Committee of Visitors Review of the BES Scientific User Facilities Division Update for BESAC March 1, 2013 James B. Murphy Director, Scientific User Facilities.

Slides:



Advertisements
Similar presentations
MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES.
Advertisements

NCAR Scientific and Research Engineering Staff Appointments Process Bill Randel 2014 Appointments Review Group (ARG) Chair November 12, 2013.
Report of the Committee of Visitors Energy Frontier Research Centers and Joint Center for Artificial Photosynthesis Energy Innovation Hub Office of Basic.
Division of Graduate Education Gisele Muller-Parker Richard Boone
Research Experiences for Teachers (RET) in Engineering Program Engineering Education NSF Awardees Conference-Sept , 2007 Mary Poats, Program Manager-RET.
Report of the Committee of Visitors of the Division of Chemical Sciences, Geosciences, and Biosciences (CSGB) to the Basic Energy Sciences Advisory Committee.
Recommendations Ward Plummer BESAC Subpanel Review of IPNS and LANSCE/Lujan Center Recommendations Ward Plummer Washington, D. C. December 11, 2000.
1 Report to Basic Energy Sciences Advisory Committee Committee of Visitors for Basic Energy Sciences Scientific User Facilities Division April 15-17, 2007.
Environmental Remediation Sciences (SC – 23.4) Spring 2005.
BSSD Response to the Committee of Visitors June 2008 review report The COV was charged to assess the processes used to: –solicit, review, and recommend.
Office of Science U.S. Department of Energy U.S. Department of Energy’s Office of Science Dr. Raymond L. Orbach Under Secretary for Science U.S. Department.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
1 BASIC ENERGY SCIENCES -- Serving the Present, Shaping the Future Dr. Harriet Kung Director, Office of Basic Energy Sciences Office of Science U.S. Department.
BESAC 29 July 2014 Patricia M. Dehmer Acting Director, Office of Science U.S. Department of Energy.
Corporate Services Grants Programme 2013 – August 2012.
National Institute of Standards and Technology U.S. Department of Commerce TheTechnology Innovation Program (TIP) Standard Presentation of TIP Marc G.
Basic Energy Sciences Advisory Committee Meeting March 3, 2010 Overview of the DOE Office of Science Graduate Fellowship Program Julie Carruthers, Ph.D.
Report of the Committee of Visitors Division of Materials Sciences and Engineering Office of Basic Energy Sciences U.S. Department of Energy to the Basic.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Moreno Valley Strategic Planning Schedule Voting Protocol Subcommittee Functions MV Planning Process.
Magnet Lab User Portal August 2010.
Update on the Upcoming COV of the BES Division of Materials Sciences and Engineering Simon R. Bare UOP LLC BESAC Member Chair of COV BESAC Meeting November.
Materials Science and Engineering Programs Basic Energy Sciences Advisory Committee Committee of Visitors March 17, 18, 2003.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
BESAC Dec Outline of the Report I. A Confluence of Scientific Opportunities: Why Invest Now in Theory and Computation in the Basic Energy Sciences?
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
NSIDC DAAC OVERVIEW Part II: Management and Organizational Structure Ron Weaver NSIDC Scientific Manager DAAC Manager.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
FY 2015 Report of Committee of Visitors BES Division of Materials Sciences and Engineering FY 2012, 2013, 2014 March 10-12, Germantown Presented to the.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Light Source Reviews The BES Perspective July 23, 2002 Pedro A. Montano Materials Sciences and Engineering Basic Energy Sciences BASIC ENERGY SCIENCES.
Office of Science U.S. Department of Energy Raymond L. Orbach Director Office of Science U.S. Department of Energy Presentation to BESAC December 6, 2004.
Columbia University School of Engineering and Applied Science Review and Planning Process Fall 1998.
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
