INITIAL CONSULTATION 07 May 14 May 21 May 04 June Identifying Needs

Slides:



Advertisements
Similar presentations
ELEMENTARY SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships.
Advertisements

Capital developments at SFX
Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
St Andrews School A Tour Of The School By Daniella.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
By Annelies Kuypers. For this competition I had to do the following things- Design a performing arts centre for Dio and make at least 2, no more than.
Background PFI (Private Finance Initiative) School to be built by Miller Construction Government Funded Supported by the Local Authority School is designed.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
Support Staff Structure September PA Curriculum Band 3 mid 39 weeks, 37 hrs 3 x Admin Assistants Band 2 mid 38 weeks, 25 hrs Exams Officer Band.
Congregation Survey Summary & Program Statement KATY first united methodist church August 30, 2009.
RENOVATION & ADDITION OPTIONS TORONTO DISTRICT SCHOOL BOARD NORTH TORONTO COLLEGIATE INSTITUTE REDEVELOPMENT STUDY.
Virtual Tour of Sandhurst School by Kiera Cherrington Press F5 on your keyboard and then click on the arrow to begin the school tour Virtual Tour of Sandhurst.
MAC MARITIME TRAINING AND RESEARCH INSTITUTE PROJECT PLANNING
Sixth form Judged ‘Outstanding’ – Ofsted, November 2011.
Housing and Equipment At some time in their teaching careers, most music educators will be called upon to offer suggestions and comments on a construction.
Joint Service Centre and the Extended School CASTLE GREEN London Borough of Barking & Dagenham.
Year 8 Course Selection Information 2015 The Detail.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
1 Hounslow Community Resource Centre Project HCN General Meeting, 12 th June 2013.
Guiding Principles: –Neo Georgian Aesthetic – Civic proportions –Beautiful – “Wow factor” – distinguished –Campus Great Lawn with outdoor teaching opportunity.
Chafford Hundred Campus Business and Enterprise College “A School for the Future”
ADDITION & REMODEL Eugene Field Elementary School.
Prepared by Dr. Hazem Abu-Orf, University of Palestine International Design Studio III Lecturer 5 Project II Elements of the Art Faculty University of.
“What is happening to my College?” Questions, thoughts and reflections on the developments of Queen’s College ~ Answers by Boydy, Heardy and Jesse.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
All Saints’ RC School Mansfield PE Changing Room Refurbishment 2007 Consultant : CP Associates Contractor : Tanbry Construction, Mansfield Cost :£372,
Swiftwater Elementary Center Swiftwater, Pennsylvania Project of Distinction Elementary School Gilbert Architects Inc Exhibition of School Planning.
Virtual Tour of a Junior School of a Junior School in England in England.
HIGH SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
St. Cloud High School Phased Comprehensive Construction Project April 28,
A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College.
MIDDLE SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
Facilities for a Quality Child Development Program Child Services II.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Bedlingtonshire Community High School New Build
Sixth form Judged ‘Outstanding’ – Ofsted, November 2011.
Project Overview BCTC, Newtown Pike Campus Classroom Building May 13, 2010.
MASTERPLAN Drivers for Masterplan: There are a number of drivers determining the need for – and direction of a Masterplan covering the entire St.
Helena Romanes School and Sixth Form College Key Stage 4 Courses Ms Witty – Assistant Headteacher Mr James – Director of Learning Year 8 12 June.
The Aston Campus 2010 – Topics highlighted in strategy discussions Student Experience What makes Aston special? Connections to the City.
Doing it Differently Ideas for D&T accommodation Doing it Differently Ideas for D&T accommodation The following file is a case study to show aspects of.
Adcote School Senior School Information Evening for Year 6 Parents.
School Design Education Burnley – The Way Forward.
Virtual Tour of a School in England Welcome to the virtual tour of Woodlands Junior School in the south-east corner of the United Kingdom. by Usanova L.O.
SMITH SCOTT MULLAN ASSOCIATES 1 KING’S PARK PRIMARY SCHOOL FEASIBILITY STUDY STAKEHOLDER ENGAGEMENT 03 February 2016.
OVER VIEW. FACILITIES Block 1 : Academic and Admin Block 2 : Academic Masjid Digitalized Multi lingual library Research Centre Audio Visual theatre Live.
Woodbrook Vale School.
Route 1 Route 2 Route 3 Open Day 2016 Tours Route 4.
Shore Green Supported Housing Manchester
Our School Presentation
St Michael’s C of E Primary School Front of School Enhancements
Diocese of Northampton Scott Tallon Walker Architects
Year 11 PPEs Monday 14th – Friday 18th November 2016
St Benedict’s Catholic High School
Fire & Evacuation Muster Point
KS5 Options Decisions for Success.
East Doncaster Secondary College
Woodbridge Middle School Renovation Referendum
Shore Green Supported Housing Manchester
BY HERBER.
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
PE/MULTI-PURPOSE ROOM COVERED OUTDOOR LEARNING CENTER
Woodbridge Middle School Renovation Referendum
Year 9 Options Fulston Manor School
Curriculum Information Evening
Front of building. Mrs Neil (our School Business Manager) visits York to see our new school building.
Dixon Middle School Project Update
Presentation transcript:

INITIAL CONSULTATION 07 May 14 May 21 May 04 June Identifying Needs PE, Drama, ICT, Dining, Hall Site Opportunities/Risks Physical connectivity with Our Lady & St George Option development 14 May Curriculum Analysis: General spaces, Science, ICT, Art, Assembly space, Expanded/improved dining facilities 21 May Planning Risk 04 June Preferred Option (plus reserve) Holy Family

IDENTIFYING NEEDS: School Perspective Holy Family

IDENTIFYING NEEDS: Curriculum Analysis SCHEDULE OF ACCOMMODATION FOR ANY MAINSTREAM SECONDARY SCHOOL Version 6.2 Feb 2015 BW INTERACTIVE SoA FOR SECONDARY (CONT.) average recommended date 18/5/15 age range 11-18 school name Holy Family Catholic School as a check: Holy Family Catholic School max. group size area of space (m2) TOTAL TOTAL SUPP AREA (m2) EXIST- ING SPACES no. of spaces AREA (m2) area of space (m ) no. of spaces years net capacity type of school voluntary aided site: area (m2) type split site (6) net capacity 2 11 to 16 places 1200 16 to 19 places 270 5 for SoA below = 1470 for recommended Staff and Administration Areas 2 within a potential range of: SoA below: 1470 existing buildings: type remodelled 29 m2 float not over gross curriculum C: typical OFF35 OFF33 OFF32 OFF41 ADM21 - staff work room (with sink) staff work room staff room (social) conference/ meeting room community entrance/ reception 12 7 33 - 28 19 55 25 4 5 2 1 140 38 55 25 4 28 19 55 25 4 5 2 1 Total Mainstream Places 1470 existing or new (new if blank) 1341 to 1491 1341 to 1491 Additionally resourced places for: 195 including kitchenette and pigeon holes ADS code max. recommended group size (for size of space) average TOTAL TOTAL SUPP EXIST- area of for community use outside core hours - SEN area of space (m2) no. of AREA AREA ING space no. of - curriculum analysis data linked spaces (m ) 2 (m ) 2 SPACES (m ) spaces 2 admin suite reception desk options office with 2 recep desks Basic Teaching Area ADM11 ADM13 ADM08 ADM05 - ADM01 ADM02 ADM04 head’s office (meeting room) 1 6 4 12 - - 4 16 7 27 48 1 16 7 27 48 36 35 30 31 16 7 27 48 11 6 9 1 general teaching spaces admin office (PA to head) reprographics room general office (2 recep desks) - classrooms 41 (37) classroom options all standard except post-16 (37) CLA02 seminar room 22 30 41 55 62 4 33 164 1815 751 608 334 41 55 4 33 CLA12 general classroom 55 m2 standard size for 30 pupils 62 m2 standard size for 30 pupils CLA13 extensive classroom entrance/ reception interview room sick room 11 6 9 1 11 6 9 78 7 net area of this space only adjacent to entrance/reception adjacent to entrance/reception - - ICT/ business studies 2 (8) (8) offices (no. of offices 19 ) CLA32 ICT-rich classroom 30 62 3 5 186 310 332 106 62 m2 standard size for 30 pupils standard size 62 3 5 OFF00 OFF10 OFF00 OFF10 OFF20 OFF15 OFF15 office (1-person) office/ meeting (1-person) 1 3 2 4 5 7 9 11 12 6 8 42 72 194 e.g. assistant head or pastoral head 7 9 11 12 6 8 CLA41 ICT/ business studies room - - office (2-person) office/ meeting (2-person) office (SENco, learning support) office/ workroom (ICT tech) office/ workroom (premises) 109 practical learning spaces science 11 (11) science options all standard labs + post-16 (11) 1 12 11 17 7 e.g. SENco and learning support 1 SCI02 science studio 30 69 83 90 113 493 185 SCI05 general science laboratory 9 2 747 180 83 m2 standard size for 30 KS 3-4 pupils for post-16 chemistry, biology and physics 83 90 9 2 TOTAL AREA min 394 max 701 534 739 OK: area within recommended range SCI11 specialist science laboratory 534 - Storage: teaching storage - STT10 STT21 STT23 STT21 STT05 STT32 STT34 STT05 general teaching/ IT store (off corridor) science prep room chemical store (off prep room) 