A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.

Slides:



Advertisements
Similar presentations
US101: SE 16 th – SE 36 th Street (Lincoln City) )Project Community Advisory Committee July 11, 2007 Meeting.
Advertisements

Beltline Highway ITS – Ramp Metering Project ODOT Planners Meeting April 25, 2012.
Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
CityCo, Piccadilly Hoteliers Forum
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
London Streets...The Way Ahead Garrett Emmerson Chief Operating Officer: London Streets.
May 14, st Street and 2 nd Street Couplet Traffic Modification Project.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Site Location Site Bus Stop Footbridge 400, 800, 1,200 and 1,600 Metre Walk Distance Primary Shopping Areas
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
The City of Gdynia City rights in 1926 With Sopot and Gdańsk forms the Tri-City agglomeration It has inhabitants Port city, employment structure:
Enhanced analytical decision support tools The Scheme level Final workshop of the DISTILLATE programme Great Minster House, London Tuesday 22 nd January.
MTF Rail Development Forum
Dynamic Speed Limits to improve local air quality Henk Stoelhorst Rijkswaterstaat, Centre for Transport and Navigation.
Cycle Skills Network Audit Mark Strong Managing Consultant Transport Initiatives LLP 145 Islingword Road Brighton BN2 9SH
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
CENTRAL ACCESS SCHEME FOR THE CITY OF KILKENNY Traffic Considerations The feed back resulting from public consultation did cause us to revisit the traffic.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Modelling of Trips using Strategic Park-and-Ride Site at Longbridge Railway Station Seattle, USA, Oct th International EMME/2 Users Conference.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
South/West Corridor Transit Improvements PRIMO & ENHANCED AMENITIES PLANNING PHASE September 9, 2014 Planning & Project Development Committee August 11,
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
59 ½ Southwark Street London SE1 0AL (UK) ++44 (0) / Land Use Planning and Mobility Management Securing travel.
Safe roads, Reliable journeys, Informed travellers M1 Junctions High Occupancy Vehicle (HOV) Lane Presentation for PCM International Scanning Tour.
Modeling HOT Lanes TPB’s Approach AMPO Travel Modeling Group March 21, 2006 I:\ateam\meetings_conf\ampo_tms\ \Hot_Lane_Pres_to_AMPO_Final.ppt.
INTRODUCTION THIS IS AN EXHIBITION OF THE “CAMBORNE POOL REDRUTH TRANSPORT STRATEGY STAGE 1” PLANNING CONSENTS WERE GRANTED IN NOVEMBER 2008 AND JANUARY.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Safer roads, Reliable journeys, Informed travellers 1 GETTING THE BALANCE RIGHT : Managing Development Managing Capacity Managing Demand INFLUENCING TRAVEL.
Transport Update Chris Carter Transport Strategy Manager.
Roads & Traffic Department College Green Public Transport Priority measure.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Southall Traffic Congestion and Parking Provision Specialist Scrutiny Panel 21 November 2006 Transport Planning for Southall.
16 October London Borough of Merton Transport Liaison Robert Pontin.
21st October 2015 Stillorgan Village Area Movement Framework Plan PUBLIC CONSULTATION INFORMATION PERIOD DOCUMENT.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
A64 (T) Hopgrove Roundabout Improvements. Background The roundabouts at Hopgrove are located to the north east of the City of York and form a junction.
30 Stockton Transit Priority Project Chestnut November 10, 2015 Marina Community Association.
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure  Dealing with Traffic Growth &  Considering the needs of all Road Users.
Land west of Grace Crescent, Hardwick Presentation to Hardwick Parish Council 23/08/2016.
Existing MOVA Control Existing Layout Operational Issues Including: Controlling each junction approach ‘in turn’ can result in long ‘wait times’ for both.
Feedback – key themes : Traffic
JUAN DE FUCA PEDESTRIAN CROSSING Transportation and Public Infrastructure Committee Colwood, BC 1 October 2012.
MOVA Traffic Signal Control Trial
Fordham at Columbia as a Grade-Separated Intersection
Evaluation and Re-Design Haifa and Yafa Streets.
Metro Railway How it began
After the NACTO Guide Now I’m going to discuss the options available within the NACTO Urban Bikeway Design Guide.
JMP EDA Transport Study South Marston Samantha Howell Principal Transport Planner Strategic Growth and Regeneration Team.
City Connect 2 LEEDS CITY CENTRE IMPROVEMENT JOHN WHITE – PROJECT LEAD
New Public Transport Infrastructure
KEYNOTE STAGE SPONSOR.
Fordham at Columbia as a Grade-Separated Intersection
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Presentation To Cherrywood Inquiry (Luas B1)
FREEWAY MANAGEMENT SYSTEMS:
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Introductions -Andy Willis, Project Manager -Senior Engineer, Local Roads and Traffic Team, West Midlands

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Traffic and Local Roads Team -What Do We Do? -Conceptual design -Preliminary design -Modelling -Public consultation -Safety work -Detailed design -Contract preparation -Site supervision -Wide range of skills and projects. -Maximising existing road space. -Improving sustainable forms of transport. -Projects have short timescale to construction.