11 Welcome to All! October 26-28, 2009 Washington, D.C. Welcome to All! Accelerators for America’s Future Symposium and Workshop October 26-28, 2009 Washington,
1 Access to the World and Its Languages LRC Technical Assistance Workshop (Part 1) Access to the World and Its Languages I N T E R.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
BASIC ENERGY SCIENCES -- Serving the Present, Shaping the Future Dr. Patricia M. Dehmer Director, Office of Basic Energy Sciences (BES) Office of Science.
NOAA Cooperative Institutes John Cortinas, Ph.D. OAR Cooperative Institute Program, Program Manager NOAA Cooperative Institute Committee, Chairperson.
Report of COV for BES Scientific User Facilities Division Presented to BESAC Meeting August 5, 2004 J. Michael Rowe.
1 ACHIEVEMENTS from the Executive Meeting IEC CAB – ILAC - IAF By Pierre de Ruvo Head of the CAB Delegation.
US Particle Accelerator School Review of Scientific User Facilities Division Committee of Visitors Presented by W. A. Barletta, Chair.
BESAC Workshop on Opportunities for Catalysis/Nanoscience May 14-16, 2002 William S. Millman Basic Energy Sciences May 14, 2002 Catalysis and Nanoscience.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
BESAC Meeting 7 July 2015 Perspectives from the Office of Science Dr. Patricia M. Dehmer Acting Director, Office of Science.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Federal Geographic Data Committee Update Karen Siderelis, Acting Chair Ivan B. DeLoatch, Executive Director NGAC Meeting March 24, 2010.
NIAMS Training Grant and Career Development Award Program Evaluation Presented by David Wofsy, M.D. Chairman Evaluation Working Group September 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beamline Development John Hill NSLS-II Experimental Facilities Division Director PAC Meeting November 20, 2007.
AGS RSVP Weekly Meeting P. Pile 24 Mar 2005 AGS RSVP Weekly Meeting 24 Mar 2005 Useful Links: RSVP Project : C-AD.
Report of the Committee of Visitors of the Scientific User Facilities Division to the Basic Energy Sciences Advisory Committee Review of FY 2007, 2008,
Committee to Assess the Current Status and Future Direction of High Magnetic Field Science in the United States 18 May 2012 Dr. Patricia M. Dehmer Deputy.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
Report of the Committee of Visitors of the Division of Materials Science and Engineering (DMSE) to the Basic Energy Sciences Advisory Committee Review.
Page  ASME 2013 Standards and Certification Training Module B – Process B7. The Appeals Process.
Argonne Accelerator Institute Activites Rod Gerig Argonne May 18, 2007 Presentation to the Fermilab-Argonne Directors’ Collaboration Meeting.
Center for Biologics Evaluation and Research, FDA Site Visit Introduction Kathryn M. Carbone, M.D. Associate Director for Research.
Committee of Visitors (COV) Review of the BES Scientific User Facilities Division April 12-14, 2016 Update for BESAC February 12, 2016 James B. Murphy.
Welcome Introducing ABA’s Newest Council!. The Bus Maintenance and Repair Council (BusMARC) was created in 2015 and is a new program of the American Bus.
CIFAR Review Report John Weatherly, CRREL Review Panel Chair NOAA SAB Meeting Nov 2-4.
Image courtesy of Oak Ridge National Laboratory Eric R. Colby † Office of High Energy Physics Office of Science U. S. Department of Energy Office of Science-Led.
Executive Session Director’s Conceptual Design Review of Mu2e Project May 3-5, 2011 Jim Yeck.
OFFICE OF SCIENCE DOE/SC CD-3c Review of the Muon to Electron Conversion Experiment (Mu2e) Project Fermi National Accelerator Laboratory June 14-16, 2016.
Updating the Regulation for the JINR Programme Advisory Committees
Strategic Planning Council (SPC)Update
Template Guidelines Please use this template to create your LDRD presentation- we highly recommend that you address all aspects of the proposal as outlined.
National Quantum Initiative
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