5 118 10 8 1 40 118 10 21 93 3 41 m2 total recom'd 118 m2 minimum recom'd 10 m2 minimum recom'd 5 118 10 8 1 ) art 5 (4) (4) DAT02 general art room 30 83 97 104 2 166 194 269 97 65 83 m2 standard size for 30 pupils 97 m2 standard size for 30 pupils 104 m2 standard size for 30 pupils 83 97 2 science prep room DAT03 3D art room specialist store (off art room) multi-materials store/ prep room food store/ prep room specialist store (off DT light prac room) 5 41 10 8 1 6 40 41 10 30 35 minimum 2 stores off each art space 41 m2 min recom'd for 2+ workshops 10 m2 minimum recom'd 2 stores off each light practical space 5 41 10 8 1 6 DAT04 3D art room (ceramics) music and drama 5 (4) (4) 33 113 PER01 music classroom 30 32 62 69 90 83 3 186 77 78 93 62 m2 standard size for 30 pupils 69 m2 standard size for 30 pupils 90 m2 standard size for 30 pupils 83 m2 standard size for 30 pupils 62 3 PER02 extensive music classroom STT05 STT08 STT35 STT10 STT10 - specialist store (music) drama store (off room) 5 10 3 2 1 10 5 3 28 70 shared stores for music suite 1 store off any drama space music instrument store recommended 5 10 3 2 1 PER05 drama studio 1 90 90 1 PER04 music recital/ drama studio food store (off food room) general store (off library) general store (off SEN room) - design and technology 4 (7) (7) DAT43 RM workshop (1 or 2 of 2) 24 25 97 83 2 1 194 166 83 381 157 58 132 128 97 m2 standard for 24 if 2 spaces 97 m2 standard for 24 if 2 spaces 83 m2 standard size for 25 pupils 83 m2 standard size 97 83 2 1 29 147 DAT35 food room (1 or 2 of 2) DAT22 graphic products STH00 STH00 STH00 STH05 PE store(s) (sports hall) 60 4 15 8 1 60 4 15 8 38 23 60 m2 minimum recom'd may be locked cage in main PE store 15 m2 minimum recom'd 60 4 15 8 1 DAT25 constructional textiles PE store(s) (community) - - PE store(s) (activity studio) external PE store 26 non-teaching storage PE basic teaching spaces 6 (3) (3) STH10 STT10 STN21 (CIR01) STH20 - chair and dining table store(s) (off hall) general store (central stock) secure/ exam/ archive store wheelchair/ appliances bay(s) retractable bleacher seating (hall) 23 7 8 1.5 16 1 2 6 23 14 16 9.0 18 36 23 m2 recom'd for chairs and tables 23 7 8 1.5 16 1 2 6 - - TOTAL AREA min 4344 max 5035 4675 4457 OK: area within recommended range 4675 as 'bays' off circulation areas Large spaces: halls and indoor PE 383 m2 min. recom'd for all pupils dining HAL01 main hall (secondary) assembly - 422 248 30 226 594 150 1 226 594 150 166 234 111 255 0% of pupils eating cold food at lunch recommended: school sports hall (4-court) recommended: activity studio (10 x 15) 226 594 150 1 SPH00 school sports hall (4-court) STN02 STN02 STN31 STT10 personal storage (lockers) personal storage (community lockers) cleaners' store(s) general store (maintenance) 13 3 1.5 8 6 1 10 78 3 15.0 8 93% of pupils can have locker if 4 tiers for community use outside core hours 13 3 1.5 8 6 1 10 ACT05 activity studio (10 x 15) - - Dining and Social Areas dining options 60 mins in dining area and hall 1 of 8m2 minimum recommended DIN01 dining area(s) 401 112 - 383 125 1 383 125 234 120 125 100% of pupils incl 33% eating hot food recommended: social space (sixth form) 383 125 1 TOTAL AREA min 531 max 838 591.0 713.0 OK: area within recommended range 591 DIN04 social space (sixth form) Float min 0 max 811 29 NOTE: float available 29 29 - - Total Net Area min 7750 max 8273 7750 7680 OK 7750 TOTAL AREA min 1257 max 1706 1478 1245 OK: area within recommended range 1478 Non-net Area Total timetabled spaces 74 (74) 74 KIT00-09 school kitchen prep & servery 148 1 148 203 148 m2 min recom'd for full service (pupil toilets: 74 recom'd 77 provided) 148 1 Learning Resource Areas