Presentation is loading. Please wait.

Presentation is loading. Please wait.

773d Logistics Readiness Squadron Deployment Flight (LGRX) Passenger Processing.

Similar presentations


Presentation on theme: "773d Logistics Readiness Squadron Deployment Flight (LGRX) Passenger Processing."— Presentation transcript:

1 773d Logistics Readiness Squadron Deployment Flight (LGRX) Passenger Processing

2 Joint Mobility Center (JMC) passenger processing Army passengers are brought to the JMC in buses with their carry on baggage. A full weight is annotated then the empty weight of the bus. This process gives an exact weight of flight passengers and carry on baggage. After being weighed the passengers are guided to the manifesting station for final processing. Vehicle Ops bus bring each aircraft chalk To the JMC for accountability and ease of Processing.

3 Joint Mobility Center (JMC) passenger Manifesting Army soldiers swipe their CAC card on the reader located at the passenger processing desk. The program creates a manifest that is placed on a disk that can be loaded into Gates, by the 732d passenger terminal personnel. 208 personnel were weighed and manifested in 15 Minutes on 2 August 2011 at the JMC. Soldiers performing the ID card swipe confirming Their physical presence for the aircraft manifest.

4 Passenger Services at JMC Passengers are provided snacks from the dining facility while waiting for the aircraft to be loaded with the unit baggage at the JMC. Soup sandwiches and snack food provided by JBER Dining facility

5 Cargo Handling Each chalk has their cargo brought to the JMC in two trucks. The trailers are weighed full the Empty weight is written on the trailers. The heavier trailers loads the rear of the commercial aircraft and the lighter trailer loads the front cargo hold. Van stands alone on the scale. After weighing the Tractor backs up and reconnects with the van then Moves to the aircraft.

6 Army and Air Force load teams Military load teams working with the commercial loadmasters load cargo into the hold prior to passenger loading. Load team loading baggage into the foreward hold Of the aircraft.

7 Army/ Air Force Team loading deployment aircraft Load teams moving cargo into the hold working with the commercial loadmasters to expedite the loading process. Loading duffel bags into the forward hold of a United Air Lines aircraft.

8 Soldiers loading on Aircraft Cargo and passengers arrive 3 hours prior to take off all tasks completed cargo and passengers loaded, wheels up. Army passengers loading on to aircraft at JMC, deploying To JRTC.

9 4 th Brigade 25 Infantry Division, deployed from JBER to Fort Polk LA. 19 Commercial Aircraft 2,361 Army Passengers moved 449,260 Lbs cargo Time period 19 July to 3 August JMC Processed Airborne operations and Air Force air Craft during this time period Final boarding of passengers


Download ppt "773d Logistics Readiness Squadron Deployment Flight (LGRX) Passenger Processing."

Similar presentations


Ads by Google