TENDERING PROCEDURE IT- 3927/EN

Slides:



Advertisements
Similar presentations
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Advertisements

Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Tender Adjudication and Contract Monitoring. Introduction IMPORTANT Each tender is unique. Please ensure to read the tender document carefully.
Support and Inclusion of students with disabilities at higher education institutions in Montenegro – Procedure for collecting valid documentations.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Co-funded by the European Community eContentplus programme WP1 – Project Management Reporting and financial issues Milva Carbonaro GISIG.
Consolidated Equipment Financing Program (CEFP) Department of Financial Services Bureau of Accounting.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
1 Bid evaluation - Works  Clarification of bids ( if necessary)  Determination of responsiveness “Substantial” responsiveness No material deviations.
REPLACEMENT AND MAINTENANCE OF LIFTS GIVING ACCESS TO LHC UNDERGROUND AREAS TENDERING PROCEDURE IT-4056/EN 105 December 2014 Floris Bonthond.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
1 Addendum Fall 2006 Limited-Term RFP Detailed Instructions for Bidder Registration and Proposal Submission ENTERGY SERVICES, INC. September 11, 2006.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3972/EN PROVISION OF MAINTENANCE SERVICES ON INDUSTRIAL TRUCKS ON THE CERN SITE Insert.
Invitation To Tender Procedure IT – 4005/en Provision of engineering studies and drawings, the supply and installation of piping and its accessories.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4123/EN Supply, Replacement and Repair of Crane Rails.
United Nations Procurement Division
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4103/EN/LHCb Design, Supply, Installation and Commissioning of an HVAC system, a Smoke.
Doing business with CERN Anders Unnervik 3 November 2014.
Purchasing Supplies at CERN
Financial Management MW-Sonet 16 th – 19 th of March 2011, Turkey.
DG DEVCO, Unit B.6 Brussels, November Outline 1.Useful links 2.General conditions 3.General issues 2.
DG DEVCO, Unit B.6 Brussels, April Outline 1.Useful links 2.General conditions 3.General issues 2.
Financial reporting Linda Wormö, MA Per Dahlström, MA 1st October,2015 Kuopio, Finland.
Supplier Engagement & Tender Compliance. Procurement Officers: Paul Norman Julie Jones.
1 Instructions to bidders  Eligibility  Procedure for clarifications  Bid preparation - form  Number of copies, addressee  Language  Pricing and.
DESIGN, SUPPLY, INSTALLATION AND COMMISSIONING OF HEATING, VENTILATION AND AIR-CONDITIONING (HVAC) SYSTEMS FOR THE PS ACCELERATOR INFRASTRUCTURE TENDERING.
Office of Procurement Services.  Vendor Application Website: 
Reporting requirements - contractual and financial issues NGO Kick-off meeting Lorenzina Bruno, Senior Financial Officer Manuel Montero Ramírez, Project.
Technical Assistance Office 1 SOCRATES - MINERVA GRANT AGREEMENT 2004 Contractual and Financial Management Administrative and Financial Handbook.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4134/EN/LHC Supply and Commissioning of HVAC Systems for Five LHC Surface Buildings B.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4082/EN Design, Supply, Installation and Commissioning of the ventilation of the BAF3.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 3976/EN PROVISION OF SPECIALIZED EOT CRANE MAINTENANCE SERVICES ON THE CERN SITE Insert.
Doing business with CERN Anders Unnervik 20 May 2014.
Purchasing supplies at CERN Procurement Rules Someone FP-PI.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
Interim report I The Northern Beauty Barents visual arts in
Dallas Area Rapid Transit Pre-Bid Conference Event #B Purchase and Install 5 Generators February 25, 2016.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4154/EN Supply Centrifugal Water Pumps B. Jenssen
2016/06/211 Provision of Civil Works at Simmerpan Substation PS(PDP)2015/FM/15 Date : 10 July 2015.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
EuropeAid/152087/DD/ACT/LB Cultural activities 2016 Information Session 13 th June 2016.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
CERN Procurement Procedures Rome, 28 th June 2016 Adam Horridge.
2016 Floris Bonthond 31 May Agenda – Procurement at CERN 2 What does CERN buy? Procurement budget Industrial Return and Return Coefficients.
Agenda Procurement organization and budget What does CERN buy?
Doing business with CERN Anders Unnervik
Chisinau, Republic of Moldova 2017
Tender Evaluation and Award Process
Content of Tender Dossier - Instructions to Tenderers - Tenders
INVITATION TO TENDER PROCEDURE IT-4344/EP Design, Supply, Installation, Testing and Commissioning of a Cleanroom extension for the integration of ATLAS.
Purchasing supplies at CERN
Content of Tender Dossier Instructions to Tenderers
Invitation To Tender Procedure
Invitation To Tender Procedure IT – 4327/SMB Technical specification for the civil Engineering works for the construction of the new building.
IT-4130/EN Bidders conference
Cooperation between CERN and Ukrainian Industries 2017
Purchase Contract Radka Chlebcova.
TENDERING PROCEDURE IT-3981/EN
ALIGNMENT RULE PROCEDURE
IT-4328/EN Bidders conference
Fasset Briefing Session
ALIGNMENT RULE PROCEDURE
United Nations Procurement Division
Financial and Administrative presentation on PARTICULATES project
IT-4464/EN Bidders conference
Presentation transcript:

TENDERING PROCEDURE IT- 3927/EN Revamping and replacement of obsolete Electrical Overhead Travelling (EOT) cranes and supply of new EOT cranes 23 Avril 2013 Floris Bonthond

CONTACT FOR INFORMATION Floris Bonthond Tel: +41 22 767 31 43 Fax: +41 22 766 80 05 E-mail: Floris.Bonthond@cern.ch 23 Avril 2013 Floris Bonthond

(Please refer to email received for more info and URL). DOCUMENTATION Tender Form Technical Specification and its annexes Selection and Adjudication Criteria for Supply Contracts General Conditions for Invitations to Tender CERN/FC/5312-I General Conditions of CERN Contracts CERN/FC/5312-II Working on the CERN Site (Please refer to email received for more info and URL). 23 Avril 2013 Floris Bonthond

Contract negotiation and notification Start of contract TENDERING PROCEDURE Bids to be uploaded (1) on the CERN e-tendering application at the following URL:http://cds.cern.ch/record/1540154 not later than: 08 May 2013 – 4:00 pm (expressed in Europe/Zurich time zone). Please take into account the uploading time. Bid evaluation Contract negotiation and notification Start of contract (1) Unless explicitly stated otherwise by CERN, bids shall, in no event, be sent by post, e-mail or fax. CERN will only accept bids that have been submitted via its e-tendering application. 23 Avril 2013 Floris Bonthond

The contract shall be awarded on a BASIS OF AWARD Adjudication basis: The contract shall be awarded on a « lowest technically compliant » basis to the bidder whose bid complies with all the technical, financial and delivery requirements and is the lowest*. * Subject to the Rules aiming at achieving a well balanced industrial return coefficient for Member States (MS). 23 Avril 2013 Floris Bonthond

Selection and adjudication criteria Improve the distribution of our purchases among CERN Member States Country of origin: In accordance with standards defined by EU i.e. the country(ies) where the supplies (including their components and sub-assemblies) are manufactured or undergo the last major transformation by the contractor or his sub-contractors. The return coefficient of a Member State is defined as the ratio between that Member State's percentage share of the value of all Supply Contracts and that Member State's percentage contribution to the CERN Budget over the same period. Well balanced Member States for 2013: CH – CZ – FR –PT. The tender shall be treated as that from a poorly balanced (PB) MS provided that the value of the supplies originating in one or more PB MS is not less than 51% of the total amount of the contract. 23 Avril 2013 Floris Bonthond

The alignment rule (1) Lowest Bid from a PB MS  contract Contract Case 1 Case 2 Case 2a Case 2b Case 2c Contract 23 Avril 2013 Floris Bonthond

The alignment rule (2) Lowest Bid from a WB MS negotiations if difference < 20% Case 1 Case 2 Case 2a Case 2b Case 2c Contract 23 Avril 2013 Floris Bonthond

The alignment rule (3) Contract Case 2a: 1st bidder from PB MS aligns  contract Case 1 Case 2 Case 2a Case 2b Case 2c Contract 23 Avril 2013 Floris Bonthond

The alignment rule (4) Contract Case 2b, if not  2nd lowest bidder from PB MS aligns  contract Case 1 Case 2 Case 2a Case 2b Case 2c Contract 23 Avril 2013 Floris Bonthond

