MTA Regional Commuter Rail System. Bringing the LIRR to Grand Central Terminal (GCT) - Route Map.

Slides:



Advertisements
Similar presentations
East Side Access Outreach
Advertisements

Index The Region: 7 Av IRT – 1, 2, 3, 9 8 Av IND – A, C, E 8 Av IND – Extended Downtown: 7 Av IRT – 1, 2, 3, 9 8 Av IND – A, C, E 8 Av IND – Extended.
Index The Region: East Tunnel 8 Av / Fulton St IND – Completed8 Av / Fulton St IND – Completed 8 Av / Fulton St IND – Service8 Av / Fulton St IND – Service.
Automobile Engine NO.4. NO.1 Mercedes-Benz E-class.
Index The Region: Regional Transit West East North West Side Access Downtown: Transit Lines Catchment Areas BACKNEXT INDEXEND Lower Manhattan Transit.
Smart Growth Station Planning and Transit Oriented Development Photo: Times Herald-Record/Tara Engberg.
GROUND TREATMENT WORKS COMPENSATION GROUTING FARRINGDON STATION Client: CrossRail Main Contractor: BFK (Bam-Ferrovial-Kier JV) Site Location: Farringdon.
Regional Transit to Lower Manhattan Initial recommendations for a transportation plan for Lower Manhattan Presentation for Discussion to the Civic Alliance.
Index The Region: Newark to Pelham Downtown: Lex Av IRT – 4, 5, 6 PATH PATH & Lex Av IRT – 6 Fulton Street Basic Alignment 2.8 BACKNEXT INDEXEND PATH-Lex.
John James Audubon Bridge Main Span Materials and Equipment Cement from Thailand Structural Steel from Japan Oscillator from Germany Wind tunnel analysis.
February 17, 2011 Los Angeles MTA, Metro Gold Line Eastside Extension, Boyle Station U-LINK LIGHT RAIL TUNNELS.
New York Building Congress November 13, 2014 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM.
Major Construction Completed
Penn Station Metro-Hub A Short Term Action Plan Prepared by Regional Rail Working Group Empire State Passengers Association Committee for Better Transit.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Janet Lawson Living Streets Aotearoa Walk 21 – New York City October 2009.
Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project.
22/06/2015Regional Writing Centre, UL2 22/06/2015Regional Writing Centre, UL3.
> >
SUBWAY SYSTEM IN NEW YORK CITY The Magical Subway.
6.2 Circumcenter and Incenter
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Stop Sign This is a traffic sign. This means to stop. It helps us be safe when driving.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
© 2008 Mass Transit Experience Contact: Curt Bailey, President (248)
Global Design Effort - CFS for Asian Single Tunnel Configuration Design Progress Masanobu Miyahara KEK.
Electrical & High Temperature Utility Distribution Upgrade.
“Rags to Riches” Scottish immigrant Supported unionization verbally Invested in Bessemer Process Established over 2,500 public libraries Donated $350.
September 26, East Side Access Status Report to CPOC September 26, 2011.
The Church Street resident only parking lot, next to the sewer pump station is CLOSED due to the construction work on the Pump Station. Resident are to.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Getting to know New York CGG3O. New York The 5 Boroughs: –Manhattan –Staten Island –The Bronx –Queens –Brooklyn.
Wholesale market- the instrument of the country’s and the region’s policy Through wholesale markets, local and central governments are able to create the.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Starting in Battery Park, begin to replace necessary subway grates with elevated grates. Seal up grates that prove to be unnecessary. Repeat this process.
New York, August 2003 The traffic was slow from Newark airport to Manhattan through the Holland tunnel so our driver took the long way via Staten Is.,
1 September 26, 2011 Recap The IEC was directed to report their confidence in the project’s mitigation proposed in June. In response, the IEC has evaluated.
Morgan Neal GEOG 385 Fall 2011 Objective – Identify a driving route through locations within a user-specified distance of the lower American River using.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
PENNSYLVANIA STATION “One entered the city like a god; one scuttles in now like a rat,”
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
New York MTA Opportunities for
Analysing the Case for Change Joe Lennard | Digital Railway Funding Lead Suppliers’ Summer Conference 15/07/2015.
Middlebelt Transport and Storage Tunnel (MTST) Project
CLIC Civil Engineering Update
Turning Ideas into Reality Presentation to Build NYC
Experimental hall design in Japanese site
Canton Crossing Tower Baltimore, Maryland
Hire Toyota Innova in Delhi for Outstation Tour
D I s , a ·.... l8l8.
Hypothesis Tests for Two Population Proportions
NYC landmarks quiz.
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
كيــف تكتـب خطـة بحـث سيئـة ؟؟
الدكتـور/ عبدالناصـر محمـد عبدالحميـد
Plant Bowen Scrubber Unit 3
1871:Grand Central Railroad Depot opens
Regional Rail What is Missing? Metro-North NJ Transit LIRR
Circulatory system 7.L.3B.2 Construct explanations for how systems in the human body (including circulatory, respiratory, digestive, excretory, nervous,
I ll I
2019 Fare and Toll Proposals
Reedy River Basin Sewer Tunnel Project Update
Make no mistake – our contingency service cannot replicate the railroad. We will not be able to provide the level of service or the capacity that our.
' 1 A ./.\.l+./.\.l

Around the room Orders of operations.
Central Park in New York
The Synagogue and the Upper Room
Welcome to the Final Cross County Trail Public Input Session!
Presentation transcript:

MTA Regional Commuter Rail System

Bringing the LIRR to Grand Central Terminal (GCT) - Route Map

New LIRR Tunnels Metro-North Railroad Park Ave Tunnel NYCT 60th Street Tunnel (N and R) In Manhattan: Tunnels and a New Terminal

Tail Tunnel Cross Passage 2 LL N Cross Flue & Construction Cross Passage Cross Passage 7 GCT 5 Wye Caverns GCT 3 Wye Caverns Cross Passage 2 Approach Tunnels & Assembly Areas Central Instrument Room & Transformer Niches Cross Passage 6 Sump Pump Chamber Cross Passage 4 Cross Passage 5 Drill & Shoot Areas Required CIP Lining Upper TBM Drives (no lining) Lower TBM Drives (no lining) Upper TBM Drives (precast / CIP lining) Lower TBM Drives (precast / CIP lining) TBM Starter Tunnels Tail Tunnel Cross Passage 3 LL Tail Tunnel Cross Passage 2 UL Tail Tunnel Cross Passage 3 UL Stub Tunnels Construction Cross Passage GCT Shaft #5 With Cross Passage GCT Shaft #1 50’ +/- Tail Tunnel Cross Passage 2 LL