Kelowna International Airport 2010 Development Program September 17, 2007.

Slides:



Advertisements
Similar presentations
San Diego International Airport Master Plan
Advertisements

Airside Capacity Enhancement
Airport Planning and Design
Comprehensive Development Plan Sea-Tac International Airport Briefing to: Mediated Role Determination Committee April 20, 2006.
Airport Financial Management
Oakland Airport Connector Automated People Mover for Oakland Coliseum BART to Oakland International Airport Elie Jalkh Marwan Bejjani Steve Raney.
Tampa Bay Regional Transportation Summit October 10, 2013.
Cheyenne Regional Airport New Airport Terminal Project December 1, 2011.
Strategy Day 10 th July Andrew Tinkler Chief Executive Officer Introduction.
DRO AIRPORT TERMINAL EXPANSION Alliance Presentation – April 2013.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
773d Logistics Readiness Squadron Deployment Flight (LGRX) Passenger Processing.
Lecture 4: Landside By: Zuliana Ismail.
Terminal Design. Some thoughts from Mark Day (LEX)… Expansions are greatly limited based on the initial configuration. Similar comments to planning must.
1 1 Capacity Measurements in Airport Sector: Drawbacks of Conventional Methods and Benchmarking Airports Using Declared Capacity Tolga Ülkü Presented in:
SOUTH TERMINAL UPDATE May 20, Date Agenda Introduction (Phillip N. Brown) Recent Passenger Trends (Dr. Sean Snaith) North Terminal Complex Capacity.
BOUNDARY BAY AIRPORT (CZBB) AIRPORT UPDATE 2015 Feb 2015 Vancouver's Business and General Aviation Airport 1.
Denver Airport Baggage Handling System (DABHS)
AIRPORT A complex of runways and buildings for the
SLC Overview SLC Evolution Operations Statistics and Fee’s AVI Park and Wait Lot 2002 Winter Olympics UTA Light Rail Project New Technology & Ideas Landside.
Air traffic controllers (ATC) consideration and ATC solutions Session 5 Presentation 4.
Prepared for Airport Ground Transportation Association Spring 2008 Meeting Atlanta, GA April 8, 2008 PRESENTATION COMMERCIAL VEHICLES: WHO’S CURB IS IT.
THE SUSTAINABILITY OF AIRPORTS
Ballina Byron Gateway Airport Presentation November 2012.
Washington Dulles International Airport
ICRAT 2004 IMPACT OF FUTURE GENERATION AIRCRAFT IN AIRPORT OPERATIVITY
International Airport. LOCATION: On Jamaica Bay in the southeastern section of Queens County, New York City. The airport is located 15 miles by highway.
Chris Jones, Public Affairs & Marketing Manager Clark County Department of Aviation Oct. 8, 2012 McCarran International Airport – Gateway to Las Vegas.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
LA GUARDIA AIRPORT: AN ANALYSIS OF AIRPORT EXPANSION AND ACCESSIBILITY Dennis Levene.
AIRPORT 2009 Airport Forum BUCHAREST, October 28-th, 2009 Development & Modernization / Phase III.
Terminal Design Passenger Processing. errata  Consider TSA impacts.
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
A Study of the Congonhas and Pampulha Airports Airports Located at Urban Areas Fabio Rabbani.
PNCC Presentation Palmerston North Airport Ltd 2012/13 Annual Report Our Vision To grow the shareholder’s regional economic value by operating a safe,
Georgia Air Quality and Climate Summit Thomas Nissalke, Ph.D. Director of Environmental and Technical Services City of Atlanta Department of Aviation May.
Management Short Course January 2012 Future Airport Terminals Trends in Terminal Design.
TRB Session January 23, 2007 Transportation Research Board Session Lessons Learned from Large Airport Development “Orlando Airport Experience”
Scenario on airport works Session 5 Presentation 1.
Airport Overview. History Key Dates 1  on April 1st, 1932, the Civil Airport of Cluj is established  in 1944, the airport is destroyed during the World.
Lecture 6: Airport Financial Management
CVFD Training – Transportation Emergencies SFFMA Training Objectives: –
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
An inside look at Airport Design
COCHIN INTERNATIONAL AIRPORT LIMITED 1. CIAL-A PATHBREAKER Cochin International airport, the country’s first Greenfield airport built under public private.
Airport Groundside Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP Aviation Operational Measures for.
September, 2015 YQ Fulfilment. YQ Preposition a global network of specialist airport meet & assist service partners 1.
AGTA Spring Conference 2011 LOOK INTO THE FUTURE-- PLANNING FOR THE NEXT 5-YEARS AT OAK Joan Zatopek, Senior Aviation Project Manager Aviation Planning.
Magic Valley Regional Airport Terminal Expansion and Remodel Magic Valley Regional Airport Terminal Modification Feasibility Study.
DESIGNING FACILITYLAYOUT OF ISLAMABAD DOMESTIC AIRPORT.
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Airports of Montenegro. General informations  Airports of Montenegro is a public enterprise established by the Government of the Republic of Montenegro.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
Vacation begins when you land! JUNE one of two Orlando Sanford (SFB) is one of two international airport’s in the Greater Orlando area Source:
Airport In come and Expenses Forecast
Airport Rental Car Facility Planning Trends
Aeronautical Facilities
Terminals and Transport Interchanges
UNIT -4 AERODROME DATA.
Airport Ground Transportation Association
Stansted Transformation Programme Overview
Transportation Research Board
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
Airport engineering.
EMMANUEL MENANTEAU CEO of Cambodia Airports. EMMANUEL MENANTEAU CEO of Cambodia Airports.
Pierre Regional Airport Master Plan Update
Presentation transcript:

Kelowna International Airport 2010 Development Program September 17, 2007

2010 DEVELOPMENT PROGRAM

3 Passenger Growth Forecast FORECAST ASSUMPTIONS MEDIUM RANGE FORECAST BASED ON 4.3% ANNUAL PASSENGER GROWTH REFERENCE: 2025 MASTER PLAN

4 Ground Access 1.Twin Airport Way Outbound 1.Install Double Left Turns at Highway 97 South Bound 1.Install Advanced Left Turn Signal On Highway 97 1.Expand Bus Parking To Accommodate 6 Full Size Highway/Municipal Buses Estimated Cost $1,000,000

5 Vehicle Parking 1.Increase Paved Vehicle Parking From 2,200 Stalls to 2,500 Stalls 1.Expand Short Term Parking from 320 to 600 Stalls 1.Increase Employee Parking From 170 Stalls to 250 Stalls 1.Develop Demand Management Strategy for Develop 1,000 stall gravel peak period overflow parking area Estimated Cost $2,000,000

6 Car Rentals 1.Build New Car Rental Terminal North Of Existing Air Terminal 1.Provide Covered Ready Parking For 75 Vehicles Adjacent To New Car Rental Terminal 1.Expand Long Term Car Rental Parking By 80 Stalls Estimated Cost $2,000,000

7 Air Terminal Building 1.Build New 250 Passenger International Arrivals Area 1.Design New International Arrivals So That The Baggage Carousel Can Be Used For Domestic Arrivals 1.Convert Existing International Arrivals Area To Domestic Arrivals 1.Add Loading Bridges To Gate #6 & Gate #8 1.Expand Departure Room To Accommodate 680 Passengers Per Hour 1.Add Concessions To Expanded Departure Room 1.Increase Check-in Capacity To 680 Passengers Per Hour 1.Expand Outbound Baggage System To Handle 1200 Bags Per Hour Estimated Cost $20,000,000* * $300.00/Square Foot

8Airside 1.Extend Runway To 8900 Feet 1.Expand Gate #7 To Accommodate Code E Aircraft 1.Expand Gate #8 To Accommodate Code C Aircraft 1.Add Taxiway Connector To Runway To Accommodate Code E Aircraft 1.Upgrade Type 4 Glycol Facility Estimated Cost $10,370,000

Development Program Runway Extension

Development Program

11 MAGNITUDE OF COST ESTIMATE $36,000,000

12 Budget Summary PROJECTS Total GLYCOL FACILITY 70,000 70,000 EXTEND RUNWAY4,000,0001,300,000 5,300,000 BALANCE OF PROGRAM2,000,00015,000,00013,000,000 30,000,000 4,070,0003,300,00015,000,00013,000,000 35,370,000

13 Financing Summary Financing Summary(million’s)

14 Financing Summary Financing Summary(million’s) OUTSTANDING PAYMENTS