The alignment rule (5) Contract Case 2c, if not alignment  contract placed with the lowest bidder from WB MS Case 1 Case 2 Case 2a Case 2b Case 2c Contract 23 Avril 2013 Floris Bonthond

PRICE BASIS All prices shall be quoted either in CHF or the national currency of the bidder or the currency in which the bidder has major expenses (to be indicated in the Tender Form), not subject to revision until 31 October 2016. They shall take into account CERN’s exoneration from VAT and import duties. The adjudication shall be based on the Free Carrier (FCA) Incoterms 2010 conditions. 23 Avril 2013 Floris Bonthond

TENDER FORM Please fill in all the positions of the table in Art. 3 of the Tender Form and make sure that all that is requested is included in the given prices. Please make sure that all the documents that are requested in section 17 of the Tender Form (Documents to be attached to the bid) are included. CERN reserves the right to disqualify any bidder who does not supply all the requested documents. 23 Avril 2013 Floris Bonthond

VAT VAT shall be subject to the rules and invoicing instructions as defined under the following links: http://cern.ch/doc/vat.html OR http://cern.ch/doc/tva.html 23 Avril 2013 Floris Bonthond

PAYMENT CONDITIONS The payment of any invoice shall be subject to the provision by the contractor of a bank guarantee issued by a bank approved by CERN (rating of BBB+ at least) at the start of the contract: 10% of total estimated amount of contract and valid until expiry of warranty period, i.e, two years after acceptance of last batch of supply delivered under the contract; See template in annex 1 of our General Conditions. Payments: 10% of the total amount of the release order after acknowledgement; 20% of the total amount of the release order following approval of the Detailed design by CERN; 30% of the total amount of the release order following successful factory acceptance tests and supply of the test report; 40% of the total amount of the release order following successful acceptance tests of the supply and completion of training. 23 Avril 2013 Floris Bonthond

DESIGN STUDY Within 6 weeks after notification of the release order for the project concerned, the contractor shall submit to CERN the Detailed design documents for approval. CERN shall carry out a detailed verification of the proposed design and give its approval or refusal in writing within two weeks. In case the study is refused by CERN, the contractor shall forthwith and at his own expense take such remedial measures as may be required to submit a satisfactory study within two weeks of CERN’s request. If the contractor fails to take the requested remedial actions according to CERN’s request, CERN may terminate the contract in whole or in part with immediate effect in accordance with Articles 28 and 30 of the General Conditions of CERN Contracts. In any case, component ordering and equipment manufacture shall not start without CERN’s written prior approval of the design study. Factory acceptance test and Final acceptance also subject to the same constraints. 23 Avril 2013 Floris Bonthond

SPECIFIC COMMERCIAL ISSUES DELIVERY SCHEDULE: Art. 6 of Technical Specification and Art. 8 of Tender Form. PENALTIES: Art. 11 – Tender Form: 1% of the amount of the release order concerned (cumulative total penalty limited to 5 %) for each complete week of delay of the contractual delivery date stipulated for each milestone. Corrective maintenance: 2000 CHF for each hour of delay of the contractual intervention date stipulated in Art. 10 of the Tender Form. WARRANTY: two years (Art. 25 of General Conditions of CERN Contracts). COMBINATION OF FIRMS: combined competence and experience shall cover all the specified technical domains of this Invitation to Tender. SUBCONTRACTING is permitted but limited to 30% of the amount of the bid. ALTERNATIVE PROPOSALS: (Art. 14 of General Conditions for IT): alternatives can be proposed but they shall always be in addition to the conforming bid. 23 Avril 2013 Floris Bonthond

CLARIFICATION PROCESS All requests for clarification shall exclusively be addressed by email to Floris Bonthond. CERN will answer all the requests for clarification received earlier than 7 calendar days prior to the deadline for the submission of the bids (08.05.2013). CERN’s answers will be sent to all bidders, including the requests for clarification but without identifying the sources. Bidders shall acknowledge receipt of the Q&A document and acknowledge in its bid cover letter each individual CERN clarification correspondence received. 23 Avril 2013 Floris Bonthond

THANK YOU FOR YOUR ATTENTION 23 Avril 2013 Floris Bonthond