toilets (and personal care) LIB05 library resource centre LIB06 - 72 46 - 188 76 1 188 76 171 147 185 m2 minimum recommended 74 m2 minimum recommended 188 76 1 TOC01 TOC02 - TOC04 TOC13 TOC21 TOC13 TOC15 TOC22 pupil changing and showers accessible/ staff changing 74 1 83 6 2 166 12 146 16 4 37 115 27 166 m for 147 incl shower cubicles 6 m2 minimum including shower 2 83 6 2 sixth form study area(s) - - hygiene room (shower & wc) creative art 1 12 12 39 3.5 6.5 3 1 6 7 2 14 12 234 24.5 13 3 91 12 m2 minimum including hoist 12 39 3.5 6.5 3 1 6 7 2 pupil toilet suite(s) accessible/ staff toilet RES21 kiln room - 3 7 3 2 - 4 8 16 6 1 8 4 64 16 8 24 18 4 m2 minimum in new build 8 m2 standard size 16 m2 minimum in new build 8 m2 minimum in new build 6 m2 minimum in new build 4 8 16 1 8 also for visitors and staff 2 in PE changing area in admin suite for sick room near staff room RES12 music practice/ group rooms other pupil toilet suite(s) individual toilet (pupil) staff toilet suite(s) RES13 extensive music practice room 2 1 RES14 control room for recording 2 62 RES16 lighting/ audio control room 1 6 6 1 - - PLA01 PLA02 plant indicative area, incl ICT hubs and risers 1.6% 174 173 21 1555 560 2.3% for existing 25.0% of net minimum circulation recom'd 20% for existing 7.3% for existing 126 7 2017 318 1.6% 2 26.0% 4.1% SEN and support spaces server room 7 2 14 SEN01 SEN resource base 4 7 6 8 - 16 12 9 1 5 16 12 45 25 29 7 14 20 63 16 12 9 1 5 CIR01-02 circulation partitions %age of net area for new build %age of net area for new build min 3100 max 3488 min 10850 max 12380 26.0% 4.1% 1573 563 SEN11 SEN therapy/ MI room (in staff & admin in version 5.2) FLA etc. RES00 small group room TOTAL AREA 3027.5 2921.0 ERROR: total area for category is too low 3100 RES00 medium group room Total Gross Area 10777.5 10601 OK 10850 10778 of which 10601 existing, so: gross area to be built 177 m2 139% 138% RES00 large group room (SEN etc) 1 16 also usable as multi-agency facility 16 1 - - Total Gross Area (including supplementary area) Gross area as proportion of net TOTAL AREA min 413 max 635 443 526 OK: area within recommended range 443 HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 3A: WISEMAN (Massing) A3.2 Option 3a new sports hall at Wiseman Wiseman existing sports hall remodelled and expanded as a new main hall New Kitchen Wiseman hall demolished and replaced with new 6th form centre gaining 9 classrooms and a 6th form study area Wiseman dining hall and courtyard rebuilt as new hub and dining hall New main entrance and circulation 7 Girls changing rooms remodelled as WCs 7 8 Walthamstow House remains largely unchanged for years 7 and 8 only except for upgraded kitchen and Hall 4 2 5 3 1 6 Wiseman HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 3A: WISEMAN (Aerial) A3.2 Option 3a new sports hall at Wiseman Wiseman existing sports hall remodelled and expanded as a new main hall New Kitchen Wiseman hall demolished and replaced with new 6th form centre gaining 9 classrooms and a 6th form study area Wiseman dining hall and courtyard rebuilt as new hub and dining hall 6 New main entrance and circulation 7 7 Girls changing rooms remodelled as WCs 8 Walthamstow House remains largely unchanged for years 7 and 8 only except for upgraded kitchen and Hall 2 4 5 3 1 6 8 Walthamstow House Wiseman HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 3A: WISEMAN (Ground Floor) HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 3A: WISEMAN (First Floor) HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 4A: WALTHAMSTOW HOUSE (Massing) A3.3 Option 4a 1 New sports hall at Wiseman 2 New 6th form block at Walthamstow House: 6 classrooms, library and study 