G. Sabbi 1 D2 Conceptual Design Status and Next Steps G. Sabbi, X. Wang High Luminosity LHC Annual Meeting.
TE-MSC. 07/04/2016 Jose Ferradas TE-MSC-MDT Alejandro Carlon TE-MSC-MDT Juan Carlos Perez TE-MSC-MDT On behalf to MSC-MDT section and Coil working group.
1 Perturbation of vacuum magnetic fields in W7X due to construction errors Outline: Introduction concerning the generation of magnetic islands Sensitivity.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
NCSX Vacuum Vessel Fabrication
Fits and Tolerances: Linear and Geometry.
Update on PANDA solenoid design
MQXC Nb-Ti 120mm 120T/m 2m models
Rod adaptors for module tests Module positioning studies
Pierre-Alexandre Thonet
Assess variability from year to year: 2010, 2012, 2013, 2015
Preparation of Components for the Mounting of
Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, D Greifswald, Germany Main-Components of the Wendelstein 7-X.
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Alignment of the first two magnet system modules of Wendelstein 7-X
Torsten Bräuer and the Metrologyteam
Welds in the magnet system
On the accuracy of port assembly at Wendelstein 7-X
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
Comments on Document WT-02-02
Presentation transcript:

Fusion Experiment WENDELSTEIN 7-X High geometric precision in the construction of the WENDELSTEIN 7-X fusion experiment T. Bräuer Max-Planck-Institut für Plasmaphysik Unternehmung WENDELSTEIN 7-X D-17491 Greifswald, Wendelsteinstraße 1 Content: Fusion basics and assembly strategy Second order datum point system on components Survey of first magnet half module Conclusion, outlook

WENDELSTEIN 7-X is a fusion experiment ! WENDELSTEIN 7-X: fusion basics WENDELSTEIN 7-X is a fusion experiment ! p + ® D e n 3 He g 4 2 Physical Aim: Prove of the stellarator principle as a realistic concept for a future power plants but no break even, no Tritium Control of a plasma at very high temperatures of 100 Mio Kelvin Quasi stationary operation Technical aim: Construction of the device under industrial like conditions Very tight collaboration with manufacturers Creation of a very strong, very precise magnet field with a relative accuracy of 1...2·10-4

Fivefold symmetry of torus Flip symmetry of a module WENDELSTEIN 7-X: assembly strategy Design scheme of W7-X Main dimensions of W7-X Main radius: 5.5m High: 5.5m Mass: 725t 50 non planar coils (NPC) (Ø  3.0 m, m = 5 t) 20 planar coils (PLC) (Ø  3.5 m, m = 2 t) Coil support structure (CSS) Plasma vessel (PV) Outer vessel (OV) Fivefold symmetry of torus Flip symmetry of a module

Fivefold and flip symmetry: WENDELSTEIN 7-X: assembly strategy Fivefold and flip symmetry: Fivefold symmetry: 5 identical modules with 10 NPC and 4 PLC, CSS, PV Flip symmetry: 2 flip symmetric half modules per module 5 NPC und 2 PLC per half module Flip symmetric half modules of CSS Flip symmetric half modules of PV

Steps of half module assembly: WENDELSTEIN 7-X: assembly strategy Steps of half module assembly: Adjustment of coils Accuracy requirements: 0.5 … 1.5 mm Adjustment of coil support structure Accuracy requirements: 1.0 … 1.5 mm

Module and torus assembly: WENDELSTEIN 7-X: assembly strategy Module and torus assembly: Two half modules are jointed together Module is lowered in half shell of outer vessel and adjusted to final position

Adjustment of components: mainly done by Laser-Tracker (LTD) WENDELSTEIN 7-X: assembly strategy Adjustment of components: mainly done by Laser-Tracker (LTD) 6 … 12 datum points per component Adjustment residual: 0.5 … 1.5 mm Survey accuracy: 0.2 … 0.3 mm Final surveys and documentation: Mainly done by photogrammetry Short survey time Flexible lines of sight and camera positions possible Survey accuracy: 0.2 … 0.4 mm Access to datum points becomes more and more difficult with progress of assembly due to using fitted holes for assembly purposes and blocking of lines of sight by components and staff folders Creation of a second order datum point system with a high number of points is necessary !

