60-499 Project Management: Techniques & Tools % of commercial projects fail. % of open source projects fail. Chapters 1-2.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Project management Information systems for management1 Project Management.
Chpter#5 -part#1 Project Scope and Human Resource Planning
Why do projects fail? % of commercial projects fail. % of open source projects fail
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Systems Analysis and Design 9th Edition
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
Degree and Graduation Seminar Scope Management
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
Project Management Basics
Project management INTRODUCTION. Information Technology Project Management, Fourth Edition 2 IT projects have a terrible track record. A 1995 Standish.
1 M&S Teachers Seminar: Project Management Presented by: Paul E. Paquette September 26, 2013.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Advanced Project Management Project Plan Templates
Project Management – The Project Charter
Project Management Lecture 5+6 MS Saba Sahar.
Project Management Fundamentals Project Organization and Integration
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
S/W Project Management
Copyright Course Technology 1999
Software Testing Lifecycle Practice
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Basic of Project and Project Management Presentation.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Week 2 Seminar: Project Scope Management
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Welcome to Session 3 – Project Management Process Overview
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Applied Software Project Management
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
Meeting Management/Planning. Today Go over basics of meeting management Introduce key elements of creating a plan.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Chapter 3 Managing the Information Systems Project 3.1.
Initiation Project Management Minder Chen, Ph.D. CSU Channel Islands
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 3. Defining the System A Use Case Primer Organizing.
Project Management Training
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
The Project Management Process Groups
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
Information Technology Project Management, Seventh Edition.
Chapter 3 Project Management Parts of this presentation is extracted from Ian Sommerville’s slides located at
PM ? Fools rush in where angels fear to tread. A stitch in time saves nine. Measure twice, cut once. Look before you leap. What do all these sayings have.
% of commercial projects fail. % of open source projects fail.
Project Management PTM721S
Chapter 11 Project Management.
Systems Analysis and Design in a Changing World, 4th Edition
Principles of Information Systems Eighth Edition
Project Management and Information Security
Chapter 3 Managing the Information Systems Project
Engineering Project Project Management Project Management.
Project Management Process Groups
Project Management Chapter 11.
Presentation transcript:

Project Management: Techniques & Tools % of commercial projects fail. % of open source projects fail. Chapters 1-2

Project Management: Techniques & Tools 80 % of commercial projects fail. % of open source projects fail.

Project Management: Techniques & Tools 80 % of commercial projects fail. 90 % of open source projects fail.

Project Management: Techniques & Tools 80 % of commercial projects fail. 90 % of open source projects fail. Why?

Project Management: Techniques & Tools Course Overview What we’ll be doing this year

Project Management Phases 1. Defining 2. Risks 3. Planning & Scheduling 4. Launching 6. Closing 5. Monitoring & Controlling

Project Management: Techniques & Tools Why do projects fail?

We need to ask these important questions: –What kind of failure was it? e.g. incomplete, unreliable, off-schedule/budget –Who was responsible? –What happened? –What did not happen? –Which process(es) broke down? –What module(s)/feature(s) failed?

Where failure can happen 1. Requirements 2. Risks 3. Planning & Scheduling 4. Launching 6. Closing 5. Monitoring & Controlling Built the wrong thing Ignored potential pitfalls Overly optimistic schedules Poor team dynamics Poor development practices No customer acceptance

Reasons for project failure These reasons seem to blame the developers: –Poor design –Uncommitted or de-motivated developers –Weak, antagonistic, unreliable developers/contractors –Gold-plated features or documentation –Autobahn development or bug-fixing –Silver bullet syndrome –Lack of source control –Abandoned planning

Reasons for project failure These reasons seem to blame the customer or upper management: –Feature creep –Unrealistic schedules –Unrealistic expectations –Incorrect requirements

Reasons for project failure These reasons seem to blame the project manager: –Poor planning –Insufficient risk management –Insufficient quality assurance Who is really responsible for these problems? –The project manager

A project manager’s role A major role of a project manager (PM) is to ensure that the project succeeds –To a lesser degree, this is also a role for other stakeholders Therefore, the PM is responsible (if not to blame) when these problems occur A project manager must remain unbiased –Customers or upper management may ask for unrealistic features and/or schedules –It is not a project manager’s role to make such schedules work, by pushing developers harder

Project management careers A PM is someone with years of experience This is usually someone who… –has experienced successful projects –has experienced failed projects –has excellent organizational skills –has excellent communication skills –is a strong leader Common project management certifications: –Project+: Entry-level certification, for aspiring project managers –PMP: Professional cert., for experienced project managers Project management body of knowledge (PMBOK)

Project Management: Techniques & Tools Project Management Overview

Project management approaches The textbook three approaches to project management: –Traditional This approach has been used for IT projects, nearly unchanged, for decades –Adaptive This approach is one which combines some of the best features of the traditional and extreme approaches –Extreme This approach is the project management approach that goes along with eXtreme Programming (XP)

Upstream activities Upstream activities are things that normally happen prior to development –Defining –Planning –Architecture & design Traditional –Upstream activities occur for the whole project in one step Although changes can be made Extreme –Upstream activities occur for each version Each iteration produces a version that is closer to the ultimate goal

Traditional project management Defining Planning Launching Monitoring & Controlling Closing

Adaptive project management Defining Planning Launching Monitoring & Controlling Closing

Extreme project management Defining Planning Launching Monitoring & Controlling Closing Next version

Processes Here are the processes of project management: –Defining –Planning –Launching –Monitoring & Controlling –Closing

Defining We need to determine what the customer wants We do this by identifying: –Requirements Goals Deliverables Success criteria Scope –Risks Impact Probability

