CoCom F2F meeting Chicago April 9-10, 2013. Expectations for April 9-10 2012-13 – 15 month Plan and Budget – Final budget to submit to BoD – Plan for.

Slides:



Advertisements
Similar presentations
CDCs 21 Goals. CDC Strategic Imperatives 1. Health impact focus: Align CDCs people, strategies, goals, investments & performance to maximize our impact.
Advertisements

Presented by: Jerry Legge Associate Provost for Academic Planning (Interim), and Professor of Public Administration and Policy (SPIA) Provost Advisory.
2011 PI Conference Overview Assessment/Evaluation 2. Collaboration 3. Dissemination 4. Faculty Development 5. Key Challenges 6. Materials Development.
Establishing Research Priorities for Public Health Emergency Preparedness in Canada: Results of a Scoping Review and Priority- Setting Meeting Yasmin Khan,
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
This slide set was developed by the Sustainable Development Unit (SDU) as part of the four month consultation and engagement exercise (Jan.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
Subduction Zone Observatory An international multi-disciplinary observatory along a subduction zone plate boundary (ies?) “subduction collaboratory” 2014.
1 Why is the Core important? To set high expectations – for all students – for educators To attend to the learning needs of students To break through the.
PHAB's Approach to Internal and External Evaluation Jessica Kronstadt | Director of Research and Evaluation | November 18, 2014 APHA 2014 Annual Meeting.
Family Outreach and Response Program Strategic Plan September 26 th, 2012.
CoCom 2012 April Budget framework: NSF merger of IRIS Cooperative Agreement & IRIS USArray into a single proposal - NSF (and gov’t) envisions.
Implementing Sustainable Development Sustainable Procurement & Corporate Social Responsibility Achieving Level 3 of the Flexible Framework.
South Seattle College BUDGET HEARING FY June 3, 2015.
Grantwriting. Types of Grants Foundation Grants HancockREADS Grants Hancock Education Fund Grants.
PRESENTATION TO THE MHSA PLANNING STAKEHOLDER STEERING COMMITTEE FEBRUARY 24, 2014 MHSA THREE-YEAR PROGRAM AND EXPENDITURE PLAN –
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland, New Zealand, September 2008.
1. 2 Why is the Core important? To set high expectations –for all students –for educators To attend to the learning needs of students To break through.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
The Adaptation Policy Framework Bill Dougherty Stockholm Environment Institute – Boston Center Manila April 2004 An overview of the new UNDP-GEF product.
Facilitate – Collaborate – Educate CoCom April 9, 2012.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in Asia May 2008, Manila.
Enterprise Risk Management (ERM) Minnesota Department of Transportation Enterprise Risk Management (ERM) Minnesota Department of Transportation TRB International.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
Chapter 10 Contemporary Project Management Kloppenborg
Final evaluation of the Research Programme on Social Capital and Networks of Trust (SoCa) 2004 – 2007: What should the Academy of Finland learn.
Oregon State Board of Education January 19, 2012.
April 2014 CoCom Presentation Template. SAGE Award First Year Budget FY14.
Citizens Redistricting Commission Civic Engagement Proposal February 11, 2011 Center for Collaborative Policy, California State University, Sacramento.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
Project Management April 28, 2008 Eric Verzuh Project Management April 28, 2008 Eric Verzuh.
Technology Planning. Primary Elements Stakeholders Leadership team Needs assessment Technology components Work plan Budget Policies Evaluation.
University of Massachusetts Boston FY11 Budget Process February 25, 2010.
Overview of EarthScope 2010 May, 2010 Slides that may be used and modified for presentations involving instrumentation, data, science results, and education.
Homeland Security Grant Program 2015 Process Michelle Hanneken Illinois Emergency Management Agency.
Informing a data revolution right data, to the right people, at the right time, in the right format The IDR road map Bangkok Regional Workshop July 17-18,2014.
0 United Nations Capital Development Fund Summary of Strategic Partnership Between UNDP and UNCDF Moving Closer Together in the Context of the UNDP Strategic.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
USArray Year 10 IRIS CoCom Meeting Chicago April 9-10, 2012.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
OFFICE OF SCIENCE 2.3 Infrastructure and Installation Sims, Edwards 1.Does the conceptual design and planned implementation satisfy the performance specifications.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Integrating DRR into the CCA/UNDAF Process Introduction of new guide.
Office of Academic Affairs January 12, 2007 Confirming Portland State’s Leadership Position and Defining Academic Priorities Campus Symposium 2007.
GSN Budget CoCom meeting Chicago April 9-10, 2012.
Anglophone West School District Education Council Sustainability Study – Bath Elementary and Middle Schools Executive Summary April 23, 2015.
A facilities program for collection and distribution of seismological data for research and education related to: Earthquakes Earth Structure Earth Dynamics.
An Evaluation and Learning Framework for KPCF KPCF Learning Collaborative KPCF Impact Evaluation.
Midwest Big Data Hub Letters of Intent for NSF Edward Seidel Director, NCSA Founder Prof. of Physics, Prof of Astronomy On behalf of the Midwest.
Smart Schools Bond Act Investment Plan Submission Information and Review Process Presentation to Regional Partners Hosted By: Capital Region BOCES October.
Proposition 1 Workshop: the Grant Application Process July 2015.
By Tim Ahern, Director of Data Services, IRIS An Overview of IRIS Incorporated Research Institutions for Seismology.
Presentation to Board June 17, 2008 Presented by: J. A. Sabo, Associate Director – Leading Services & Treasurer of the Board BUDGET York Catholic.
1 Strategic Plan | May Decisions on rates, budgets, investments, programs and services for six years ( ) The Strategic Plan.
Progress Report and Recent Developments Carol S. Carson AEG Meeting March 19-23, 2007.
Course, Curriculum, and Laboratory Improvement (CCLI) Transforming Undergraduate Education in Science, Technology, Engineering and Mathematics PROGRAM.
October 2013 CoCom IRIS Portable Seismology PASC Version.
BIO AC November 18, 2004 Broadening the Participation of Underrepresented Groups in Science.
By Tim Ahern, Program Manager IRIS DMS An Overview IRIS Incorporated Research Institutions for Seismology.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
PROPOSED STRATEGIC PLANNING PROCESS DECEMBER 3, 2014 Port of Port Angeles.
CIRTL Network Administrative Meeting Wednesday May 6, :00-1:00 ET/ 11:00-12:00 CT/ 10:00-9:00 MT / 9:00-8:00 PT This meeting will be recorded Backup.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Roadmap for Programme of Work
STFC Update – Programmes Directorate PPAP Community Meeting
Preliminary Project Execution Plan
Presentation transcript:

CoCom F2F meeting Chicago April 9-10, 2013

Expectations for April – 15 month Plan and Budget – Final budget to submit to BoD – Plan for materials to Rob to prepare for submission to NSF – Proposal materials – Far from prepared for final decisions – Review of core budgets wrt targets – Presentation and summary of initiatives Programmatic and pan-IRIS – Identification of missing pieces – CoCom priorities on initiatives – Schedule for budget iterations – pre and post BoD – Confirmation for submission of draft program descriptions

Challenges Anticipating review Collaborating with UNAVCO/PBO – Especially wrt Cascadia and Alaska (and Subduction Observatory?) Syncing with NSF – What is EarthScope? – What are core services? – What are new initiatives? – What is 1-in-4? – What is IRIS? Planning for eventual budget reductions? Leading and pushing the envelope – A key issue with “New Technologies” Predicting the future Preparing for 2018

Uncertainties NSF Intentions – EarthScope vs Core – Innovation vs Status Quo TA – Alaska NSF mandate? Exit strategy – 2018 or later? Cost, schedule and scope containment / contingency – Eastern US - 1-in-4 Schedule impact Cost impact – Equipment capitalization Instrumentation – New Technology “Large N” – Replacement GSN – Primary PAS/FA - TA inheritance

Proposal Themes Sustain the core Prepare for the future Quality Initiative International leadership Protecting the NSF investment – Completing EarthScope – Equipment re-use Balancing Services – TA/FA – Data Services -> pan IRIS Communicating with the Community

What to take to the Board? USArray Issues – Extent and shape of Alaskan investment – TA scope and schedule – MT scope and schedule – FA/PAS merge policies Cascadia Initiatives – As proposed by CoCom How to incorporate new initiatives New technologies

NSF Guidance The GESF proposal will be based on an underlying integrated Work Breakdown Structure (WBS) with the following high-level elements: (a) Management of the Global Seismographic Network; (b) Management of the USArray Transportable Array, including magnetotelluric systems; (c) PI support, including PASSCAL and the USArray Flexible Array; (d) Polar programs support activities; (e) Data management activities; (f) Education and outreach efforts; (g) New initiatives; and (h) Project management.

From NSF Guidance Response The proposals should not include an annual IRIS Community Workshop, UNAVCO Community Workshop, and EarthScope Science Workshop. The EAR viewpoint is unanimous. The current structure of IRIS and UNAVCO Community Workshops every other year, alternating with EarthScope Workshops in the intervening years, in addition to the SSA Annual Meeting, the AGU Fall Meeting, and numerous smaller workshops, provides ample opportunity for community engagement and discussion. We emphasize that focused workshops may always be proposed separately. “New initiatives” are those activities that would be new and would be conducted during all or part of the 5-year proposal period. They must be fully described in the proposal and the budget.

We ask that the proposals include the following budget tables in addition to those requested previously: – The budget tables should present rolled-up budget numbers at each WBS level. For example, the SAGE budget tables should include subtotals that add up all x activities into a single number, all 3.1.x activities into a single 3.1 number, etc. – We also request that both SAGE and GAGE proposals include a table and graphic showing the total budget requested for activities that cross multiple WBS elements, including at least management, governance, data, and instrumentation; you could also consider an “other” category.