PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Slides:



Advertisements
Similar presentations
BT TDM on 21CN – Consult 21 Utilities Webcall Laurie Dennard– BT Group Martin Wade – BT Design Bill Du Cann – Consult21 December 10th, 2007 Issue 1.0.
Advertisements

11 Simultaneous Provide. 22 Disclaimer: The information contained in this Presentation slide-pack is confidential information for discussion purposes.
1G MSIL SFOA1 Trial Update Week Ending: 04 April 2008.
Ofcom Consumer Switching
Project management Topic 3 Directing a project. Overview of processes Authorise Initiation Authorisation for Initiation Stage Authorise the Project Contract.
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
Geoff Hammond Head of Revenue Assurance. Agenda Revenue Assurance & CRAB Focus PPC Circuit Validation PPC Radial Distance Validation Questions.
Always consult the current Carrier Price List. Examples based on 10 March 2010 Price List Uncontrolled when downloaded
STANDARD CONTRACT FORUM MONDAY 13 TH DECEMBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
This update is a BT perspective of Working Group status including input from the Co-Chair call of 7 th September Nigel Scott 13 th Sept 05 Consult21 -
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
PPC Industry Forum, 06 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum, 1 st March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
21C Customer Experience (CE) Programme Web call 6th December :00 to 11:00 Welcome.
June 2014 Performance Report RM Education Stoke BSF and Stoke CIS.
Geoff Hammond Head of Revenue Assurance. Agenda Interconnect – CRAB the start Current Wholesale Revenue Assurance Focus PPC current position PPC Radial.
PPC Industry Forum, 4 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Texas Nodal 1 Nodal Telemetry Outreach and Recent Changes to Focused Input Testing (FIT) NATF Sep 29, 2009 Stacy Bridges, ERCOT.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
BT Wholesale HARD TURN BACK When shouldn’t I call or request an escalation? There are several occasions when BT Wholesale receive requests on the phone/via.
STANDARD CONTRACT FORUM THURSDAY 28 TH OCTOBER 2004 AT CUSTOMER SUITE, BT CENTRE 81 NEWGATE STREET LONDON EC1A 7AJ KEITH MITCHINSON.
PPC Industry Forum, 5 March Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Standard Contract Forum 26 March am Customer Suite, BT Centre, London.
PPC Industry Forum, 7 June Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Forum 16 September Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
Interconnect Product Forum 21 st October STANDARD CONTRACT FORUM SESSION 21 October 2009 Keith Mitchinson.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
21C Customer Experience (CE) Programme Progress update and next steps - web call 14th March :00 to 13:00 Caroline Watson Head of 21C Customer Experience.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
2 nd December 2014 Agenda item 7a High Needs Funding Pressures/Overview Development of the RAS Alison Shipley Bob Seaman Schools Forum.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
PPC Industry Meeting 8 th September Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
CPS LOCAL EXCHANGE CALLS BT WHOLESALE UPDATE 2 SEPTEMBER 2004 TIM HOWSON PRODUCT DEVELOPMENT MANAGER The information in this presentation.
Pathfinder Working Group BT Centre Showcase, Registration: 9.45 am Start time: am.
PPC Industry Forum, 03 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
PPC Industry Meeting 24 th February Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care.
STANDARD CONTRACT FORUM SESSION 2 February 2010 Keith Mitchinson.
11 User Pays User Committee 10th August Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
Consult21 PC/PPC WG update John Lee, Energis Industry Co-chair 16 May 2005.
1G and 10G MSIL SFOA1 Trial Updates Week Ending: 13 June 2008 Beatrice Osborn Product Development, BT Design.
Finance Department Environmental Services City of Superior Superior Water Light & Power Wastewater Billing.
The Work Programme Tuesday 7th September 2010
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
POC Procedures Working Group (POC-pWG)
PROGRAM CONSULTATIVE FORUM Meeting pack
Entrepreneurial Universities Initiative:
Domestic Abuse Market Place Event
Harmonisation Working Group
Key Value Indicators (KVIs) ‘Accepted’ Version 1.0
Principal Contractor Licensing Scheme Standard
Procurement Management Information System (PMIS)
Harmonisation Working Group
Key Value Indicators (KVIs) Version 1.1 (amendments from V1.0 in red)
Key Value Indicators (KVIs) Version 2.2 For Approval at CoMC
For Implementation 1st April 2019
Gas Customer Forum DN Interruption Update - Introduction
Key Value Indicators (KVIs) Version 3.0
DSC ChMC CSS update 09th January 2019
Transmission Workstream DN Interruption Update - Introduction
Presentation transcript:

