Data Link Communications

Slides:



Advertisements
Similar presentations
FANS (Future Air Navigation System) Flight Crew Procedures
Advertisements

Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 13th MEETING OF WORKING.
International Civil Aviation Organization
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Data Communications Program
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Federal Aviation Administration Data Communications Program DCIT Update MEM ATCT DCL Trials To:DCIT Plenary From: Matt Maki Date:
Controller-Pilot Data Link Communications Build I & Build IA Programs ATN 2001 Focus on the Reality of Data Link IEE London, England 19 September 2001.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT #24 En Route Route Clearances Draft Use Case Introduction Boeing –
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #26 Plenary From: Matt Maki / DCL Trials Lead.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
DARP.
Presented to: By: Date: Federal Aviation Administration Transition to RNP 4/10 (MNPS to PBN) OSWG Gordy Rother and Kevin Kelley 10/8/2014 North Atlantic.
Presented to: By: Date: Federal Aviation Administration Gulf of Mexico 50 NM Lateral Separation – RNAV Routes Project Project Overview ATO Oceanic & Offshore.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Departure Clearance Trials (DCL) Test Status DCIT Meeting # 22 Washington,
Federal Aviation Administration Data Communications Implementation Team (DCIT) Trials Activities/DTAP Update Schedule Timelines Matt Maki.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 07/11/12.
12/01/2011 FEDERAL AVIATION ADMINISTRATION AIR TRAFFIC ORGANIZATION 1 Execution of Flow Strategies (XFS) (aka Go Button)
Federal Aviation Administration Data Communications Program DCL Trials DCIT Update MEM ATCT To:DCIT Plenary From: Matt Maki Date:
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
Federal Aviation Administration Data Communications Integration Team (DCIT) DCL Trials test activities Presented to:DCIT # 15 By:Peter Muraca FAA Date:May.
Presented to: DCIT #12 Plenary By: Andy Fry, Thane Inc. Date: January 12, 2012 Federal Aviation Administration Data Communications DCIT Update Flight Deck.
Data Communications Implementation Team (DCIT)
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT23 Update To:DCIT23 Plenary From: Matt Maki Date:
Presented to: DCIT FDWG Breakout Session By: Andy Fry, Thane Inc. Date: July 11, 2012 Federal Aviation Administration Data Communications DCIT #16 Flight.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
Federal Aviation Administration Data Communications Program Departure Clearance (DCL) Trials DCIT17 To:DCIT Plenary From: Matt Maki, Trials Lead Date:
Harris.com Alex Murray | DCIS Benefits Lead DCIT Brief Data Comm Benefits & Metrics Alignment with DC Program, NIWG, & NAC.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To:DCIT25 Plenary From: Matt Maki Date:
BOEING is a trademark of Boeing Management Company. Copyright © 2011 Boeing. All rights reserved. OMWG and All Working Groups DCIT-39 report out 11 March.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Presented to: By: Date: Federal Aviation Administration DCIT 41 Plenary Mark Patterson, FAA, AFS June 2015 Flight Standards Update.
Presented to: By: Date: Federal Aviation Administration DCIT 40 Plenary Mark Patterson, FAA, AFS April 2015 Flight Standards Update.
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCIT En Route Services Survey Results A Review 5/8/2013.
CY Segment 1 Phase 1 Tower Services Initial En Route Services Departure Clearances (DCL) Transfer of Communications Initial Check-In.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT Update To:DCIT Plenary From: Matt Maki Date:
Presented to: DCIT By: Andy Fry, Thane Inc. Date: September 26, 2013 Federal Aviation Administration Data Communications DCIT FDWG Climb Via Discussion.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status / Overview DCIT #27 Plenary From: Matt Maki / DCL Trials Lead.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: AOC WG From: Data Comm Production Sub-Team Date: 08/22/12.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #31 PLENARY DCL Trials.
Federal Aviation Administration AOC/FOC Interface for Data Comm Production System To: DCIT AOC WG From: Data Comm Production Sub-Team Date: 2/1/13.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials Status Updates To:DCIT21 Plenary From: Matt Maki Date:
Federal Aviation Administration Data Communications Implementation Team (DCIT) DCL Trials ”T e s t S t a t u s” Presented to:DCIT, Meeting #18 Presented.
Federal Aviation Administration Data Communications Program MEM/EWR ATCT DCL Trials DCIT24 Update To:DCIT24 Plenary From: Matt Maki Date:
FAA NextGen Data Comm Tower Service: CPDLC DCL New Operator Introduction.
Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications Implementation Team (DCIT) DCIT #32 PLENARY DCL Trials.
COPYRIGHT © 2013 BOEING. ALL RIGHTS RESERVED Identifying potential service enhancements to increase operator participation DCIT May 2013 Brad Cornell.
International Civil Aviation Organization
FAA Data Comm Program Status AERONAUTICAL COMMUNICATIONS PANEL (ACP)
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
Flight Standards Update
Data Comm Departure Clearance End To End Summary: (DCIT #27 WG)
FANS (Future Air Navigation System) Flight Crew Procedures
International Civil Aviation Organization
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
Data Communications Implementation Team (DCIT)
Data Communications Program
Oceanic and International Operations
May 2018 HSAC.
Operational Context and Use Case Focus Group
Presentation transcript:

Data Link Communications AC 120-70C and A056 operational authorization update OSWG Mark Patterson, FAA, AFS-470 18 March 2015

Overview U.S. domestic data comm program update AC 120-70C 8900.A056 Notice and A056 templates Upcoming work

Services Strategy Segment 1 Phase 1 - Tower Service Avionics CY 14 16 18 20 22 24 26 28 30 Segment 1 Phase 1 - Tower Service Departure Clearance IOC Departure Clearances (DCL) IOC FANS 1/A transitioning to ATN Avionics Future Air Navigation System (FANS) Ground System Aeronautical Telecommunications Network (ATN) IOC 3 3 3 3 3

Services Strategy Segment 1 Phase 1 - Tower Service Segment 1 Phase 2 CY 14 16 18 20 22 24 26 28 30 Segment 1 Phase 1 - Tower Service Departure Clearance IOC Departure Clearances (DCL) Segment 1 Phase 2 - En Route Services Initial En Route Services Transfer of Communications Initial Check-In Altitudes / Altimeter Settings Go Button / Airborne Reroutes Pilot Initiated Downlinks Controller Initiated Routes (Limited) Direct-to-Fix (Limited) Crossing Restrictions (Limited) Advisory Messages (Limited) Holding Instructions (Limited) Speed and Headings Beacon Codes Stuck Microphone Tailored Arrivals (Limited) Data Comm Routine Communications IOC TFM Data Comm Reroutes Data Comm Routine Communications Follow- On En Route Services Tailored Arrivals FANS 1/A over VDL-2 transitioning to ATN Avionics Future Air Navigation System (FANS) Ground System Aeronautical Telecommunications Network (ATN) Full tailored arrivals, holding instructions, advisory messages 4D Trajectories D-TAXI Segment 2 - Advanced Services IOC 4 4 4 4 4

U.S. domestic CPDLC-DCL trials - overview Started in 2012 @ KMEM Two locations: KMEM – 40-80 ops / day KEWR – 60 ops / day (~10% of all departures) Participants Part 121: FEDEX, UPS, UAL Part 129: Operators: BAW, SAS (pending CAA approval) FANS 1/A (CPDLC) and not PDC (ACARS) Initial and revised departure clearances Required equipage FANS 1/A (CPDLC) VDL M0/A Continue until 1Q 2016

CPDLC-DCL - waterfall schedule (as of 29 Jan 2015)

Questions?

AC 120-70C – current status Feb ‘14 - briefed AC 120-70B & A056 template revision project AFS-470 / DCIT / PARC CWG collaborated to produce a limited-scope revision: New format (ICAO) and editorial changes Domestic CPDLC DCL and European Link 2000+ added Updates event reporting to reflect GOLD Minor changes to authorization process (roles & responsibilities) Highlight - Part 91 operators will not be required to have operational authorization (A056) for U.S. CPDLC-DCL DCIT – Data Comm Implementation Team PARC CWG – Performance-based Aviation Rulemaking Committee Comm Working Group GOLD – Global Operational Data Link Document CPDLC – Controller Pilot Data Link Communication

AC 120-70C - current Status Posted for public comment on March 17, 2015 30-day comment period Due April 16, 2015 (no time extensions) Comments out-of-scope will be held for next revision Parallel AFS formal coordination began After 30-day window Immediately adjudicate comments AFS-400 approves adjudication To tech writers for publication Review current version of draft AC 120-70C (if desired)

Questions?

A056 templates - current Status Operational Authorization (OpSpec / Mspec / LOA) A056 & Notice Entered into AFS formal coordination on March 17, 2015 Highlights Deleted the requirement for aircraft to be equipped with an approved collision avoidance system that is on and operating Part 91 - references related to data comm operation within the U.S. has been deleted. Operators will not need operational authorization for U.S. domestic CPDLC-DCL Review Notice and draft templates

Part 129 Part 129 will not require a separate A056 CAA approval / authorization will be annotated on A003 Review draft A003 template

Take aways… Do not wait for the revised AC before submitting data link authorization applications. Applications being submitted (or already in approval process) referencing AC 120-70B will still be processed Delaying applications will cause delays in receiving authorization (and inability to participate in DCL ops at IOC) Operators with existing A056 Prepare your training and crew procedure documentation now so you can respond quickly when the Notice is published

Next steps AC 90-[datacomm] project Includes: AC 120-70C incorporated New guidance PBCS FANS / ATN B1 / B2 (as available) Post-implementation monitoring Compliance determination Streamlined application process for Part 91 OpSpec / MSpec / LOA template updates Additional guidance / training material as necessary

Questions?

Back-up slides

U.S. domestic DCL trials - specifics Uses a stand-alone DCL Trials Automation Platform System (DTAP). Processes participating operators initial / revised DCL aircraft clearances independent of the current FAA Terminal Data Link Services (TDLS) system. Interfaces with the Tower ARTCC Host ATM Data Distribution System (HADDS) interface to receive NAS flight data. The ATC Clearance Delivery position hosts a dedicated DTAP DCL display and user interface.

U.S. domestic DCL trials - specifics Participating FANS1A / FANS1A+ equipped aircraft log into the DTAP via CPDLC. Once the link is established, the flight deck requests and receives its initial departure clearance and any revisions to that clearance using CPDLC.

Operator timelines