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Preliminary Design: A34 Corridor Study - Background -FaberMaunsell commissioned by Sandwell MBC via Centro term commission to carry out study on A34 in Sandwell. -This section of dual carriageway is a main entry point into West Midlands conurbation via Junction 7 of M6 and suffers from serious congestion problems, especially in both morning and evening peak periods. -Study to embrace Bus Showcase, Red Routes initiatives. -Consider the impact of Metro (Light Rail) on the corridor. -Use of micro-simulation modelling.

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 A34 Corridor Study – Bus Showcase -Bus Showcase -West Midlands tool – Partnership with authorities and bus operators -Improvement of all aspects of bus journey to make travel by bus more desirable. -Improvements measured against set of targets. Network Access Integration Accessible Design Frequency Reliability Journey Times Promotion Information Customer Care Attractiveness/Comfort Personal Security

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 A34 Corridor Study – Red Routes -Red Routes -More efficient use of existing road space. -Controlling parking and loading activity -Improving junction operation -Addressing accident problems -Improving pedestrian movements -No Stopping rather than No Waiting -Red lines to emphasise important route.

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 A34 Corridor Study – Proposals and Solutions -4km Length of Dual Carriageway from Old Walsall Road junction (Birmingham Boundary) in South to Merrions Close (Walsall Boundary). -Project looked at entire corridor -Main junctions on corridor -Old Walsall Road junction -Scott Arms Junction -M6 Junction 7 -Chapel Lane

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Old Walsall Road Junction -ISSUES -Desire to remove existing subway facility. -U-turning traffic south of Scott Arms junction. -High speeds of vehicles using parallel merge combined with poor visibility from Jayshaw causing concern with local people. -PROPOSALS -Provide street-level crossing points. -Junction re-aligned and signalised to permit right turning out of Old Walsall Road -Re-align junction and signalised left turn out of Old Walsall Road

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Scott Arms Junction -PROPOSALS -Change order of signal stages to improve capacity -Provide staggered pedestrian crossing facility across Queslett Road -Bus lanes provided on approach to maintain benefit to buses in future years -ISSUES -Heavy congestion in peak periods -No pedestrian stage across Queslett Road. -High levels of queuing in future years

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 M6 Junction 7 -PROPOSALS -Signalise entries onto gyratory. -Manage traffic by relocating queues on network. -ISSUES -High levels of queuing on both approaches to the gyratory -In future years high volume of traffic on gyratory creates risk of severe congestion to the network

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Chapel Lane Junction -PROPOSALS -Convert to signalised junction to control movements at junction. -Include at-grade crossing facilities as part of junction. -Bus lane provided on southbound approach to ensure benefits to bus maintained. -ISSUES -Right turning accident problem -Recognised rat run -Desire to remove existing subway -High level of queuing in future years

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Predicted Benefits From Route Improvements Journey Time -AM peak -Southbound -5 minutes saving for general traffic -2 minutes saving for buses -Northbound -No change in journey time for general traffic -2 minutes saving for buses -PM peak -Southbound -No change in journey time for general traffic -1 minutes saving for buses -Northbound -3 minutes saving for general traffic -2 minutes saving for buses

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Predicted Benefits From Route Improvements Other -Future Years -Design year Benefits are maintained. -Corridor can be controlled using queue relocation. -Pedestrian Facilities -Conversion of subways to at-grade crossing facilities. -Extra pedestrian crossings. -Raised entry treatments at side roads. -Parking and Loading -Removal of double parking at Scott Arms (Birmingham). -Minimal loss of parking spaces. -Extra provision for loading.

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 How Will the Scheme Progress? -Consultation with general public, October Successful response -Minor amendments required to scheme -Detailed design and contract preparation, Spring-Summer Possible construction and site supervision, December Monitoring success of scheme, Autumn 2006 – Spring 2007

A34 Corridor Strategy - Strategic Route Improvements, 25th November 2004 Thank you for listening. Any questions?