PPC Industry Forum 2 December 2010

Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information contained in the following slides was accurate at time of publication. Any price indications or timescales contained within this presentation are estimates for information purposes only and do not constitute any contractual or other obligation. In relation to any products/services referred to in this presentation which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available BT reserves the right to make changes to the information in this presentation at any time without further notice Exclusive reliance on the information in this slide pack is at your own risk Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Agenda Introductions – All Review of previous actions– Pauline Cowie Product Development Update– Pauline Cowie 21C Update-Martin Wade Product In Life Update – Jeneva Hibbert QoS Reports Communications/Notifications BCMR / 2010 Contract Review Update AOB – All Forum Review -Pauline Cowie Date of next meeting - All Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Industry Forum Introductions

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Review of Previous Actions (in conjunction with Action List)

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Action Point 04/12 (04/12/08) RFT T2R Initiatives Presentation: Validation Rules CPs to feedback on draft rules.

Managed Bandwidth Services BTW Products and Strategy Action Point 01/03 (05/03/09) Exchanges taken off the Closure List BT to provide update on funding of equipment installed in an exchange badged for closure, that is subsequently postponed Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 05/06 (04/06/09) Provisioning Stats – Working Day Measures BT to provide further information regarding the WCR enhancement to show PPC stats in working days instead of calendar days Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 04/09 (17/09/09) B End Shift Price BT to socialise proposed B-End shift prices Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 01/12 (03/12/09) Efficient Use of Point of Handover (PoH) Equipment BT to investigate and feedback whether post towns can be added to the SNEiD dropdown menu on the Pricing Tool Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 04/12 (03/12/09) Wholesale Customer Reporting (WCR) – Shortfall between WCR & Netview Plus Global Crossing to confirm measures can be accessed from external WCR Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 07/12 (03/12/09) RPC to PPC Conversion SoR Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 03/03 (04/03/10) Highband FOC Trial Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 02/06 (17/06/10) Duplication of Excess Construction Charges (ECCs) BT to arrange tri-party discussion meeting re possible duplication of ECCs Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 03/06 (17/06/10) Early Life Failure (ELF) BT to detail process used for orders provided in incorrect location Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 04/06 (17/06/10) Point of Handover (PoH) Failure CPs require more efficient way in which to report high order failure. Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 01/09 (16/09/10) 21CN Updates CPs were asked to feedback topics for updates Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 02/09 (16/09/10) 155Mbit/s CELA (City and East London Area) Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 03/09 (16/09/10) eCO Repair as principle fault reporting tool Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Action Point 04/09 (16/09/10) Communications/Notifications Requirement for RSS feed to notify changes to PPC website. Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits 21CN Update Martin Wade BT Innovate & Design

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits 21C VC4 FOA – Dec 2010 Update BT to deliver trial network, OSS and DCN updates and configure initial connectivity -All three FOA sites installed, commissioned and in Comms (Edinburgh Capital, Edinburgh Donaldson and Inverness) -The power issue at E/Cap has been resolved by requesting and receiving a ‘ concession’ from the power policy authority to use a temporary power feed, with a longer term permanent solution expected in 12 weeks. -Stability testing has started but a number of installation issues have been identified that need rectifying before test results can be captured (issues with synchronisation configuration, and management) -Stability and performance testing cannot be completed until these issues are rectified BT to share results with industry - Date tbc - awaiting conformation of revised plan from FOA manager

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Product Development Update

Managed Bandwidth Services BTW Products and Strategy PPC Development – Road Map Q3/ 11/12 Q1 11/12 Q2 11/12 Q1 12/13 Q3 10/11Q4 10/11 Q4/ 11/12 BCMR Nodal Aggregation Phase 3 Adjustment Notification B End Shift Charge PPC Price Control RPI - X PPC T2R Driving up use of eCO Repair Highband FOC Improvement Trial PPC Contract Review RPC to PPC Conversion - SoR 11249

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Product In-Life Update QoS Reports Communications & Notifications 2Mbit/s Bearer Audit

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits QoS Reports

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision Stats Family (31May10) (30Jun10) (31Jul10) (31Aug10) (30Sep10) (31Oct10) (30Nov10) PARTIAL PRIVATE CIRCUITS % Success Successes Volume % Failure Failures Late Highband Products & Services % Success 100 Successes Volume % Failure Failures Late Narrowband Products & Services % Success Successes Volume % Failure Failures Late Wideband Products & Services % Success Successes Volume % Failure Failures Late