WENDELSTEIN 7-X: second order datum points Creation of a second order datum point system for photogrammetry on the components Usually 12…20 original datum points per component Installation of additional 200 second order points for photogrammetry Half module of support structure: Size [m]: 1,5 x 2,5 x 2,5; weight  5 t Roughly 200…300 pictures necessary Roughly 1day Non planar coil: size [m]: 2,5 x1,5 x 3,5; weight  5.5 t

WENDELSTEIN 7-X: second order datum points Creation of a second order datum point system for photogrammetry on a coil sticky targets on the coil Support P1 Stand foot 2 Stand foot 1 Support M1 a. 2 Aux. point 3 Coil support 1 a. 2 Ref. points  3.5m Usually 12…15 original datum points per coil  200 new points per coil Comparison of photogrammetry and Laser-Tracker at 15 datum points Feature targets for using in fitted holes, i. e. original datum points Coil with original datum points

Accuracy analysis of second order datum points: WENDELSTEIN 7-X: second order datum points Accuracy analysis of second order datum points: Number of points: 15 RMS: 0.17 mm Number of points: 221 Number of surveys: 6 Mean RMS: 42µm 68% 32% Conditions: No air condition Different operators For each survey a new set up of scale bars and coded targets Removing and replacing targets of datum holes LTD repeatability accuracy (σ): 0.0625 mm Result: Under real conditions the second order datum points show additional but acceptable uncertainties and can be used in later surveys

Situation for survey of magnet half module: WENDELSTEIN 7-X: Survey of first magnet half module Situation for survey of magnet half module: Two assembly stands next to each other Workflow in work shop is ongoing (crane, transport, …) No air condition Volume of half module 4 x 5 x 4 m³ Max. high over ground: 6m Lots of fixing structures, platforms …

Situation for survey of magnet half module: WENDELSTEIN 7-X: Survey of first magnet half module Situation for survey of magnet half module: Access to the coils is blocked by: Machine table at bottom Support structure at inner side Fixing structures at back, left and right

Results of photogrammetry survey: accessibility of datum points WENDELSTEIN 7-X: Survey of first magnet half module Results of photogrammetry survey: accessibility of datum points 5 independent surveys Up to 750 pictures per survey First order datum points: Total number at all coils: 152 Accessible by photogrammetry: 53 Accessible by Laser-Tracker: 57 (only by using of T-Probe) Second order points: Total number at all coils: 1544 Accessible 780

Actual coil positions meet the tolerance requirements WENDELSTEIN 7-X: Survey of first magnet half module Results of photogrammetry survey: comparison of actual and nominal coil position AAB13 AAB22 AAB45 AAB51 AAC13 AAC51 AAB17 Required adjustment tolerance: 1.5 mm Maximum deviation: 1.3 mm Est. repeatability accuracy of survey (68%): 0.25 mm Cross check with Laser- Tracker survey shows similar results (see below) Actual coil positions meet the tolerance requirements

Repeatability accuracy analysis: WENDELSTEIN 7-X: Survey of first magnet half module Repeatability accuracy analysis: Number of surveys: 5 Duration of all 5 surveys: 1d 2 operators 1 camera In all surveys the same set up of scale bares and coded targets No air condition Ongoing workflow in workshop Number of points: 1198 Mean RMS: 0.25 mm 68% 32%

Cross check with Laser-Tracker: WENDELSTEIN 7-X: Survey of first magnet half module Cross check with Laser-Tracker: One Laser-Tracker survey (Laser-Tracker used with T-Probe) Duration: 1d Maximum deviation of a coil measured by Laser-Tracker: 1.41 mm Meets the tolerance requirement Average of 5 photogrammetry surveys Transformation of photogrammetry to Laser-Tracker survey number of points: 29 Mean deviation: 0.22 mm RMS: 0.25 mm

The experiment WENDELSTEIN 7-X will go into WENDELSTEIN 7-X: Conclusion, outlook Conclusion, outlook : Coils of fist magnet half module have been assembled inside required tolerance! Assembly methods have been proofed and can be used for future modules Assembly is feasible under industrial like conditions, especially under fast rate of construction Photogrammetry has been proofed as a reliable and fast survey technique for final surveys Accessibility can be improved by a second order datum point system for photogrammetry, especially for the next assembly steps: module assembly assembly of torus Second order datum points show an acceptable increase of uncertainty New generation of cameras will be tested to reduce survey time and improve accuracy The experiment WENDELSTEIN 7-X will go into operation in 2014 !