LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: 697682 Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.

Slides:



Advertisements
Similar presentations
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
SPS Access Project PL, EMP Chamonix XV, EDMS: SPS Access Safety System Patrick Lienard, Elena Manola-Poggioli on behalf of the SPS Access.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Injection test? Mike Lamont For initial discussion.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
LHC Hardware Commissioning Review May 2005 T.Pettersson - EDMS: TS Department Utilities Safety Access SU - a plea for co-ordination of co-activities.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
Injection test1 Injection test in 2006 The installation schedule version 1.7 recently approved includes a ‘possible injection test’ - foreseen in April.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
Marc Tavlet - GLIMOS1 Paperwork needed to come and work at CERN 1. Access Rights – Registration 2. Tests with Beams 3. Safety Procedures to work at Point-2.
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
Access system M. Gruwé (AB/OP) Thanks to TS/ASE group Extended LTC meeting March 3 rd 2008.
J. Pedersen EN DSO Performance Scientific performance Measurable, reproducible, controllable: Documented presence! Technical performance Measurable,
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
For more info:
The new approach to the CERN Safety Policy and Safety Organisation A. Goehring-Crinon & R. Trant.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
LHC Sector Test 1 Roger Bailey, Helmut Burkhardt, Paul Collier, Brennan Goddard, Stephen Jackson, Lars Jensen, Rhodri Jones, Verena Kain, Alex.
Schedule IT General Schedule 9 th, September 09 Today.
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Access system global tests M. Gruwé LHCCWG January 15 th 2007.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
Access system LHC-SPS M. Gruwé and J. Ridewood OP days March 18 th 2008.
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
(Access system for HWC)
SPS Personnel Protection System Renovation Project
R. Denz, A. Gomez Alonso, AT-MEL-PM
CENF – Personnel Protection System Preliminary Study
CENF – Personnel Protection System Preliminary Study
Evolution and future of the Access safety and control systems
Helium spill in LHC tunnel
LAAWG Status Report – 15th May 2007
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
EP Experiments safety validation process Safety Permits
Workshop on Accelerator Operations
Assumption for a given sector
Access Control for CERN Experimental Areas
Review of hardware commissioning
Presentation transcript:

LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop Chamonix XV – 27 January 2006

LHC ACCESS SYSTEM 2Authors: P, Ninin, S. Grau & LHC access team EDMS: Agenda Introduction Motivation Requirements Interlock chains CCC Situation after the tests Planning Conclusions

LHC ACCESS SYSTEM 3Authors: P, Ninin, S. Grau & LHC access team EDMS: Motivation Protect personnel against radiation hazard during the tests -Access to underground areas around Points 8 and 7 (and the arc in between) must be fully operational during the test -Access doors must be interlocked to disable beam in a failsafe way if safety conditions are violated. Test the access control and safety system -Procedure: patrol, nominal operation, incident management -Access Equipment -Interlock chains -Control system

LHC ACCESS SYSTEM 4Authors: P, Ninin, S. Grau & LHC access team EDMS: Access requirements Temporary interlocked gate in Sector 7-6: -To allow safe continued access to 6-7 the gate should be placed at 800 m from IP7(RP study). Dead zone or confined space -The machine access point at Point 7 (PM76) shall be operational. The machine access point at Point 8 (PM85) shall be operational. The access point between the experimental service cavern and the LHCb experiment shall be operational and the shield wall in place (PZ85) Temporary interlocked gate in Sector 8-1

LHC ACCESS SYSTEM 5Authors: P, Ninin, S. Grau & LHC access team EDMS: Access system Injection Test zones limited to points LHC 7 & 8 Deployment -Access safety system at points 7 & 8 -Access control system at points 7 & 8 -CCC control infrastructure -Redundant cable loop -Patrol LHC 7LHC8CCC Personnel Access16 Material Access15 Sector door811 End of Zone door213 Shielding walls14 racks12206 sectors513 CCC computers10 Total307216

LHC ACCESS SYSTEM 6Authors: P, Ninin, S. Grau & LHC access team EDMS: Installation Underground access system equipment in sectors 7 / 8 shall be installed before the hardware commissioning. Pits head access equipment could be installed during cool down, expected lower traffic. During the PM installation the PZ will remain operational. Estimation of 500 people that needs the new access card

LHC ACCESS SYSTEM 7Authors: P, Ninin, S. Grau & LHC access team EDMS: CCC

LHC ACCESS SYSTEM 8Authors: P, Ninin, S. Grau & LHC access team EDMS: Interlock Chains G. Roy

LHC ACCESS SYSTEM 9Authors: P, Ninin, S. Grau & LHC access team EDMS: Interfaces Access Safety Central Controller Access Safety LHC8 Controller Access Safety LHC7 Controller 18 KV TED87765 MBIAH 8783M MSIB 8813M BIW BIC SPS Access Access safety network

LHC ACCESS SYSTEM 10Authors: P, Ninin, S. Grau & LHC access team EDMS: Authorisation Authorisation during the tests will be given by the DSO or the GLIMOS, final decision by OP Enrolment campaign and new identifier distribution -New identifier included in the dosimeter Biometry Enrolment Personal Dosimeter with identifier

LHC ACCESS SYSTEM 11Authors: P, Ninin, S. Grau & LHC access team EDMS: Access Procedure Before -If necessary access control with restricted list -Patrol During (17 days) -Access closed and interlocked -If access necessary : LHC access mode RESTRICTED After -Supervised Radiation Area Access doors NOT required to define these limits. Personal Dosimeter required -New LHC access system will be operational in 7 & 8

LHC ACCESS SYSTEM 12Authors: P, Ninin, S. Grau & LHC access team EDMS: Planning Underground installation ready Surface installation ready

LHC ACCESS SYSTEM 13Authors: P, Ninin, S. Grau & LHC access team EDMS: Follow-up tasks and linkmen LACS installation and commissioning -> L. Scibile, F.Bonthond LASS development -> T. Ladzinski LASS installation and commissioning -> T. Ladzinski Cabling -> J. F. Juget Equipment Integration -> S. Di Luca Interface with BIC and SPS access safety system -> T. Ladzinski Redundant cable loop installation and commissioning -> M. Munoz LACS, LASS, Cable Loop and Global Access tests -> L. Scibile, T. Ladzinski Testing procedures and team definition -> L. Scibile, T. Ladzinski Patrol and operational procedures definition -> P. Ninin Access cards/dosimeters fabrication, enrolment (500 p) -> L. Scibile, R. Nunes Training to CCC operators -> P. Ninin INB documentation -> E.M. Poggioli Document objectives, requirements, linkmen, milestones, operational modes acess vs. test modes for the Injection Tests from access point of view -> S.Grau Coordination – S.Grau

LHC ACCESS SYSTEM 14Authors: P, Ninin, S. Grau & LHC access team EDMS: Conclusions Goals -Ensure personnel safety (radiation hazards) during the tests -Test the access system itself More particularly the interlocks and supervision part Installation of access system equipment and necessary service is scheduled and organised to achieve this goal. 20 % of the final LHC access system -Little specific -Operational procedure to be prepared and tested Access system for LHC Injection Test will be coordinated by S.Grau.