1 Stansted Transformation Programme Overview
Presentation to STACC 26 April 2017 Use Dec Design day assumptions

2 Departure Transformation
Stansted transformation programme Our transformation programme is focussed on 3 key areas that will deliver capacity, future-proof the operation and offer improved levels of service/products Arrivals Building The Arrivals Terminal is positioned between the current main terminal and the Radisson Blu hotel. This dedicated building for all arriving passengers will provide immigration, baggage reclaim, customs and baggage off load. The building is designed over 3 levels with a gross floor area of approximately 35,000 m2. Departure Transformation The existing terminal will be transformed to a dedicated departure only building providing: Shore line check-in with increased number of desks Secondary security screening area Expanded Departure Lounge including additional seating Extended baggage facilities Extended Remote Bussing Gate Facility * Bold – we will shortly be engaging with UEG on this scheme Airside Upgrade to airside infrastructure to support an increase in peak hour movements and to support parking for based aircraft.

3 car parking 4 car parking schemes will create circa 8,000 additional spaces across the site Meet and Greet Staff Short Stay Multi 4 car parking schemes across airport site Includes both customer car parking and additional employee parking Range of products served including Short Stay and Meet and Greet capacity

4 The transformation programme will be split into phases
Programme of works The transformation programme will be split into phases Phase One (2017/18) Additional check-in desks Additional Departure Lounge seating New aircraft stands Additional customer and employee car parking (complete by 2022 subject to necessary approvals) Significant capacity enhancements across airport: Construction of the Arrivals Building Existing terminal building transformed into departures-only facility with: Additional Check-in capacity Second Security Screening Area Reconfigured Departure Lounge Additional airside improvements will support more efficient use of the single runway. This work will commence following the completion of phase one. The Committee will be engaged at the appropriate points during these works

5 Hampton by Hilton due to open Summer 2017
Hotel update Hampton by Hilton due to open Summer 2017 Developed by Urban&Civic Construction partner McAleer & Rushe Hampton by Hilton brand – largest in Europe 357 beds 8 storey hotel Linked to terminal via covered walkway Due to open to public July 2017

6 Questions