Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

Facilities Modernization Program Funded by Measure B Project Report December 17, 2012.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 21, 2008 BUILDING TOMORROW TODAY Cordoba Corporation.
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
INTRODUCTION. ARCHITECTURAL TECHNOLOGY COURSES INVOLVED ACH 150 Construction Documents II 2 nd Semester Drafting/Design Studio Normal project – advanced.
Draft FMP Priorities For Discussion Facilities Committee 3/5/13.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District January 31, 2011 EDUCATE  ENGAGE  EMPOWER 1.
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
May 6, 2010 Irvine Unified School District HMC Architects.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District August 8, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District April 25, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
Louisiana Community & Technical College System April 2013 Jan Jackson, Sr. Vice President for Finance & Administration PROGRESS of ACT 391 Construction.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 14, 2010 EDUCATE  ENGAGE  EMPOWER 1.
BOND PROGRAM UPDATE Building Tomorrow Today Long Beach Community College District The Long Beach Rotary Flex Day,March 28, 2007 Flex Day, March 28, 2007.
SCIENCE COMPLEX Infrastructure Committee Presentation November 4, 2009.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
UWF BOARDS STRATEGIC PLANNING JUNE 3, 2009 UWF-Facilities Development & Operations-May 2009.
Facilities Modernization Program Funded by Measure B Project Report October 20, 2014.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
Facilities Modernization Program Funded by Measure B Project Report September 16, 2013.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2010 Exhibition of School Planning and Architecture.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Facilities Modernization Program Funded by Measure B Project Report September 16, 2014.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Facilities Modernization Program Funded by Measure B Project Report March 19, 2012.
Facilities Modernization Program Funded by Measure B Project Report November 21, 2011.
E NGINEERING D IVISION 13 th Street Storm Drain Replacement Project Prebid Meeting for Phases 2 & 3.
Paradise Valley Community College CLC Update Jacalyn A Askin, Vice President of Administrative Services May 8, 2009.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 1,
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Facilities Modernization Program Funded by Measure B Project Report September 21, 2015.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Judson Early College Academy Judson ISD - San Antonio, Texas High School New Construction PBK 2011 Exhibition of School Planning and Architecture.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District April 6, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District July 26, 2010 EDUCATE  ENGAGE  EMPOWER 1.
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 14, 2011 EDUCATE  ENGAGE  EMPOWER 1.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Miller Driscoll Building Committee Construction Update Thursday April 7, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions & Alterations.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
1 Update on Off-Campus Development in South County: Update to FPP CAC – August 25, 2015 Siteman Cancer Center Expansion Phase II Development.
LIFE CYCLES OF AIKEN COUNTY PUBLIC SCHOOLS CONSTRUCTION PROJECT October 8, 2013.
Career and Technical Education Center at Heintz CTECH
Cambrian School District March 19, 2015
Aerial of the full site facing northeast taken on March 1, 2016.
Foundations of Technology Construction
Bond Oversight Committee
2006 Facilities Master Plan Update Cañada College
Bond Oversight Committee
How Completed Interiors Are Achieved: Designing & Building
Construction Report March 25, 2010.
ADDITION AND MODERNIZATION
Facilities Update November 17, 2017
Facilities Modernization Program
Minuteman Vocational Technical Regional High School Progress
Facilities Modernization Program
Administrative Council Meeting October 8, 2018
Mount Vernon Community School
Foundations of Technology Construction
Minuteman Vocational Technical Regional High School Progress
EAST PENNSBORO AREA SCHOOL DISTRICT
Facilities Update Garden Grove Unified School District
Presentation transcript:

Facilities Modernization Program Funded by Measure B Project Report April 19, 2010

PROJECT PROGRESS REPORT College Center for the Arts Project Team: Architect: John Sergio Fisher & Associates Construction Manager: Parsons Brinckerhoff Contractor: C. Overaa & Co Project Update: The exterior siding, stucco and windows are 99% complete. The interior of the building is 97% complete in segment "B" which is the facility offices and the rehearsal rooms. The Black Box Theater and the Main Auditorium infrastructure elements are continuing and will be completed this month. The final concrete walk ways and ramp around the building and the Amphitheater are 98% complete. The total project is 95% complete. Occupancy Fall Semester 2010 LAS POSITAS COLLEGE April 19, 2010

PROJECT PROGRESS REPORT Child Development Center Project Team: Architect: Beverly Prior Architects Construction Manager: Parsons Brinckerhoff Contractor: Lathrop Construction Associates Project Update: Exterior plaster complete on all buildings. Installation of sheetrock continues in building B and has started in building C. Rough grading for the OLEs has begun. OccupancySpring 2011 LAS POSITAS COLLEGE April 19, 2010

PROJECT PROGRESS REPORT PE Phase III (Outside Loop Road) Project Team: Architect: WLC Architects / Carducci Landscape Architects Construction Manager: Parsons Brinckerhoff Contractor: Lathrop Construction Project Update: Underground & electrical utilities are continuing. Occupancy: 10/2010 LAS POSITAS COLLEGE April 19, 2010

PROJECT PROGRESS REPORT Collier Creek Storm Water Outfall Project Team: Engineer of Record: Sandis Construction Manager: Parsons Brinckerhoff Contractor: Lathrop Construction Project Update: Storm Drain and Retaining wall installation is complete. Backfill at retaining wall is on going. Occupancy: 04/2010 LAS POSITAS COLLEGE April 19, 2010

PROJECT PROGRESS REPORT Science Building, Phase II Project Team: Architect: Kwan Hemni Construction Manager: Parsons Brinckerhoff Contractor: TBD Project Update: Added space for 4 classrooms on second floor. Site layout and floor plan finalized. Projected submittal to DSA in March Occupancy: Fall 2012 LAS POSITAS COLLEGE April 19, 2010

PROJECT PROGRESS REPORT Student Services & Central Administration Project Team: Architect: Steinberg Architects Construction Manager: Parsons Brinckerhoff Contractor: TBD Project Update: 60% design documents were submitted in April DSA submittal planned for August 2010, This project will participate in the new DSA Collaborative Process. Occupancy: Fall 2012 LAS POSITAS COLLEGE April 19, 2010

PROJECT PROGRESS REPORT Campus Boulevard Phase I-III Project Team: Architect: RHAA Construction Manager: Parsons Brinckerhoff Contractor: TBD Project Update: Design stopped to coordinate with SSA design concepts. Occupancy: Fall 2011 LAS POSITAS COLLEGE April 19, 2010