GridPP Funding Model(s) D. Britton Imperial College 24/5/01 £21m + £5m.

Slides:



Advertisements
Similar presentations
Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Symantec 2010 Windows 7 Migration Global Results.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Variations of the Turing Machine
1
Sequential Logic Design
Copyright © 2013 Elsevier Inc. All rights reserved.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Custom Services and Training Provider Details Chapter 4.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
27  9 =.
1  1 =.
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
S.L.LloydGridPP Collaboration Meeting Introduction Slide 1 GridPP - Introduction Welcome to the First GridPP Collaboration Meeting Introduction A brief.
Tony Doyle GridPP2 Proposal and Responses to Questions, Grid Steering Committee, Coseners, 28 July 2003.
Fabric and Storage Management GridPP Fabric and Storage Management GridPP 24/24 May 2001.
GridPP4 – Revised Plan Implementing the PPAN recommendations.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Partner Logo Tier1/A and Tier2 in GridPP2 John Gordon GridPP6 31 January 2003.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
Particle physics – the computing challenge CERN Large Hadron Collider –2007 –the worlds most powerful particle accelerator –10 petabytes (10 million billion.
Level 1 Components of the Project. Level 0 Goal or Aim of GridPP. Level 2 Elements of the components. Level 2 Milestones for the elements.
GridPP Presentation to PPARC Grid Steering Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
GridPP Presentation to PPARC e-Science Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
Steve Lloyd Tony Doyle GridPP Presentation to PPARC e-Science Committee 31 May 2001.
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
Turing Machines.
PP Test Review Sections 6-1 to 6-6
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Operating Systems Operating Systems - Winter 2010 Chapter 3 – Input/Output Vrije Universiteit Amsterdam.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
S.L.LloydGridPP CB 4 December 2003Slide 1 Agenda 1.Minutes of Previous Meeting (19 Feb 2003) 2.Matters Arising 3.Announcements (Steve) 4.GridPP2 Proposal.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
GridPP News NeSC opening “Media” dissemination Tier 1/A hardware Web pages Collaboration meetings Nick Brook University of Bristol.
EGEE statement EU and EU member states major investment in Grid Technology Several good prototype results Next Step: –Leverage current and planned national.
D. Britton Preliminary Project Plan for GridPP3 David Britton 15/May/06.
2 GridPP2 Budget David Britton, 4/12/03 Imperial College.
D. Britton Project Manager’s Report David Britton 12/Jan/2005.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 3 Networking Media.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Before Between After.
THE NATIONAL GALLERY STRUCTURE CHART As at 30 JUNE 2010.
: 3 00.
5 minutes.
Converting a Fraction to %
Clock will move after 1 minute
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
1.step PMIT start + initial project data input Concept Concept.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Dutchess Community College Fire Science program Let’s take a 10 minute break Please be back on time.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
Robin Middleton RAL/PPD DG Co-ordination Rome, 23rd June 2001.
InterGrid Meeting 7 Oct 2001 Tony Doyle. Tony Doyle - University of Glasgow GridPP Status  Financial Background  Deliverables  Recruitment  Regional.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
UK GridPP Tier-1/A Centre at CLRC
Presentation transcript:

GridPP Funding Model(s) D. Britton Imperial College 24/5/01 £21m + £5m

Starting Constraints D. Britton Imperial College 24/5/01 £2.4m – PPARCs commitment to EU DataGrid. £7-10m – PPARCs promise to CERN. £1.8m – BaBar Tier A / £4m – 50% Tier-1 £x m – PPARCs displacement plan. ~ £20m Limited manoeuvring room!

GridPP Proposal (Cmp 1-4) D. Britton Imperial College 24/5/01 Table 6: Resources requested for components 1-4. UK Staff10.7 UK Capital 3.2 CERN Staff 5.7 CERN Capital 1.4 PPARC TOTAL (£m) Total Cost21.0 } £7m for CERN £3m for Tier-1A hardware Includes £2.4m for DataGrid staff

GridPP Proposal : Tier Centres D. Britton Imperial College 24/5/01 Table 8: Resource requested for UK Tier centres. Tier Centres Components /2 PPARC 2002/3 PPARC 2003/4 PPARC Total External Funds Staff (£M) UK Capital (£M) Total costs (£M) Total disk (TB) Total tape (TB) Total CPU (SI95) (A 50% Hoffman Tier-1 and four 50% Tier – 2)

GridPP Proposal : UK Work Groups D. Britton Imperial College 24/5/01 Table 9: Resource requested for UK WorkGroups. Work Groups2001/2 PPARC (£M) 2002/3 PPARC (£M) 2003/4 PPARC (£M) PPARC Total (£M) External Funds (£M) Project Managers Staff UK Capital Total Costs DataGrid part of Total

GridPP Proposal: Allocation to Work Groups D. Britton Imperial College 24/5/01 Table 10: Allocation of effort to sets of WorkGroups. Work Groups 2001/2 PPARC FTE 2002/3 PPARC FTE 2003/4 PPARC FTE PPARC Total FTE External FTE A-F G-H (44 +27) 3.0 I J K A Workload Management B Information Services and Data Management C Monitoring Services D Fabric Management and Mass Storage E Security Development F Network Development G Prototype Grid H Software Support I Experimental Objectives J Dissemination K CERN Non CERN Total = FTE. At 54K/FTE this gives £10.3m. Managers are additional £0.4m

GridPP Proposal: Summary D. Britton Imperial College 24/5/01 The proposal requests funding to construct (£3.0m) and operate (£2.4m) a Tier-1A centre. It identifies the need for external funding to upgrade this to a 50% Tier-1 centre for LHC and to construct a number of Tier-2 Centres (£7.3m). It funds hardware (£1.4m) and staff (£5.7m) at CERN. It honours commitments made to DataGrid (£2.4m). It allocates the remaining £6.1m for staff effort to the GridPP workgroups but recognises that this is insufficient to satisfy many of the aspirations/obligations.

GridPP Proposal: Summary D. Britton Imperial College 24/5/01 ~52% UK Staff

Tensions within the GridPP Proposal D. Britton Imperial College 24/5/01 The experiments need vastly increased effort ~ £10m. Hardware minimum commitment is low by ~£2m The EU commitment includes operation of a test-bed so groups G-H are under funded by ~£2m. Work groups A-F are under-funded by ~£3m. Dissemination is under-funded by £2m. When and how will the £8m problem with the core grant reappear? Have we had input from all interested groups? How much money will be really get, and when?

Planning beyond the Submission D. Britton Imperial College 24/5/01 Submitted Model

Planning beyond the Submission D. Britton Imperial College 24/5/01 What if ? Model

Planning beyond the Submission D. Britton Imperial College 24/5/01

Conclusions D. Britton Imperial College 24/5/01 We have a responsive financial model but we dont yet have the input to which it needs to respond. Even in the most optimistic scenario (the submission) there is not enough money to satisfy all the constraints, obligations and aspirations of the community. Hard decisions are going to have to be made. We need to take this opportunity to establish the over-reaching strategic principles that will guide those decisions. We must keep sight of the vision in the face of all the painful detail (and vice-versa!)