Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project.

Similar presentations


Presentation on theme: "Created by Michael ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project."— Presentation transcript:

1

2 Created by Michael

3 ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project will include a two-track line along second avenue from 125th street to the financial district in lower Manhattan. The line will be built in four phases and contain two subway services: an extension of the existing Q subway line and the new T line.

4 SAS PHASES Phase 1 will be an extension of the Q across 63 rd street and north along second avenue to the upper east side at 96 th street. Phase 2 will be another extension of the Q to 125 th street from 96 th street. Phase 3 will be from 63 rd street to Houston street which will introduce the new T line. Phase 4 will be from Houston street to Hanover square which completes the line.

5 PAST OF THE SAS http://www.youtube.com/watch?v=ltwp-zU-CnA

6 FUTURE OF THE SAS

7 BIBLIOGRAPHY