Water Management in Commercial Window Systems Ritz-Carlton Hotel St. Louis, MO.

Slides:



Advertisements
Similar presentations
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Advertisements

CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Page 1 September 2009 © Siemens Building Technologies, Inc The Pathways to Sustainability For Our Nations Schools Nichelle Grant, LEED ® AP Siemens.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Congress for the New Urbanism is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned.
The Building Skin: SPAIGR
Do Now: 1. Update your CAD II Notebooks 2. Answer the following on the Do Now Slide of your Notebooks: Based on what you know about materials used to create.
Life-Cycle Cost Analysis for Municipal Interlocking Concrete Pavements ICPI Presentation #013.
WALTER SCARBOROUGH CSI CCS CCCA SCIP AIA D+D Specifiers Series Sponsored by Air Barriers.
The Benefits and design of Rain Screen Wall Systems
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Guide Specifications for Interlocking Concrete Pavement This program is registered with the AIA/CES for continuing education professional education. As.
Post Occupancy Evaluation Sustainability and Energy R+B – SHW Group Using POE’s to inform design and improve building performance.
Presenter’s Name Title Company Session Title Here Insert Company Logo.
AIA Continuing Education 1.5 CEU (SD & HSW). The Masonry Institute of Washington is a Registered Provider with The American Institute of Architects Continuing.
AIA Iowa Complying with the 2014 FGI Acoustical Guidelines #A203 Jon W. Mooney PE September 26, 2014.
ASLA 2014 Annual Meeting and EXPO Session Title Here Presenters Presenter Name, ASLA, Firm name.
Permeable Interlocking Concrete Pavement: A Low Impact Development Tool - Training for Municipal Officials ICPI Presentation #010.
Chapter 4: Air Leakage Control: Materials and Techniques
Northwest Region CSI S508 Code Part 2 Seminar 1A Stephen Winstead, AIA.
The Pattern Language of Concrete Pavers ICPI Presentation #005.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
“Insert Company Name” is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Image courtesy of: Ryder Architecture Limited Building Information Modeling Families and Parameters Slides are made based on Autodesk BIM Curriculum, Greenwold,
Northwest Region CSI S508 Business Introductions 14E093CLAPE Christine Richards May 9, 2014.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
XXXX15 – Your Program Number can be found at:
“[Provider Name] has met the standards and requirements of the Registered Continuing Education Program. Credit earned on completion of this program will.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Construction Joints Head of Wall Deflection Systems An AIA Continuing Education Program Credit for this course is 1 AIA/CES Learning Unit for HSW credit.
RECESSION-PROOFING YOUR BUSINESS: Exponential Growth in Difficult Times Brad Dawson, LTV Dynamics.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Presenter’s Name Title Company Session Title Here Optional: Insert Company Logo.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
AIA Iowa #A203 Communicating: Clearing the Path for Emerging Professionals #1 Erica Fischer and AIA Iowa Emerging Professionals 9/25/2014.
2016 Winter Conference Orlando, Florida John Doe, Credentials Company Name Office Number (if you want) Cell Number (if you want) Overall.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Provider Number: A090 Course Title Course Number Speaker Name/s Date.
The Construction Specifications Institute Session 3 DESIGN Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course.
The Boston Society of Architects is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion.
CEFPI is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this.
Upon completion of this module, you will be able to:
F-118 June 29, 2016 Association for Learning Environments
Wood Frame Systems Civil Engineering and Architecture®
F-118 June 28, 2016 Association for Learning Environments
Presenter Company Logo
Presenter Name, ASLA, Firm name
Exponation AIA Provider Number: Session Title Session Number
Exponation Session Title Speaker AIA Provider Number:
Arch205 building construction wall systems
F-118 May 16, 2018 Association for Learning Environments
Exponation Session Title Speaker Date AIA Provider Number:
Exponation Session Title Speaker AIA Provider Number:
Curtain walls Lightweight wall system installed in the exterior of building structures The name “curtain wall” derives from the idea that the wall is thin.
Exponation Session Title Speaker AIA Provider Number:
Session Title Here Presenter’s Name Title Company
Session Title Here Presenter’s Name Title Company
Exponation AIA Provider Number: Session Title Session Number
Building Energy Efficiency & Indoor Environmental Quality
Exponation Session Title Speaker AIA Provider Number:
“[Provider Name] has met the standards and requirements of the Registered Continuing Education Program. Credit earned on completion of this program will.
“[Provider Name] has met the standards and requirements of the Registered Continuing Education Program. Credit earned on completion of this program will.
is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program.
Presentation transcript:

Water Management in Commercial Window Systems Ritz-Carlton Hotel St. Louis, MO

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Thank you!

Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited. © 2007 Pella Corporation 102 Main Street Pella, Iowa 50219

Course Learning Objectives At the end of this course you will be able to: Discuss the ways water penetrates a building envelope. Explain the basic concepts of water leakage. Describe good practices for preventing water leakage. Explain how the basic principles of protecting walls against water leakage also apply to windows. Describe how various wall types – punched, ribbon and window walls – can be detailed to minimize water leakage. Discuss various strategies for ensuring that specified performance is achieved.

Water Management in Commercial Window Systems Module 1 Why talk about this? How does water penetrate the building envelope? Ritz-Carlton Hotel St. Louis, MO

Why talk about this? DPIC Study –3700 claims –Top reasons for lawsuits against architects Roof problems (10%) Wall problems (9%) HVAC (7%) Floors (6%) Source: Architectural Record, August 2000 Percentage of Lawsuits due to Building Envelope Failure

Purposes of Installation Systems What purposes should a window installation system fulfill? Purvine Hall Oregon Institute of Technology

Purposes of Installation Systems Secure attachment Limit air & water infiltration Limit structural deflection Allow for expansion & contraction Purvine Hall Oregon Institute of Technology

Principles of Water Leakage What three conditions must exist simultaneously in order for walls to leak? Speculative Office Building Chicago, IL

Principles of Water Leakage Rain water is on the wall Openings exist thru which water can pass Forces are present to drive or draw the water inward Outdoor Test Facility South Florida

Preventing Water Leakage What are some design principles you use to minimize water leakage in the buildings you design? Buckner Wellness Center Marshall, MO

Preventing Water Leakage Barrier wall –thin wall system –relies on a perfect seal –intended performance is seldom obtained –seal affected by man & nature –reliance on single seal major cause of water leakage

Preventing Water Leakage Cavity wall –exterior wall & back-up wall –2 lines of defense against water infiltration –interior seal protected from the elements –eliminate pressure differential

Preventing Water Leakage Rain Screen Principle –Goal is to eliminate pressure differential –Essential elements exterior rain screen interior barrier which prevents passage of air & vapor, protected from water confined air space, open to outdoors, drained to outside Air Space Air/Vapor Seal Rain Screen

Preventing Water Leakage Examples of Rain Screen principle in practice –Brick cavity wall –Aluminum curtain wall –Casement design Casement Rain Screen Air Space Air / Vapor Seal