1 Item 2.7 ECIP 2009-2013 developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008.

Slides:



Advertisements
Similar presentations
Why does ERA Need to Flourish
Advertisements

ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
The White Paper – a policy paper to contribute to the integration process of the WBC in the ERA Dr. Erika Rost, Dr. Andreas Kahle Federal Ministry of Education.
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Transport TEN-T 2012 Calls for Proposals Info Day SESSION 2 MULTIMODAL AND CROSS-CUTTING PRIORITIES AIR TRAFFIC MANAGEMENT Unit Single European Sky - DG.
Single European Sky Conference, Limassol Lufthansa German Airlines October 11, 2012 Page 0 Single European Sky and Performance Scheme from an European.
1 Sub-group on Process Efficiency 1 st meeting, 17 Nov 2008 Frankfurt am Main T2S Project Team European Central Bank.
XV-RA V/Doc. 5.2(2) Expected Result: 11 EFFECTIVE AND EFFICIENT MANAGEMENT PERFORMANCE AND OVERSIGHT OF THE ORGANIZATION Strategic Plan for the Enhancement.
BULATSA 40 Years of Safety in Bulgarias Skies Sofia, 27 February 2009, CNATCC.
Cooperative Network Design EUROCONTROL - New horizons for aviation.
SCG/ May 2008 Item 2.2 – AP01 Deployment of the ATM Master Plan IP1 Dimitris APSOURIS EUROCONTROL DAS/SIS.
1 THE POTENTIALS OF THE ATM STRATEGY FOR YEARS by Val Eggers.
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
European Single Sky ImPlementation ESSIP DEVELOPMENTS Reference: SCG/10/AP05 – Action Paper 05 Christian Coëffé Head of European Single Sky Implementation.
Hans Koolen NMOC/CFMU Network Operations Services
1 Item 2.6 SES Reporting Working Group Reference: Information Paper SCG/8/IP03 Danny DEBALS LCIP Manager SCG/8 – 14/15 th May 2008.
1 Item 4.5 LSSIP Development and SES Reporting Reference: Action Paper SCG/10/AP06 Danny DEBALS LSSIP Manager SCG/10 – 25 February 2009.
Objective AOM 13.1 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Objective FCM01 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
Marc Deboeck ADQ Implementation Workshop 29 May 2013 Directorate Single Sky (SES) Support to CAA-NSA Single Sky Implementation Support to NSAs.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
Traffic and Capacity Performance Summer 2008 Outlook PC/29 – 9 May 2008 Item 3.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
European Organisation for the Safety of Air Navigation ITEM 7 AGENCY BUSINESS PLANNING: Budget Process and Functional Budget Presented by the SCF Chairman.
1 New Governance Arrangements Presented by the Director General European Organisation for the Safety of Air Navigation Provisional Council Agenda item.
U.S. Route 30 Environmental Impact Statement & Phase I Design Report Community Advisory Group Meeting Thursday May 8, 2008.
3/2/ STANLEY LIGAS, et al. v. JULIE HAMOS, et al. First Annual Report of the Monitor September 27, 2012 Tony Records, Monitor
Presentation of the proposed Annex 19 – Safety Management
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
1 FAB CE Feasibility Study Operations FAB CE Stakeholders Workshop March 5 th 2008, Prague.
Mission Trajectory Step 1 From planning to deployment.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Making a Financial Case: The Loughborough Context ILM Level 5
Single European Sky 1 CAeM Technical Conference Single European Sky and the Impacts for Aeronautical Met Services Geneva 21 November 2006.
AVIMET Meeting topics EUMETNET: The Network of European Meteorological Services.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
ATM Master Plan Implementation Package 1 (IP1) CNS ATM Steering Group, UK CAA, 10.Feb /04/2017 EUROPEAN COMMISSION.
European ATM Stakeholder Forum. Discussion Topics Single Sky Committee SESAME SES Implementation Eurocontrol Activities Next Meeting Single Sky Committee.
Future Challenges in Aviation Psychology
Episode 3 Operational Concept Detailing Episode 3 - CAATS II Final Dissemination Event Ros Eveleigh & Eliana Haugg EUROCONTROL & DFS Episode 3 Brussels,
Electronic Customs Coordination Group Item 16 Reporting from the PG analysing the implementation feasibility of Obj 1&2 of the RM Strategy Brussels,
Objective AOM 19 ESSIP Plan 2014 Agnieszka DYBOWSKA DPS/PEPR
Updated e-IRG recommendations Motivation and status.
SESAR Single European Sky Air traffic management Research
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
The global voice of ATM The Global Voice of ATM CANSO AIM WG Activities Agenda Item - 5: Global strategy/roadmap ICAO AIS-AIM SG3, Montreal, November.
SSAP The European Strategic Safety Action Plan (SSAP) The History & Rationale.
© EUROCONTROL European Air Traffic Management Programme The European ATM Master Plan ASAS TN Dave Young, Business Dev. Manager, EEC.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
ICAO Workshop on Training Standards and Guidelines MOSCOW September UNIT TRAINING Harmonisation of Unit Training Plans Michel Pistre.
MAK – EUROCONTROL WORKSHOP Moscow 1 -2 July 2004 Kenneth Eideberg Stakeholder Implementation Service EUROCONTROL European Organisation for the Safety of.
Eurostat Sharing data validation services Item 5.1 of the agenda.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
CEATS Central European Air Traffic Services
COLLABORATIVE DECISION MAKING CONFERENCE
Presented by United Arab Emirates
History and Status Tallinn, 18 May 2005 Leo Huberts
Eighth UK European ATM Stakeholders Forum 24th April 2006
WMO IT Security Incident Process
Documentation Overview
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
PROGRESS & CHALLENGES ATCOS’ VIEWS
RAD Evolution Workshop Outcome
Water Directors meeting Warsaw, 8-9 December 2011
Water Directors meeting Spa, 2-3 December 2010
Presentation transcript:

