Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.

Slides:



Advertisements
Similar presentations
Step-by-step assembly instructions
Advertisements

Drawing & Painting Final Exam Book-Making Instructions.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
FCAL silicon sensors at INP PAN Cracow Current status Our plans Some remarks FCAL Hardware WGArkadiusz Moszczynski INP PAN Cracow1.
Hybrid Integrated Circuit
Scratch Build a Water Tower
Dayview™ LCD Film – Installation Procedures. Equipment Required : Latex gloves and face mask Glue cleaner (alcohol) & glass cleaner Special glue, spray.
Table of Contents Unit 1- Understand the Problem Unit 2- Gather Information Unit 3- Develop Solutions Unit 4- Implement A Solution Unit 5- Test and Evaluate.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
STC Plant Growth and Development Lesson 3: Planting the Seeds Kennewick School District Permission to use granted. Copyright by Wisconsin Fast Plants,
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
PS Module Gluing Tests USCMS Outer Tracker Workshop Ulrich Heintz, Meenakshi Narain, Bill Patterson, Sinan Sagir, Adam Lanman, Eric Spencer, Juan Trenado,
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Levers & Fluids Rig Step-by-step assembly instructions (c) 2012 Mechanical Kits Ltd.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Conductive glue tests. J.Wickens 12/7/04 Used small pieces of HV kapton cut from redundant (old) stock, glued to silicon test structures from Karlsruhe.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Module mounting possibilities (FDR and module task force proposals) & Module mounting status at Dortmund Daniel Dobos, University of Dortmund
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
Installing a Strain Gage MEEN The content of this presentation is for informational purposes only and is intended only for students attending Louisiana.
Gluing procedure for BGO, fast and slow scintillator Mózsi Bank Kiss & Tomi Ylinen Nov. 23, 2005.
Berkeley status Aug 10th, 2012.
Procedure for MCM rework on tray MID 070
ATLAS pixel module assembly flow
T. Bowcock University of Liverpool
Ladder Assembly All tools and jigs produced Glue dispensing works
Ladder Assembly All tools and jigs produced Glue dispensing works
Gluing jigs for Demonstrator
Phase 2 Outer Tracker Module analysis
Equipment for Assembly – UK Experiences
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Hydraulic Arm Assembly Instructions
Step-by-step assembly instructions
Module/Ladder Assembly
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
Step-by-step assembly instructions
Presentation transcript:

Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara

Slide 2Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Wirebonds will be added to the back of all TEC and TOB modules to add redundancy to the bias connection On TOB modules a bondable tab needs to be added to the module frame New modules Existing modules are retrofitted (~2600 modules) TEC modules already have a gold plated area on the module frame, where wirebonds can be placed All bias bonds get encapsulated to protect them from damage during handling

Slide 3Susanne KyreTracker week, October 2005 New TOB modules Two small tabs (gold plated kapton) are soldered to the module frame During module assembly the tabs are glued to the back side of the sensor

Slide 4Susanne KyreTracker week, October 2005 Existing TOB modules I For modules that have little or no silver epoxy under the the gold plated hole in the kapton of the module frame, a small tab (gold plated kapton) gets glued with silver epoxy to the gold The tab is also glued to the sensor Most of the 1200 modules at UCSB will be retrofitted using this method

Slide 5Susanne KyreTracker week, October 2005 Existing TOB modules II For modules that have a lot of silver epoxy under the gold plated hole in the kapton of the module frame, a wire is soldered to the resistor on front side of the module The wire gets looped around the edge of the frame to the back side A small tab (gold plated kapton), which has previously been soldered to the wire, gets glued to the sensors straddling the gap between the sensors All 1400 FNAL modules and about 80 UCSB modules will be retrofitted using this method

Slide 6Susanne KyreTracker week, October 2005 Bias wirebonding Height requirement: Maximum encapsulant height must be below the highest point on the module frame Wirebond loop height is kept to 280 microns Encapsulant height is kept below 630 microns After the front side of the module is wirebonded, the module gets removed from the module carrier, turned over and placed on a special vacuum fixture 15 wire bonds are placed on each of the 2 bias bond areas on the backside of the modules

Slide 7Susanne KyreTracker week, October 2005 Bias bond encapsulation For the detailed procedure see: For the drawings of UCSB designed tools see:

Slide 8Susanne KyreTracker week, October 2005 Material and Preparation Sylgard 186 Silicone Elastomer, 2 part kit, 10:1 mixing ratio (manufacturer: Dow- Corning) Mixing cups Mixing sticks Digital bench scale Small vacuum chamber or centrifuge for degassing

Slide 9Susanne KyreTracker week, October 2005 Dispensing Equipment Pneumatic glue dispenser with foot pedal and timed pulse option (manufacturer: EFD model: Ultra 1400) 3ccm syringe barrel and piston (EFD) Smooth-flow tapered tips, gage 20 (EFD)

Slide 10Susanne KyreTracker week, October 2005 Set up Equipment Base plate (UCSB design), to hold the module on a module carrier upside down Plastic trowel (UCSB design), to spread the encapsulant over the wirebonds and to keep the height of the encapsulant below the maximum height Stereo microscope (optional)

Slide 11Susanne KyreTracker week, October 2005 Procedure I Mix encapsulant, degas the mixture and fill syringe Set pneumatic dispenser to 15 psi and 1 second dispense time Set module in carrier upside down onto base plate Dispense a line of encapsulant across the width of the wirebonds

Slide 12Susanne KyreTracker week, October 2005 Procedure II Position the trowel with one leg on the sensor, one leg on the kapton Spread the encapsulant over all 15 wirebonds by sliding the trowel across the bonds Once the trowel is past the wirebonds, lift it up and clean it off with a dry tissue paper

Slide 13Susanne KyreTracker week, October 2005 Procedure III Check that all wirebonds are covered completely with the encapsulant (this can be done with or without a stereo microscope) If necessary apply more silicone and repeat the troweling procedure Cure for 24 hours with the backside of the module facing up to avoid beading up of the encapsulant