Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
26 Mar 2012Px Ph1 Upgrade - IT1 Salvatore Costa - Catania Px Ph1 Upgrade - IT, Perugia, 26 Mar 2012 Stato attività e procurement a Catania
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10,
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
David Lee, FVTX Review Nov Cost and Schedule WBS 1.0 David M. Lee Los Alamos National Lab Deputy Project Leader.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Pixel Upgrade Phase I CMS Upgrade Week 27. April 2010 R. Horisberger, PSI.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
PSD upgrade - schedule/resources: electronics and cooling system F. Guber INR, Moscow NA61/SHINE upgrade workshop, CERN 3– 5 March, 2014.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/28/2012.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
March 19, 2013W. Bertl, PSI Status of BPIX Cooling Activities W. Bertl, PSI.
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
D0 PMG, May 04, 2000 Slide 1 Schedule DØ SMT Status Report.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
July 19, 2012 Anna Peisert1 CERN/Taiwan/Helsinki production center Work share Institutes/people Status of preparations.
An Overview of the FPIX Detector Upgrade – CMS Experiment
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
CMS Pixel Upgrade status and outlook G.M. Bilei Sep. 6 th 2011.
Padova, 10 Febbraio 2014 ALICE ITS Upgrade Visita Referee - Sezione di Padova.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
CMS Upgrade CERN April 27, 2010 W. Bertl PSI Power & Cooling: Design Status of BPIX.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
Introduction and News Karl Gill. Introduction Today’s agenda News AOB – Hypernews, Calendar 2012.
NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
SVT – SuperB Workshop – Annecy March 2010
Technical Design for the Mu3e Detector
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
LIU Wire Scanner Milestones June 2017
Pixel Upgrade Status & Plans
10/month is the present production rate 2 FTE + sporadic contributions
Silvan Steuli Roland Horisberger Stefan König CMS Upgrade Workshop
Update on ATLAS insertable B-layer
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013

Introduction and news The Pixel project is progressing pretty much according to the plan ROC PSI46dig / TBM08 submission was done in early January expect wafers (6) back in first half of April plan to order 24 additional wafers (delivery mid May) (enough for 3-4 wafers for each production center) Digital Test Boards will be produced by PSI (requested 15 for INFN) - Need to identify for each consortium one contact person to become expert in maintaining them and support the consortium. Look for volunteer High rate Test Beam at FNAL with digital ROC this summer - Good opportunity to contribute and learn. As INFN we should participate.. Pixel TDR Document now available, one per institute. Firenze G.M. Bilei2

2013 Pixel activities and goals Many tasks to accomplish in 2013: CO 2 cooling plant & piping Install extra LV-power cables for BPIX layer 1 (CAEN  PP1) Submission of digital TBM & ROC (PSI46dig) for Pilot System Production masks for PSI46dig ROC (BPIX Layer 2-4, FPIX) Production of Pilot System and integration into present FPIX Production of BPIX Supply Tubes & Mechanics for installation tests Installation test without beam pipe BPIX Supply Tube protoytpe with sector test of all electrical boards Preseries digital pixel modules with full functionality (sensor, HDI, cables, BB) High rate test pixel test beam at FNAL Firenze G.M. Bilei3

INFN plan and objectives for 2013 Complete construction of 8 old modules with analog ROC at IZM - All parts are available. IZM delivery very soon - Complete setups and qualification of INFN production centers Evaluate, qualify together with KIT the Selex BB process and reassess cost. Select Bump Bonding vendor (IZM, Selex) by September at latest. Set up new readout systems for digital ROC in the lab and get experience Construction of few prototypes of new digital pixel modules Preparation for mass construction (new readout cards, database, software analysis etc.) Possibly participate to the FNAL high rate test beam in summer Firenze G.M. Bilei4

INFN draft Pixel schedule INFN Pixel activities JanFebMarAprMayJunJulAugSepOctNovDec Analog Module Bump Bonding at IZM Construction and qualification 8 Analog Modules INFN and KIT Bump Bonding R&D at SELEX Qualification of Selex modules INFN Selection of Bump Bonding Vendor Digital Module Bump Bonding Construction and qualification of 10 digital modules Digital ROC and TBM HDI for digital modules Sensors Digital Test Boards Test Beam FNAL Firenze G.M. Bilei5 Milestone INFN Gruppo I Pixel Upgrade 1/12/2013 Realizzazione primi prototipi nuovi moduli Pixel Upgrade con ROC Digitale

Overall schedule Pixel Construction 6Firenze G.M. Bilei

Pixel Construction TDR milestones 7Firenze G.M. Bilei

Firenze G.M. Bilei 8 Half Layer 22 faces 8 modules/faces =176 modules Needs  250 modules allowing for 80% yield and 15% spares Contribution to 50% of BPix layer 3 Draft INFN Plan 2011 Start setting up Production ~ 8 old analog modules 2013 Production of few new modules 2014 Start mass production 2015 End module prod & integration 2016 Commissioning and Installation

Module construction flow chart Sensors test ROC Test after dicing TBM and HDI testing Company Bump bond Glue/bond TBM to HDI Test before glue HDI to sensor module characteri- zation Burn-in X-ray calibration Pisa Catania Bari Perugia Perugia/Pis a Half Layer Assembly and testing Bare Module test SiN-rails glue Bond ROCs to HD Glue HDI to bare module Module testing Padova

Pixel Construction Costs as TDR Firenze G.M. Bilei10 INFN contribution to construction 803 Ke (963 KCHF) UK contribution on FED withdrawn. Currently 690 KCHF are missing

INFN Pixel Upgrade spending profile 11