1 Item 2.7 ECIP developments Reference: Action Paper SCG/8/AP05 Flimsy SCG/8/FL06 Christian Coëffé ECIP Manager SCG/8 14 & 15 May 2008

2 PC SCG Teams & PSGs ECIP Approval process strategic input Final approval ATM Strategic Orientations Endorsement of ECIP amendments Proposed list of ECIP amendments Final list of ECIP amendments ECIP Strategic developments Approval of final list of ECIP amendments Analysis of proposed ECIP amendments SCG/8 (May 2008)

3 ECIP amendments for Reference remains the proposal made at the SCG/7 meeting, with the exception of : 8.33 kHz channel spacing below FL 195 COM10 Tentative objective is not accepted COMd2 Under development is introduced Common ATS provision in the Upper Airspace of the Central European (CEATS) States FAC01 objective is removed from ECIP A new FAB-related objective is expected for the next cycle Centralised SSR Code Assignment & Management System (CCAMS) To be discussed under agenda item 4.4 A number of extensions of applicability areas confirmed by Stakeholders A-SMGCS with Antalya / Turkey Airport collaborative decision making with Roma-Fumicino / Italy European air traffic controller licence requirements & enhanced training of ATCOs with Belgium ATS-Qsig digital signalling for ground telephone applications with Denmark

4 A first analysis led to a list of 10 SESAR OI/TI steps considered mature enough for integration into the ECIP process (see Annex 3 of Action Paper SCG/8/AP01) A more in depth analysis reduced the initial list to 3 SESAR OI/TI steps (see Flimsy SCG/8/xxxx) Both Airspace-related and Environment-related ECIP opportunities still need detailed technical discussions through normal working arrangements before being proposed for integration into ECIP SESAR-related ECIP headlines for (1/2)

5 Airport CDM extended to regional airports (SESAR OI step DCB-0304) Provide improved estimates of arrivals at regional airports Integrate improved estimates of arrivals at regional airports in ATFCM Interactive network capacity planning (SESAR OI step DCB-0201) Develop interface to exchange capacity (planning) and demand (forecasted) data with Airspace & Demand Data Repository (ADR & DDR) through CFMU portal Harmonised EUROCONTROL ECAC area rules for OAT-IFR and GAT interface (SESAR OI step AOM-0301) Develop specifications for harmonised OAT rules under IFR SESAR-related ECIP headlines for (2/2)

6 ECIP – Next StepsToday SCG agreement on ECIP objectives amendments for SESAR-related ECIP headlines June ECIP Status Report 2007 July PC endorsement for September ATM implementation perspective Detailed objectives description Executive summary

remains a transition year : 2009 should show the renewed ECIP/LCIP process Proposal is to discuss with SCG members in October 2008 : strategic orientations for the next cycle what has already been done to adapt ECIP/LCIP process during the SESAR definition phase what is still to be done for the next cycle Next cycle

8 ECIP Recommendations Members of the SCG are invited to: Agree that the new objectives and significant changes to existing ones set out in Annexes 1 & 2 of SCG/8 Action Paper 05; the SESAR-related ECIP headlines as proposed in the Flimsy SCG/8/FL06 be submitted to the EUROCONTROL Provisional Council by correspondence for their endorsement and subsequent inclusions in the ECIP document