MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 DAQ and CAM Summary o Organization o Control and Monitoring o Detector DAQ o Online Monitoring o Front-End.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Daresbury Aug 2005Jean-Sébastien Graulich Detector DAQ Overview and Needs Jean-Sebastien Graulich, Univ. Genève o Introduction o Detector Systems Overview.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Wrap Up o Control and Monitoring o DDAQ o Interface between DDAQ and MCM o Infrastructure Jean-Sebastien.
April 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Goal for BTF o Status o First results o To be done.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
Readout of TPC with modified ALICE electronics details of current version and pending items ALICE overview New software based on homemade partly existing.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DDAQ Pending Issues o Detector FEE o Software framework o Trigger o Data Storage Jean-Sebastien Graulich,
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Interface between Control & Monitoring and DDAQ o Introduction o Some background on DATE o Control Interface.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
MICE CM17 Feb 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM16 o Detector DAQ software o Front End Electronics o Schedule Milestones o.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Online Summary o Detector DAQ o Controls And Monitoring o Online Data Base o Bottom Lines Jean-Sebastien.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
MICE VC June 2009Jean-Sébastien GraulichSlide 1 Feed back from the DAQ review o Facts o Detector DAQ o Important Comments o Bottom line Jean-Sebastien.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
MICE CM June 2009Jean-Sebastien GraulichSlide 1 Online Summary o Achievements Since CM23 o Control Room o Controls o Detector DAQ o Open Issues o Summary.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London CALICE a calorimeter.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Jean-Sebastien Graulich, Geneva
Old ROD + new BOC design plans
Hall A Compton Electron detector overview
Presentation transcript:

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End Electronics o CAM-DAQ Interface o Schedule Milestones o Summary Jean-Sebastien Graulich, Geneva

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 2 Achievements since CM24  DAQ and Controls Review  Factor of 5 increase in # of particle triggers per spill  FADC Firmware upgraded Factor of 4 reduction in data size  Trigger Debugged  Problem with Event building under control  Target DAQ des-integrated

DAQ Review  Details presented at VC 121  The DAQ Review is Done !  The DAQ Review is Done !  Very useful comments have been received  Detector DAQ appears to be in shape and should allow data taking for Step III and beyond  Unified Controls, Data Flow and Online Database are more recent projects and the committee has noticed it’s not yet mature Need better integration DAQ/Controls More thinking on Online Data Buffer Disk Access  Serious concern about the man power available for Controls MICE VC June 2009Jean-Sébastien GraulichSlide 3

Reminder  The DAQ Spill Gate has to be checked before data taking Documentation available Adjust Width And log !!! MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 4 TOF1 Accepted Particle Trigger GVA1 = Part. Trg Request Spill Gate

Trigger debugging  Trigger signal generation was in “update” mode Went unnoticed at low rate Introduced variable dead time difficult to control Caused saturation  Solved MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 5 Particle Trigger request Accepted Particle Trigger

Event Building  Synchronization can be lost because of Unstable electronics in DAQ trigger distribution Unstable behavior of the VME/Pci Interface  The DAQ software release the busy and enables the DAQ trigger receiver channel after readout Must go through the VME/Pci Interface It happens that one of the two commands is not executed properly… Unpredictable Cured only by a power cycle  Has to be monitored MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 6

DAQ Trigger Monitor MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 7 Number of LDC receiving a DAQ Trigger per DAQ event LDC Number counts # of DAQ Triggers

Particle Trigger monitor MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 8 Equipment number LDC Number Counts # of Part Triggers V1724 FADCs Scalar ch0 TDCs V1731 FADC

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 9 Front End Electronics  TOF2 1 TDC and 5 FADC to be installed Will require upgrade of the rack layout in Control Room  EMR: Electron Muon Ranger (aka SW) Prototype of Front End Board exists BUT : We consider going for another ASIC (Amplifier-Shaper- Discriminator) Buffer Card will be developed in Geneva More details in Daniela Lietti’s talk

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 10 CAM/DAQ Interface   Double link EPICS should know the DATE status A summary of EPICS data should be inserted in the online data stream   Date Status Monitoring James Leaver has provided EPICS Server EPICS Client Test Software Status Display Next step: A small piece of code reading real status from DATE

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 11 CAM/DAQ Special Case:   Target DAQ   Target data is really both CAM and DAQ Double flow is implemented Based on a single I/O software -> No issue with format change   Waiting for the target to be online for final tests But in the meanwhile the code vanished…   Will require dedicated testing runs

MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 12 Schedule Milestones  From CM23  TOF2 Shaper/Splitter Productionmid March need testing  DAQ review June 09  Upgrade of fADC firmwareJuly 09  CAM data in Online Data StreamJune 09 -> Nov 09  Tracker integrated in DAQ and OLMJuly 09 -> Jan 10  TOF TDC Clock SynchronizationJuly 09 -> March 10 More complicated than first thought. Need a dedicated board  Burst Gate Signal in the Trigger SystemNeed aupport here  Approval of SW/EMR Front End ElectronicsIn Proto phase  Production of SW/EMR Front End ElectronicsSept > Jan  TOF2 DAQ InstallationDec 09

Summary  DAQ review passed  Data rate increased by a factor of Mainly due to FADC upgrade  Trigger system upgraded to handle this rate  Event building problem understood and under monitoring  Next steps Interface with CAM Integration of TOF2 MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 13