Planning We know what we want Now, we figure out how to do the work required We do this by: –Performing architecture & design –Identifying activities: work breakdown structure (WBS) –Identifying dependencies between activities –Estimating activity duration –Estimating activity resource requirements –Scheduling activities (start date, duration)

Launching We have a detailed work plan Now, we get the work underway We do this by: –Choosing participants –Making participants available for the project –Assigning work to participants –Organizing participants into team(s) –Providing resources to the team(s) –Establish constraints and freedoms for the team(s)

Monitoring & Controlling We have people working on activities Now, we must ensure we are making adequate progress We do this by: –Interviewing and observing progress reports –Implementing version control software –Providing mechanisms for requesting changes –Continually updating plans (e.g. schedules)

Closing We have completed all activities –The result should be that All overall goals are satisfied All conditions of satisfaction are met All deliverables are ready for roll-out Now, we need to complete hand-over We do this by: –Obtaining client acceptance –Deploying deliverables e.g. media disks, printed manuals, online deployment/downloads –Performing a post-mortem analysis How did we do?

Project Management: Techniques & Tools Explanation of Terms

Goals A goal is normally a solution to a problem When defining goals, answer the following questions: –What problem will we solve? e.g. Accounting department has 2 month turnaround for budget requests, which is too long. –In what sense will we solve the problem? e.g. Our accounting software will streamline the process of budget re-work. We often have one overall goal –This may be made up of several smaller sub-goals (objectives) e.g. The software will look in volatile financial areas first, allowing the accounting department to quickly find the resources.

Success Criteria Success criteria define what must be true in order for the project to be considered a success –These are related to the goals –However, they are attributes that can be measured e.g. The accounting department’s time to approve a budget is reduced by at least 50%. –We can measure after the project’s completion and test for success

Deliverables Deliverables are the actual artifacts created by the project team for the customer These typically include: –Binary packages –Source packages (in open source projects) –Documentation & tutorials –Version history –Utilities –Installation software

Scope The project’s scope defines its boundaries –This could include specific statements These are called requirements Often, a project manager will work with customers to decide which requirements are necessary, and which are not –This could also include general statements These could be used to determine whether or not a feature request (change) is appropriate later Thus, scope deals with both requirements and changes

Risks Risks are things that could cause the project to: –Fail –Be delayed –Require additional budget –Require additional personnel A project manager should identify: –Impact: What is the expected negative impact should it occur? –Probability: How likely is it to occur?

Activities An activity is something a participant may undertake –This could be: Designing a module Updating documentation Optimizing the search code Installing the binaries in a web server Writing a lookup method Activities can be: –Estimated for time & resource requirements –Assigned to team member(s)

Schedule A schedule is a time-plan for activities The schedule must: –Include all activities –Show dependencies between activities e.g. What must occur before this activity can start? –Show estimated durations for activities –Show starting points for activities –Show combined activity duration as project duration –Show estimated resources for activities –Show combined activity resource requirements as project resource requirements

Team A team is a group of participants with shared objectives –However, teams do not have to have the same skills and experience Team effectiveness is impacted by: –Individual participant effectiveness –Social dynamics within the team –Motivation –Team leadership

Project Management: Techniques & Tools Project Milestones

The various processes may overlap, but they should eventually produce these results: –Project charter –Project scope statement –Risk document –Work breakdown structure (WBS) –Project plan (project proposal in the textbook) –Architecture & design –Deliverables –Post-mortem analysis

Project Charter The project charter defines –The business justification –The overall goals of the project –The stakeholders of the project –The desired costs and duration of the project The project charter is often produced by the project sponsor or customer This should be the first page in your book of project management documentation

Project Scope Statement The project scope statement defines: –The project’s requirements Goals Success criteria Deliverables –The project’s boundaries What should be part of the project What should not be part of the project

Risk Document The risk document: –Identifies and describes risks –Describes what conditions make it happen –Describes the probability of it happening –Describes the impact of it happening –Describes a plan for how to (try to) avoid it happening –Describes a plan for what to do if it happens This is only done if the probability and/or impact necessitate such a plan

Work Breakdown Structure The WBS: –Defines all activities Each system function is defined as a high-level activity Each activity is broken down into smaller activities This process repeats until activities are small and manageable –Shows hierarchical relationships between activities A WBS can be represented with a tree diagram

Project Plan The project plan defines: –Dependencies between activities e.g. IVG module test design must be complete before development can begin –Schedule Including an estimate of each activity’s duration –Initial activity assignment Activities are assigned to fictitious team members

Architecture & Design Architecture refers to the overall structure of the application –In short, an architecture defines the modules –Each module has a set of common responsibilities Often, these responsibilities are related –e.g. The DAL module is responsible for maintaining consistency between customer objects and the database of customer data Design refers to the structure of the module itself –This often involves creating classes (in OOD) and assigning responsibilities (functions or data) to them

Post-Mortem Analysis A post-mortem involves analyzing the project upon completion –This is not to be confused with QA, which analyzes the deliverables A post-mortem is a critical step, that many project managers miss –This is a project manager’s chance Perhaps they can more accurately estimate activities after the experience Perhaps they can identify mistakes made, to avoid making them again Perhaps they can recognize personal achievements

Summary Project management’s job is to ensure that projects do not fail –We must identify what the customer wants –We must identify potential pitfalls –We must list what needs to be done –We must make detailed plans –We must prepare for changes –We must ensure that our plans are being followed –We must ensure that our plans are working If not, we must update them or take another corrective action

Project Management: Techniques & Tools Questions?