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision– Early Life Failures (ELF) Family (31May10) (30Jun10) (31Jul10) (31Aug10) (30Sep10) (31Oct10) (30Nov10) PARTIAL PRIVATE CIRCUITS % Success Volume OTD ELFs Late With ELFs Late Without ELFs Highband Products & Services % Success 100 Volume OTD ELFs Late With ELFs Late Without ELFs Narrowband Products & Services % Success Volume OTD ELFs Late With ELFs Late Without ELFs Wideband Products & Services % Success Volume OTD ELFs Late With ELFs Late Without ELFs

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision to Customer Required by Date (CRD) Family (31May10) (30Jun10) (31Jul10) (31Aug10) (30Sep10) (31Oct10) (30Nov10) PARTIAL PRIVATE CIRCUITS % Success Failures Volume Highband Products & Services % Success Failures Volume Narrowband Products & Services % Success Failures Volume Wideband Products & Services % Success Failures Volume

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision – Mean Time to Provide Family (31May10) (30Jun10) (31Jul10) (31Aug10) (30Sep10) (31Oct10) (30Nov10) PARTIAL PRIVATE CIRCUITS Average Days (Calendar) Total Days(Calendar) 32,71136,17032,20030,38940,50041,65448,190 Volume Highband Products & Services Average Days (Calendar) Total Days(Calendar) 6581, ,0161,5131,231 Volume Narrowband Products & Services Average Days (Calendar) Total Days(Calendar) 1,3351, ,5201,6721,720 Volume Wideband Products & Services Average Days (Calendar) Total Days(Calendar) 30,71833,94130,75529,06437,96438,46945,239 Volume

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Provision Stats - Chart

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Repair Stats (31May10) (30Jun10) (31Jul10) (31Aug10) (30Sep10) (31Oct10) (30Nov10) PARTIAL PRIVATE CIRCUITS % Success Successes2,0392,4532,4342,0812,0892,3702,193 Volume2,3282,9582,8042,4192,4492,8622,574 Failures Late Highband Products & Services % Success Successes Volume Failures Late Narrowband Products & Services % Success Successes Volume Failures Late Wideband Products & Services % Success Successes1,6742,0542,0531,6611,6411,8041,660 Volume1,9012,4402,3401,9291,9042,1731,965 Failures Late

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Repair – Repeat Faults (31May10 ) (30Jun10 ) (31Jul10) (31Aug10) (30Sep10) (31Oct10) (30Nov10 ) PARTIAL PRIVATE CIRCUITS Volume2,3282,9582,8042,4192,4492,8622,574 OTR with Repeats Late With Repeats Late Without Repeats Highband Poducts & Services Volume OTR with Repeats Late With Repeats Late Without Repeats Narrowband Products & Services Volume OTR with Repeats Late With Repeats Late Without Repeats Wideband Product & Servicdes Volume1,9012,4402,3401,9291,9042,1731,965 OTR with Repeats Late With Repeats Late Without Repeats

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits – Mean Time to Repair Family (31May10) (30Jun10) (31Jul10) (31Aug10) (30Sep10) (31Oct10) (30Nov10) PARTIAL PRIVATE CIRCUITS Average Repair Time(hh: mm) 03:0903:4102:4203:1502:5603:2803:46 Total Time (Days) Volume2,3282,9582,8042,4192,4492,8622,574 Highband Products & Services Average Repair Time(hh: mm) 04:4601:4602:3001:5002:1103:2703:53 Total Time (Days) Volume Narrowband Products & Services Average Repair Time(hh: mm) 03:4404:0602:4803:1503:1702:5703:11 Total Time (Days) Volume Wideband Products & Services Average Repair Time(hh: mm) 02:5903:3902:4103:1702:5103:3703:56 Total Time (Days) Volume1,9012,4402,3401,9291,9042,1731,965

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits –Repair Stats - Chart

Managed Bandwidth Services BTW Products and Strategy Communications: Published External Briefings 012/10PPC Reduced Lead-Times 014/10Cessation of 2Mbit/s PPC circuits in a 4x2Mbits Pricing Package eCO Repair Enhancements briefing - via the eCO Repair Helpdesk Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits Pricing Notifications New prices notified 1 October 2010 and becomes effective 1 January 2011

Managed Bandwidth Services BTW Products and Strategy BCMR Update BCMR calculations completed. Billing teams are liaising with CPs on an individual basis 2010 PPC Contract Review First discussions meeting held 25 th November BT to provide discussions output by 10 th December 2010 Partial Private Circuits

Managed Bandwidth Services BTW Products and Strategy Partial Private Circuits A.O.B.

Managed Bandwidth Services BTW Products and Strategy Forum Review Next Meeting Scheduled Proposed Date: 3 March 2011 Venue: TBC Partial Private Circuits