Committee of Visitors Review of the BES Scientific User Facilities Division Update for BESAC March 1, 2013 James B. Murphy Director, Scientific User Facilities Division

The first SC-BES COV was in This will be the fourth review for SUFD and the twelfth COV review in BES. All previous COV reports and BES responses can be found at: COVs are now a standard part of BES practice. COV recommendations are taken very seriously by BES and have resulted in substantive changes. History of COVs in SC/BES

Committee of Visitor Charge 1. For the scientific user facilities including the accelerator and detector program, assess the efficacy and quality of the processes used to: (a) solicit, review, recommend, and document proposal actions and (b) monitor active projects, programs and facilities. 2. Within the boundaries defined by DOE missions and available funding, comment on how the award process has affected: (a) the breadth and depth of portfolio elements, and (b) the national and international standing of the portfolio elements.

Committee of Visitor Coverage: FY Facility Operations - Five X-ray Light Sources -Three Neutron Scattering Facilities -Five Nanoscale Science Research Centers -Three Electron-beam Microcharacterization Centers 14 Construction Projects and Major Items of Equipment -NSLS II- LCLS- USB-STS - LCLS II- PULSE-LUSI-NGLS - APS-U- SING-SING II-TEAM II -NEXT- PUP -Accelerator and Detector Research

FY 2013 Committee of Visitors William Barletta, MIT/USPAS, Chair April 24-26, 2013 at DOE Germantown 17 COV panelists organized into 4 panels Panelist statistics: Academia: 5Funded by BES: 7 DOE Lab: 5Not funded: 10 Non-DOE Federal Lab: 3 Industry: 2 Other: 2 Male: 13 Female: 4 4 (and Chair) are on BESAC 4 (and Chair) served on 2010 SUFD COV

BES SUFD Committee of Visitors Dr. William Barletta (MIT/USPAS), Chair Construction Projects – James Krupnick (LBNL, Ret.) – Angus Bampton (PNNL) – Jeff Hoy (Trident Service LLC) – Maria Dikeakos (DOE PPPL) Nano-Science & E-Beams – Prof. Donald Tennant (Cornell) – Prof. Beatriz Roldan Cuenya (UCF) – Dr. Ernie Hall (GE) – Dr. James Liddle (NIST) Light Sources, Accelerator & Detector R&D – Dr. Simon Bare (UOP) – Prof. Nora Berrah (WMU) – Dr. Gene Ice (ORNL) – Dr. Joel Ullom (NIST) – Dr. David Robin (LBNL) Neutron Facilities – Prof. Sunil Sinha (UCSD) – Dr. Robert Dimeo (NIST) – Prof. Thomas Russell (UMass) – Dr. John Tranquada (BNL) Chairman in Red BESAC Member in Italics Chairman in Red BESAC Member in Italics

COV Agenda 7:30 am – 8:00 amTransportation to Complex (Bus will be provided) 8:00 am – 8:30 amSecurity Entrance - Committee to Assemble in North Lobby to check in 8:30 am – 8:45 am Executive Session, Committee Assignments ( William Barletta ) 8:45 am – 9:00 am BESAC and COV Process ( John C. Hemminger ) 9:00 am – 9:30 am Welcome & Introduction to BES & the COV process ( Harriet Kung ) 9:30 am – 10:15 amOverview of the Scientific User Facilities Division and the peer review process ( James Murphy ) 10:15 am – 10:30 amExecutive Session 10:30 am – 10:45 am Break 10:45 am – 11:15 amQ&A with Scientific User Facilities Division staff 11:15 am – 12:30 pmExecutive Session – Review files 12:30 pm – 1:30 pm Lunch 1:30 pm – 4:30 pmExecutive Session – Review files 4:30 pm – 5:30 pmQuestions and Answers with BES staff 5:30 pmAdjourn for the day Dinner (on your own) Wednesday, April 24 th, 2013

COV Agenda, cont’d 7:30 am – 8:00 amTransportation to Complex (Bus will be provided) 8:00 am – 8:30 amSecurity Entrance - Committee to Assemble in North Lobby to check in. 8:30 am – 9:30 am Full Committee Executive Session ( William Barletta) 9:30 am – 10:30 pmExecutive Session – Review files 10:30 am – 10:45 am Break 10:45 am – 12:30 pmExecutive Session – Review files 12:30 pm – 1:30 pm Lunch 1:30 pm – 4:30 pmBegin Draft report and recommendations 4:30 pm – 5:30 pmExecutive Session 5:30 pmAdjourn for the Day Dinner (on your own) Thursday, April 25 th, 2013

COV Agenda, cont’d 7:30 am – 8:00 amTransportation to Complex (Bus will be provided) 8:00 am – 8:30 amSecurity Entrance - Committee to Assemble in North Lobby to check in 8:30 am – 9:00 amQuestions & Answers for COV Members & BES Staff 9:00 am – 10:30 amComplete Draft report and recommendations 10:30 am – 10:45 am Break 10:45 am – 11:45 amFull Committee Executive Session: Review & revise report 11:45 am – 12:45 pmCloseout 12:45 pm – 1:30 pm Lunch ADJOURN (Except Team Leads) 1:30 pm – 3:30 pmTeam Leads complete written draft report 3:30 pmTeam Leads ADJOURN Friday, April 26 th, 2013

