Pierre Testor LOCEAN, CNRS, Paris, France EuroGOOS Joint ROOS-WG-TT, 04 March 2015, Brussels, Belgium 1km ~2-5km Data Centers Land Station users A “glider”

Slides:



Advertisements
Similar presentations
The White Paper – a policy paper to contribute to the integration process of the WBC in the ERA Dr. Erika Rost, Dr. Andreas Kahle Federal Ministry of Education.
Advertisements

EAMNet: Europe Africa Marine-EO Network: involvement with GEO and suggestions for the workplan Steve Groom, PML EAMNet partner New GNC system.
MIRA - WP 2 Observatory of Euro-Med S&T cooperation White Paper Coord. IRD (France) CNRS (Lebanon) MIRA Mediterranean Innovation and Research coordination.
A European Strategy for Marine and Maritime Research
UPGRADE BS-SCENE Up-Grade Black Sea scientific network (INFRA) ENVIROGRIDS Building Capacity for a Black Sea Catchment Observation and Assessment (Environment)
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
1 State of play Robert Lowson EEA Kopernikus coordinator, GMES Bureau.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Seventh framework programme CAPACITIES specific programme Activities of international cooperation Coordination Support Action - Grant agreement no.:
First Marine Board Forum – 15 May Oostende Marine Data Challenges: from Observation to Information From observation to data.
1 23/05/2015 Networking Research Infrastructure NCPs National Hellenic Research Foundation (EKT/NHRF) Project Monitoring & Coordination Unit EuroRIs-NET.
European COastal-shelf sea OPerational monitoring and forecasting system ECOOP.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
SeaDataNet, pan-European infrastructure for ocean and marine data management A key component of EMODNet A possible building block for GEOSS By Dick M.A.
WP5 Strategy Domenico Giardini SED ETHZ. WP5 Objectives Harmonize national implementation Integrate the European scientific community Establish Centres.
EuroMarine Integration of European Marine Research Networks of Excellence General Assembly, Bremen (DE) January 18-19, 2012.
JPI "Healthy and Productive Seas and Oceans” A New Frontier ERRIN, December 8 th,2011 Rudy Herman.
EARLINET-ASOS Symposium 20 September 2010, Geneva, Switzerland EARLINET: Future plans Gelsomina Pappalardo Consiglio Nazionale delle Ricerche-Istituto.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
The Preparatory Phase Proposal a first draft to be discussed.
Capacity Building Issues ADC-3 Meeting Geneva – 3 March 2007 Errol Levy CBC Co-Chair (European Commission)
European Life Sciences Infrastructure for Biological Information ELIXIR
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
Towards a Tsunami Warning and Mitigation System in the Indian Ocean IOC of UNESCO.
EGO (European) Everyone’s Gliding Observatories Action ES0904 Start date: 15/07/2010 End date: 14/07/2014 Year: 3 Pierre Testor Chair LOCEAN-CNRS / France.
The GEOSS Portfolio for Science and Technology Produced by ST Featuring: Climate: Capacity Building of Operational Oceanography and Climate Adaptation.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
MARINERA Marine ERAnet European Research Area Identify research infrastructures Promote exchange between research teams in and outside Europe Organise.
Design central EMODnet portal Objectives, Technical Proposal and Consultation Process.
Main components of monitoring and forecasting in Arctic and sub-Arctic regions Modelling and Forecasting capacity From MERSEA IP to the Marine Core Service.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
MRI Expert Group JERICO A Joint European Research Infrastructure network for Coastal Observatories.
OCG-6, 27 April 2015, Cape Town, South Africa EGO/GROOM ‘artistic’ view Pierre Testor LOCEAN, CNRS, Paris, France EGO: Everyone’s Gliding Observatories.
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
The Coordination of Agricultural Research in the Mediterranean and its e-infrastructure tool Presented by WP1 Leader Mipaaf-IT, Annamaria Marzetti & Serenella.
FP7* support to GEO activities Update for 5 th GEO ADC Meeting A Edwards Washington, D.C., U.S.A September 2007 * FP7 is the European Community’s.
EGO (European) Everyone’s Gliding Observatories Action ES0904 Start date: 15/07/2010 End date: 14/07/2014 Year: 4 Pierre Testor Chair LOCEAN-CNRS / France.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
European Gliding Observatories Network (EGO) Action ES0904: Start date: 01/10/2010 End date: 30/09/2013 Year: 1 Pierre Testor Chair LOCEAN-CNRS / France.
JCOMM Services Program Area Working together beyond GODAE for Operational Oceanography Dr. Craig Donlon JCOMM Service Programme Area Coordinator The Met.
Towards an European Network of Earth Observation Networks (ENEON): Addressing Challenges and Facilitating Collaboration for non-space based Earth Observations.
WP3 Harmonization & Integration J. Lauterjung & WP 3 Group.
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
Splinter Session 1a : Identify topics Europe would like to have included in the GEO WP Chair: Luigi Fusco, ESA Reporting: Luca Demicheli, EuroGeoSurveys.
Oceans and Society: Blue Planet An Integrating Task of GEO for Oceans Oceans and Society: Blue Planet An Integrating Task of GEO for Oceans Trevor Platt.
The European Transport Research Alliance - ETRA Prof. G. A. Giannopoulos Chairman, ETRA.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
EGO: Everyone’s Gliding Observatories
INTAROS – Integrated Arctic Observation System
Monitor & review Implementation of EGOS- IP in RAII
Regional Research-driven clusters as a tool for strenghthening regional economic development: the FP7 Regions of Knowledge Programme and its synergies.
JCOMM in-situ Observations Programme Support Centre www. jcommops
FP7-Infra : Design studies for European Research Infrastrutures
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Oceans and Society: Blue Planet
MonGOOS network Enrique Alvarez, (Puertos del Estado)
IHO-European Union Network Working Group (IENWG)
Overview of working draft v. 29 January 2018
JCOMM in-situ Observations Programme Support Centre www. jcommops
Challenges & opportunities for developping regional cooperation
JCOMM in-situ Observations Programme Support Centre www. jcommops
Animal-Borne Instrument Task Team ABI TT Terms of Reference
Experience of the implementation of FP6; preparations towards FP7
Presentation transcript:

Pierre Testor LOCEAN, CNRS, Paris, France EuroGOOS Joint ROOS-WG-TT, 04 March 2015, Brussels, Belgium 1km ~2-5km Data Centers Land Station users A “glider” Observing Task Team (TT) in EuroGOOS: towards the EOOS

10/2/2015OCG5 - September 2013 EU, USA, Canada, Australia, Mexico, South Africa, Peru, Chile,… (academics+manufacturers) EGO meetings and Glider Schools Showcase website International fleet experiments OceanObs’09 White Paper (Testor and 44 co-authors, 2010). Gliders are perfectly suited for physical, biogeochemical and biological measurements can be used in combination with the other components of the GOOS can enhance the spatio-temporal sampling of the GOOS (in-situ) where required (10,000 unique visitors and 100,000 pageviews per year) OceanObs’09  need for a glider component in the GOOS in line with the other components, recommendations. EGO: a glider community (sci & tech)

USA AU EU and others ~ 12,000 km altitude process studies AND long-term observations (repeat-sections in key areas) Monitoring the glider network activity is based on the operators good will. Maybe ~500,000 profiles since A lot of data sent to data centers Sustained activity (USA, Australia, EU) All glider deployments since 2005 (+ deployments in the Artic/Antarctic, SE/SW Pacific, Polynesia, Indian ocean,…) EGO: international coordination

COST Action ES EGO (coordination/wide-open: include Australia, South Africa, Israel, Mexico, USA, Canada, Peru, Chile, Egypt, Tunisia, Algeria…) FP7 Research Infrastructure design study “GROOM” Gliders for Research, Ocean Observation and Management (WP2 = Integration into the GOOS) Need for a glider component in the GOOS ~ 90 gliders in EU + « downstream » infrastructures + personel (~50 FTE) > 10,000 profiles / year (physical/biogeochemical) 20-30% of the global activity ~ 3-6 Meuro / year (consolidated) 1

OceanObs’09 recommendations: Best practice for gliders the formation of the global glider system; the adoption of standards and a “Argo” like data system for gliders; the setup of a network of shared resources and expertise; to establish the adoption of a common and accessible portal for glider data. Issues and challenges for gliders Scientific, organizational, and technological issues (new paradigm: bidirectional communications) “main” gliderports distributed all around the world users

The 5 aspects of a Gliderport An example of a fairly sophisticated glider port. Most important tasks covered but at great costs/efforts. Recommendations Standards Protocols Best practise Design System reviews Gap analysis Costs analysis