4 3 Library remodelled for Science East end extension - 2 floors: ground D&T extended for Science first with two new arts rooms Walthamstow House sports hall converted to ICT with mezzanine 6 5 6 Upgraded kitchen and Hall at Walthamstow House 7 New kitchen, new dining, refurbished Sports Hall and remodelled existing kitchen as multi-use space at Wiseman 8 Wiseman changing rooms remodelled as wcs 3 9 Wiseman new entrance and circulation 2 8 7 9 1 Wiseman Walthamstow House HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 4A: WALTHAMSTOW HOUSE (Aerial) A3.3 Option 4a New sports hall at Wiseman New 6th form block at Walthamstow House: 6 classrooms, library and study Library remodelled for Science East end extension - 2 floors: ground D&T extended for Science first with two new arts rooms Walthamstow House sports hall converted to ICT with mezzanine 6 6 Upgraded kitchen and Hall at Walthamstow House 7 New kitchen, new dining, refurbished Sports Hall and remodelled existing kitchen as multi-use space at Wiseman 5 4 8 Wiseman changing rooms remodelled as wcs 3 9 Wiseman new entrance and circulation 2 8 7 9 1 Wiseman Walthamstow House HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 4A: WALTHAMSTOW HOUSE (Ground Floor) HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 4A: WALTHAMSTOW HOUSE (First Floor) HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 4B: WALTHAMSTOW HOUSE (Massing) A3.4 Option 4b 1 New sports hall at Wiseman 2 New 6th form block at Walthamstow House: 6 classrooms, library and study 3 Library remodelled for Science East end extension - 2 floors: ground D&T extended for Science first with two new arts rooms Walthamstow House sports hall converted to ICT with mezzanine 6 6 Upgraded kitchen and Hall at Walthamstow House 5 3 7 New kitchen, new dining, refurbished Sports Hall and remodelled existing kitchen as multi-use space at Wiseman 8 Wiseman changing rooms remodelled as wcs 9 Wiseman new entrance and circulation 4 2 8 7 9 1 Wiseman Walthamstow House HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 4B: WALTHAMSTOW HOUSE (Aerial) A3.4 Option 4b New sports hall at Wiseman New 6th form block at Walthamstow House: 6 classrooms, library and study Library remodelled for Science East end extension - 2 floors: ground D&T extended for Science first with two new arts rooms Walthamstow House sports hall converted to ICT with mezzanine 6 6 Upgraded kitchen and Hall at Walthamstow House 5 7 New kitchen, new dining, refurbished Sports Hall and remodelled existing kitchen as multi-use space at Wiseman 4 8 Wiseman changing rooms remodelled as wcs 3 2 9 Wiseman new entrance and circulation 2 8 7 9 1 Wiseman Walthamstow House HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 4B: WALTHAMSTOW HOUSE (Ground Floor) HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

OPTION 4B: WALTHAMSTOW HOUSE (First Floor) HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

WISEMAN OPTION (with Option 4A or 4B) iseman: Ground Floor Option 4a and 4b: W HOLY FAMILY CATHOLIC SCHOOL AND SIXTH FORM

SUMMARY All Options provide; Option 3A Option 4A Option 4B Sports Hall at Wiseman Same amount of accommodation Same quality of accommodation Same type of accommodation Option 3A Improvement to Wiseman but not to Walthamstow House Option 4A Splits improvements over both sites but unachievable within timescale Option 4B Delivers improvements at both sites and acceptable in planning terms Holy Family

NEXT STEPS Agreement to Option 4B 08/09/15 In principle (pending refined design) Refined Option 4B w/c 14/09/15 For approval to Headteacher Families Directorate Approval w/c 21/09/15 Detailed Design Consultation commences w/c 28/09/15 Holy Family