AUTONOMOUS REGION OF FRIULI GIULIA ALPCITY PROJECT : WORK PACKAGE 7 “Urban Environment” Pierpaolo Suber WP6 Transnational Co-ordinator Pierpaolo Suber.

Slides:



Advertisements
Similar presentations
A transnational project implemented by PPs Meeting PUBLIC AREA.
Advertisements

Project Eco-pedological Map for the Alpine Region SUMMARY 1. The Alpine Convention context 2. Ecopedological map project proposal 3. Preliminary APAT approach.
Centre for Strategy & Evaluation Services Evaluation of the SME Funding Schemes - summary European Agency for Safety and Health at Work.
Transnational conference Local strategies for land use management according to Kyoto Protocol CARBON-PRO PROJECT: ACTIVITIES AND RESULTS Carbon balance.
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
OPENCities OPENCities is based on a concept developed by British Council in collaboration with a network of European Cities, led by Belfast, including.
Green Partnerships Local Partnerships for Greener Cities and Regions Project overview Kick-off meeting Crete, 9-10 April 2013.
Adriatic MoS The MED-PCS project July 15, Rome PROMOTION OF "PORT COMMUNITY SYSTEM" IN MEDITERRANEAN TRAFFIC Vittorio Marzano Assistant professor.
Financial Affairs Communication Plan. Meeting Attendance & FAR Member Guidelines   FAR members are responsible for disseminating information to the.
WP4: Local Consultative Committees For comprehension and comparison, finding common ground Situating of Case Study Composition of LCC’s Functioning of.
FROM GAPS TO CAPS Risk Management Capability on Gaps Identification in the BSR Neringa Brogaitė-Karvelienė Fire and Rescue Department under MoI of Lithuania.
URBACT INFODAY FINLAND TOWARDS URBACT III Helsinki, 05 November 2014.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
ALPINE SEARCH AND RESCUE FOR SLOVENIA AND ITALY. ALPSAR IN SHORT  Budget: € ,00  EC Contribution: € ,25 (75%)  Duration: 24 Months 
Auditing and Certification Scheme to increase the quality of Sustainable Urban Mobility Plans in Cities Organisation Surname, Name Meeting / Conference.
Clara Puech European Projects Coordinator EGNATIA EPIRUS Foundation INTERREG III B CADSES Neighbourhood Programm “HERITOUR” September 2005.
‘Local endogenous development and urban regeneration of small alpine towns’ Highlights concerning the working groups held in Milan Gian Paolo Torricelli.
SWG on AGRO-FOOD PROCESSING ACTIVITIES Sofia, 26 November 2010.
A transnational project implemented by WP 6 - SERVICES AND QUALITY OF LIFE SCIENTIFIC MEETING, MILAN Local endogenous development and urban regeneration.
Franche-Comté new case project in WP8 (cooperation among towns) : Research on the territorial organisation of Franche-Comté Local endogenous development.
Green Partnerships Local Partnerships for Greener Cities and Regions 5 th Steering Committee meeting Lakatamia, June 2014.
PREDSTAVITEV PROGRAMA MED Margarita Jančič Ministrstvo za okolje in prostor Direktorat za evropske zadeve In investicije 10. April 2008, Ljubljana.
Plans for the next programming period ESF implementation in Poland
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
Post-Secondary Education Program Joint AFN/INAC PSE Program Review with representation from NAIIHL and the Labrador Inuit Regional Information Process.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
MEM Lao PDR RESIREA Renewable Energy Sustainable Programs For Intelligent Rural Electrification and Poverty Alleviation General presentation Kick-off meeting.
Green Partnerships Local Partnerships for Greener Cities and Regions Study visit and 3 rd Steering Committee meeting Freiburg, 14 – 18 October 2013.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
Henrik SandHANDSPage 1/ Part A & Budget - an overview HANDS Partner meeting Aalborg - September 14th 2007.
Local endogenous development and urban regeneration of small alpine towns Work Package 9 BEST PRACTICES AND FUTURE SCENARIOS Coordinated by Regione Piemonte.
Local endogenous development and urban regeneration of small alpine towns ‘ ‘ ’ ’ A trans-national project co-financed by ERDF funding in the framework.
Role of the Secretariat The Secretariat will be responsible for the co-ordination and enhancement of research and networking activities within MariFish.
International E-Health Conference “E-Health:around the clock care for everyone, everywhere” Quality in Health Care and Medical care E-Health in Friuli.
Main elements Operating principles Open Days, Brussels October 12, 2005 R. Hummelbrunner Project Manager INTERREG IIIB CADSES Project MATRIOSCA AAP.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
Bavarian Ministry of Economic Affairs, Infrastructure, Transport and Technology InnoCité Presentation of the partnership the Bavarian Ministry of Economic.
SEA in the Czech Republic Prague, 24 September 2008.
ALPCITY Niederoesterreich  Urban Regeneration in Lower Austria Association for regeneration of towns and villages Office in each of the 4 regions of Lower.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Work Package 1: Progress and Focus on specific issues 5th Steering Committee Meeting Rijeka, 26/2/2015 Presented by: Mrs Maria Poulou.
1 U.C. Pianificazione Territoriale e P.T.R.C. “ALPCITY” VENETO CASE-PROJECTS Renovation and optimum use of abandoned rural and productive buildings 2 0.
AlpCity AlpCity Final Conference Prà Catinat, 16 October 2006 Ivan Curzolo - JTS Alpine Space Programme.
1 Hamburg, May 2015Francesco RubinoProvincia Autonoma di Trento The SWORD project: Planning of SWORD activities for the next six months and beyond.
1 The SWORD project: an operational plan Kick-off meeting Autonomous Province of Trento Trento, December 18-19, 2014 SWORD (School and WOrk-Related Dual.
Project “Eco-pedological Map for the Alpine Region” APAT- Agency for Environmental Protection and Technical Services Harmonization of Soil Information.
Community Engagement to Advance Mitigation Action.
1 Region4 Conference Administrator’s Report Sat Basu Conference Administrator Region 4 Meeting Saturday, January 23, 2010.
Old Neighbours – New Relations Workshop 09D03 „Multiregional co-operation – recipes for success“ Brussels 9th October 2007 R. Hummelbrunner (Graz, Austria)
INTERREG III B CADSES Neighbourhood Programme Administrative and Financial Aspects of Hydrocare Project Dr. Janka Strakova Project contact.
WP3 Capitalisation of results
he transport development progress in Slovenia the EASYCONNECTING hint
CaSYPoT project structure
PLANNED ACTIONS – UPCOMING DUTIES
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Pracatinat - Fenestrelle
The PUMAS project.
Administrative / Financial guidelines
National Institute of Administration
Risk Management Capability on Gaps Identification in the BSR
8th Coordination Meeting th February, Heidelberg, Germany
SMATH Smart atmospheres of social and financial innovation for innovative clustering of creative industries in MED area Smart Atmospheres wealth of heritage.
ENI CBC Joint Operational Programme Black Sea Basin
WP2 Communication WP and tasks presentation
Budget: ,00 € (90% Commission contribution)
European Statistical System Network on Culture (ESSnet Culture)
Workplan and Administrative Management
Transnational cooperation in the Alpine Space
FVG AR Action Plan Implementation
Presentation transcript:

AUTONOMOUS REGION OF FRIULI GIULIA ALPCITY PROJECT : WORK PACKAGE 7 “Urban Environment” Pierpaolo Suber WP6 Transnational Co-ordinator Pierpaolo Suber

. 2 SUMMARY Local planned activities of the Region FVGLocal planned activities of the Region FVG Key case 1Key case 1 Key case 2Key case 2 Key cases stepsKey cases steps

. 3 TIMEFRAME WP time frame as scheduled in the AF WP duration: 20 monthsWP duration: 20 months WP starting date: September 2004WP starting date: September 2004 WP ending date: April 2006WP ending date: April 2006

. 4 PLANNED ACTIVITIES PROJECT CONCEPT Starting from the project idea designed to enhance the endogenous resources of alpine settlements, the endogenous resources of alpine settlements, the Region of FVG, considering that such small administrations have difficulties in terms of size, financial capacity and professional skills, intends financial capacity and professional skills, intends financing pilot studies and planning activities. financing pilot studies and planning activities.

. 5 PLANNED ACTIVITIES These activities foresee two different key studies: 1) guidelines for the recovery of abandoned areas in the neighbourhood of the borders with Austria and Slovenia ( involving the area of Tarvisio); 2) guidelines for obtaining the environmental certification (involving the area of Forni di Sopra), These activities should reach at least the level of a “pre-feasibility project”, including the project financing “pre-feasibility project”, including the project financing necessary to them actually being carried out. necessary to them actually being carried out.

. 6 STEPS Key Study 1 Preliminary analysis of the endogenous resources and of the existing potentialities connected to the recovery of the abandoned areas;Preliminary analysis of the endogenous resources and of the existing potentialities connected to the recovery of the abandoned areas; comparison of the ideas that have arisen at a local level together with the trans-national best practices concerning similar problems;comparison of the ideas that have arisen at a local level together with the trans-national best practices concerning similar problems;

. 7 STEPS definition of guidelines, planning and pre-feasibility project for the recovery of dismantled areas and structures.definition of guidelines, planning and pre-feasibility project for the recovery of dismantled areas and structures. The University of Udine (Department of Civil Engineering) will be appointed to carry out the Engineering) will be appointed to carry out the guidelines and the pre-feasibility project. guidelines and the pre-feasibility project.

. 8 STEPS Key Study 2 Preliminary analysis of the endogenous resources and of the existing potentialities connected to the enhancement of the natural landscape;Preliminary analysis of the endogenous resources and of the existing potentialities connected to the enhancement of the natural landscape; definition of guidelines in order to obtain environmental certification;definition of guidelines in order to obtain environmental certification; preparation and dissemination to Local Authorities of a special manual.preparation and dissemination to Local Authorities of a special manual.

. 9 PRESENTATION OF RESULTS The presentation of WP7 results to the local authorities of the regional mountain areas will take place in May 2006.The presentation of WP7 results to the local authorities of the regional mountain areas will take place in May The AlpCity outputs will be disseminated during the Summer, after the final general international conference of the project scheduled in June 2006.The AlpCity outputs will be disseminated during the Summer, after the final general international conference of the project scheduled in June 2006.

. 10 THE END