Networking towards a Glider EU Research Infrastructure (GERI) able to contribute to the GOOS (robust and sustained) engage new users (access), enable new applications coordination, sharing, exchange, standards

Level of integration of the GERI Different aspects to consider for networking/pooling Need for a glider coordinator (Black) proposed tasks for the GERI (White) kept at the glider operator level agenda for the next years ( ; ; 2019+)

Such a GERI is necessary for :  coordination of the European contribution to a sustained marine observational system, towards a European Ocean Observing System (EOOS)  working closely together with EU Marine Research Infrastructures, JPI Oceans, EMODnet, EU Copernicus Marine Service, EEA, ESA, EUMETSAT,… and EuroGOOS national/institutional members. The way forward: GERI: a distributed architecture in six EU ROOSes (+ global) for sustained glider repeat-sections (gaps: shelf-open sea continuum, physics/biogeochemistry) Gliders and EuroGOOS Systematic and long-term measurements, rapid interpretation and dissemination Development of Operational Oceanography (EU Seas + adjacent oceans) Foster European scale co-operation and integration on Operational Oceanography

Issues impact Endorsement, visibility and more outreach/awareness for the gliders. Networking with other obs. systems Definition of a global glider program ; consensus on main scientific objectives ; links with the ROOSes and WGs/TTs Help to set up a GERI (join the ESFRI roadmap?) –Better use of gliders (e.g. research, operational oceanography, in-situ/satellite comparisons, academic models, industry…) –Better coordination with the other in-situ and satellite components (legal entity: excellent science, scale economies, maritime law/traffic issues…) Support for a glider coordinator and a glider committee Desired outcomes ? EuroGOOS and a glider TT  Expect a snowball effect for (present and future) glider operators. Sustainability, capacity building and development.

1.Act on behalf of the European part of the global glider community (EGO). Develop a glider component in the GOOS at the EU level together with international partners (USA, Australia, South Africa, Mexico, Peru, Chile,...). 2.Develop the European glider network, coordinate and assist the standardization of glider operations, data and applications. Ensure data availability, via EMODnet and ROOS data portals in particular. 3.Set up a framework for users and operators: 1.promoting glider applications through liaison between providers and users, advocacy, and provision of expert advice. 2.sharing success stories and difficulties 3.maintaining and sharing reference material on glider-related technologies (sensors, their protocols, readiness levels and specifications, data management standards, protocols) 4.providing and exchanging open source tools (piloting, maintenance, data QC and analysis, applications…) 5.promoting scientific synergies with other observing systems for key questions; filling gaps ! 6.promoting joint proposals 4.Contribute to the development of the European Ocean Observing System (EOOS), in the coastal area and in the open ocean. Establish a Glider European Research Infrastructure (GERI) to better sustain this glider activity. Terms of Reference for a glider TT in EuroGOOS

Promotion of the glider group (ToR 1) ActionTermWho/ToR/…? ToR and roadmap (this document)IP Core group definition, adding strategic membersIP Draft an implementation plan for a glider component in the GOOS at the global scale, a common scientific international program for sustained glider observations ST Seek funding for joint/coordination activitiesST Interact with existing initiatives in other countries (USA, Australia, South Africa, Mexico, Chile, Peru...) IP Development of standards (ToR 2) ActionTermWho/ToR/…? Publish and promote the results of the FP7 GROOM design study (website) IP Promote best practise with gliders, the usage of GROOM standards and formats (website) ST Develop tools for better monitoring the glider data flowMT Work plan

Towards providing a framework to glider users (ToR 3) ActionTermWho/ToR/…? Create website for the group in the EuroGOOS framework. Organization of the information (topics) in the website (news, links, …?) ST Repositories for softwareST ResearchGate group/topic?ST Organization of the next (7 th ) EGO meeting and Glider School in 2016 (and every two years) ST MT Towards the EOOS (Tor 4) ActionTermWho/ToR/…? Reporting on existing European and national glider initiatives (work plan, results…) ST Strengthen the network of “gliderports”IP Assess the sustainability of the glider activity. Help partners to join the ESFRI roadmap. MT Identify specific added value products of gliders that can be useful for specific stakeholders ST Work plan

Thank you ! EGO/GROOM ‘artistic’ view Related EU projects: AtlantOS, JERICO-Next, ENVRIplus, BRIDGES… … but a lot to do !!!