Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 2 Slide 1 Systems engineering 2.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 2 Slide 1 Socio-technical Systems.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Barriere O, Le Roux P
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
How to achieve satisfactory performance of the access system: stability, efficiency, operation, fluidity Timo Hakulinen (GS/ASE) Thanks: LHC access team.
TS, Length of YETS EYETS LIU & CONS Project
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
1 User’s perspectives on the management of Elements Important for Safety (EIS) AMMW - CERN Anne Funken, Marc Tavlet / BE-ASR-SU.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
LHC ACCESS SYSTEM 1 Authors: P. Ninin, L. Scibile, T. LadzinskiEDMS: Access Control and Safety System for the LHC Experiments P. Ninin L. Scibile.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
1 1. Some recent views ( ) 2 Linac tunnel
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
LHC ACCESS SYSTEM 1 Authors: P, Ninin, L. Scibile T, Ladzinski EDMS: The LHC Access System Where do we stand ? P. Ninin, T. Ladzinski, L. Scibile,
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
TS Workshop, Archamps 4 May 2004 SAFETY AND ACCESS CONTROL Where do we stand ? P. Ninin & the Access project team TS/CSE,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
EDMS Session 2 - Operation at high intensity of the CERN machines ATC/ABOC 21 January ARCON – RAMSES Bridge ATC/ABOC Days CERN – 21 to 23.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Safety Documentation How do we organize it and what will be the contents? A. Funken, LIU Project Meeting, 26 th September 2013.
CERN GS Department CH-1211 Genève 23 Switzerland cern.ch/gs-dep Internet Services GS AIS General Services Department GS Advanced Information Services EVM.
Controls, Safety and Engineering Databases 18 Jan 2006PS & SPS Days Access Safety Systems Modifications & tests in 2006 Presented by Rui Nunes TS-CSE-AAS.
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Linac4-PSB 160 MeV connection readiness review Tuesday 30 August August 2016 Linac4-PSB 160 MeV connection readiness review 2.
Electrial Safety LS2 days November 2016 AP
SPS Personnel Protection System Renovation Project
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
BE-ICS Activities during the LS2 Period (15 min)
CENF – Personnel Protection System Preliminary Study
Evolution and future of the Access safety and control systems
LAAWG Status Report – 15th May 2007
EC Activities Status for the LIU
Quality Assurance applied to Accelerator Safety
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS activities during LS2 TE-EPC (Power Converter Group)
EP Experiments safety validation process Safety Permits
East Hall under construction
BE-ICS work for SPS Safety Systems
GIS Portal Racks Project
TEST PLANS for HL LHC IT STRING
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Access Control for CERN Experimental Areas
Safety in the East Area Renovation Project
Presentation transcript:

Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams… GS-ASE-AAS GS-ASE-SSE BE-OP

edms Outline PS Access System –Current situation –Project progress SPS Access System –Current situation –Perspective

edms Current Situation No more spare-parts Not possible to add new access points Evolution of safety norms Renovation project launched (GS/ASE) In close collaboration with BE

edms Renovation Project (1/2) Objective –To secure the PS complex according to the same principles as the one done for the LHC –Access control : Biometry, “unicité de passage” –Access safety : Compliant with new safety concepts –Flexibility required by the operators of the PS complex –Installation without impact on operation & schedule

edms Renovation Project (2/2) Large scale project dealing with the replacement of most of the current Access equipment, controls racks and cables as well as the definition and acquisition of all the necessary safety signals from the Important Safety Elements (ISE or EiS) of the various machines. Scope of Works –Mechanical : Access points, doors, grids –Computing: authorization management distribution, supervision –Safety Automation: interlocks –Electricity : cabling, optical fibers, power supply, UPS –Civil Engineering –preparing for new system and old system dismantling, while operating the accelerators