Back-Up Slides

2010 COV Recommendations / SUF Response Recommendation: Implementation of Previous COV Recommendations As the budget allows, continue to explore ways to establish theory programs at existing facilities where they do not exist. In the view of the COV, this is a highly cost-effective way to make the facilities even more productive. SUF Response: BES concurs with the COV recommendation and will continue to explore ways to expand theory activities at BES facilities pending funding availability. Update: The light sources and neutron sources have included theory activities in a variety of ways, ranging from embedded theory groups including joint appointments, to theory collaborations, to visiting scientists. The nanocenters have had theory groups embedded since they were formed.

2010 COV Recommendations / SUF Response, cont Recommendation: COV Process Effectiveness 1.COV timing: Avoid repeated coincidence with the cycle of nanocenter reviews. 2.At the first breakout session of the COV subpanels, schedule a brief update by the cognizant SUFD program manager for the facility type being assessed. 3.Consider making the documentation available in the future in electronic form. SUF Response: 1.BES concurs with the COV recommendation and will consider altering the SUFD facility review cycle schedules prior to the 2013 COV. 2.BES concurs and will implement this recommendation at the next COV. 3.All SUFD documentation is already in electronic form. We will consider supplying COV documentation in an electronic format provided that all DOE information management requirements can be satisfied. Update: 1.The nanocenter reviews will be held after the 2013 COV. 2.Program manager updates are planned for the 2013 COV breakout sessions. 3.Electronic files are planned for the 2013 COV.

2010 COV Recommendations / SUF Response, cont Recommendation: Facility Review Process Description and Effectiveness 1.As part of future 3 year reviews, ask the facilities how previous recommendations have been implemented. 2.Provide the facilities with the questions directed to reviewers. 3.Further diversify the types of organizations the reviewers are drawn from, including industry representatives. 4.Establish a uniform definition of publications and high impact publications. 5.Establish a uniform definition of off-site users. 6.Ask reviewers to summarize major findings and recommendations at the beginning of their report.

SUF Response : 1.BES concurs with the COV recommendation. The previous reports will be included in future COV documentation to be provided to the members prior to the review. 2.BES concurs & will implement the recommendation in future reviews. 3.BES concurs with the recommendation and has already started to draw reviewers from diverse organizations, including industry. 4.BES concurs with the recommendation and has already started to interact with the facilities to establish a clear definition of high impact publications. 5.BES has established a clear definition of off-site users. 6.BES concurs and is implementing this recommendation. Update : Items 1-3, 5-6 have been implemented and relevant documentation will be included in the 2013 COV materials. Item 4 has been implemented for synchrotron and neutrons and is planned for nanocenters COV Recommendations / SUF Response, cont

Recommendation: General Issues 1.Request an annual listing of publications and currently available equipment from all facilities. 2.Place added emphasis on maintaining state-of-the-art experimental apparatus, sample environment and software at all facilities to maximize scientific productivity. 3.Foster a pipeline of instrumentation, accelerator, detector experts. 4.Encourage more outreach to train present and future users in the use of the facilities 5.Increase the SUFD Program Managers’ travel- budget so as to be commensurate with the mission of the BES SUFD. 6.Provide additional office space for the SUFD.

SUF Response : 1.SUFD already requests such information annually. 2.BES concurs with the recommendation. 3.BES agrees and has started to address this issue through its research support at universities and laboratories. 4.BES concurs with the COV recommendation and will continue to engage the facilities in outreach and training efforts. 5.BES concurs with the recommendation and will continue to work with SC management to seek increases in travel funding for program managers. 6.BES concurs with the COV recommendation and is in the process of requesting more space to accommodate the space needs of the staff. Update : All items have been implemented and relevant documentation will be included in the 2013 COV materials. For item 3, SUFD is providing opportunities for junior scientists in instrumentation, accelerator and detector areas through the early career program COV Recommendations / SUF Response, cont