edms Stakeholders Department and Equipment Groups –BE: Controls, Operation, RF, Safety –TE: Beam Transfer, Power Converters, Machine Protection, Vacuum –EN: Electricity, Handling, Maintenance & Installation, Dumps –GS: Access, Fire brigade, Site Engineering, Administrative Information System –IT: Communication systems, Database –FP: Procurement –PHExperimental areas –Safety: Radio Protection, General safety, –CERN Internal General Access Authority ? –External: External FR-CH ? Need the same good collaboration as we had for LHC

edms PS need of Access Courtesy R. Steerenberg edms , functional spec

edms Courtesy D. Chapuis & R. Bonzano

edms Numbers Important Safety Elements to interlock –Machine: 60 –Access Personnel Access: 24 Material Access: 24 End of door zone: 54 Sector door: 10 Flow: Passages during shutdown –Operator supervised…

edms Remarks -Difficulty to use the LHC PAD & MAD due to lack of space -Civil engineering work required in a majority of cases -New type of EIS access should be studied (smaller PAD, or small MAD) -Expensive cable dismantling / installation -Existing racks, cables, interfaces with machine elements have to be replaced completely

edms Preliminary Risk Assessment Which risks shall be covered by the new system ?

edms Courtesy R. Steerenberg edms , functional spec Safety Aspects -Definition of the safety chains -Definition of the necessary EIS - Definition of safety signals - By pass monitoring

edms Operational mode Courtesy R. Steerenberg , functional spec

edms Rationalization Of the operational modes – LHC modes + test + power permit Of the access supervision by CCC Of the Man Machine Interface

edms Specification stage Preliminary Risk Assessment (edms – S. Grau) –Which risks shall be tackled by the system ? Sectorisation and location of the access equipment –V1 drawing for each zone (edms , – D, Chapuis,...) Definition of the EISbeam and EISmachine securing the risk identified for each zone (edms ) Description of the existing system (edms – R. Steerenberg) Proposed changes (edms R. Steerenberg & all ) Functional specification (edms R. Steerenberg ) –Same principles as for LHC Technical requirements (edms – L. Hammouti) Definition of the Man Machine Interface used in the CCC Architecture aspects and lesson learned from the LHC Budget estimation Most of the documents are “in work” and the approval process should be started in order to launch the implementation

edms Implementation LHC Access system experience –Components and subsystems feedback –Already major evolutions of the off-the-shelf components (biometry, Evolynx) –Contractors performance –Flexibility –LHC Access Control infrastructure already available Link with HR DB, authorization management, B55 for enrolment Implementation in two stages: –Pilot stage The underlying infrastructure for Access Control and Access Safety is put into place Sample of each EIS access working perfectly – All NC Removed East Zone –Production stage (starting with LINAC 4) Installation and integration of all the access points, doors, etc, system commissioning Work breakdown in technical WP rather than a large scale contract

edms Other aspects Impact on Controls renovation –MPS –System supervision, diagnostic, alarms Budget revision after validation of the specification Do we have enough safety signals available from the Machine Important safety Elements ? Control racks in B354 (cabling cleaning, powering, fibers) Installation conditioned by LHC planning

edms SPS Acces Safety : redundant interlock system operational (IRSN – OK) Evolution of the access control for use of the RFID Dosimeter completed (IN and OUT) Replacement of the Access points of the Experimental areas. Maintenance –System is based on an obsolete Siemens S5/SINEC H1 architecture –Obsolete FactoryLink supervision Perspective –Option 1 : big renovation project LHC style (XXMCHF) -> no HR resources available –Option 2 : Migration to Siemens S7 and new supervision (2 MCHF)

edms Conclusion PS –Many CERN groups concerned –Project started, already good specification available –Validation of the Preliminary Risk Assessment and specification -- >for Precise estimates & to start implementation –BE representative collaboration to be « re-energized » Functional aspects & Safety Aspects –System architecture is progressing –Planning under study (following the LHC schedule) –Milestone LINAC 4 SPS –Evolution of the current system –No resources available to start a large scale renovation project