USF Path 66 Analysis Update January 31, 2013 Robin Chung UFAS Chair.

Slides:



Advertisements
Similar presentations
Bill Blevins Management of the West-North Stability Limit Under the Nodal Market.
Advertisements

2 Draft of proposed metrics for the WEQ BPS to conduct analysis and evaluation of the Parallel Flow Visualization pilot project. (PFV Pilot)
Parallel Flow Visualization/Mitigation Proposal
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 24, 2013 Anaheim, CA.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Modeling Tres-Amigas Update Modeling Work Group Meeting February 10, 2011 WECC Staff.
WECC Reliability Based Control Field Trial
Craig L. Williams UFAS Liaison Market Interface Manager ECC Cost Benefit Analysis Review July 17-19, 2013 Standing Committees Joint Session.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
SIS Report Jerry Smith Albuquerque, NM March 7, 2008.
Unscheduled Flow Administrative Subcommittee Report David Lemmons March 27, 2013 Salt Lake City, UT.
Unscheduled Flow What direction for the Future
ACE Diversity Interchange (ADI)
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
POTF Status update.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
FERC Order minute Scheduling.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
MIC RBC Task Force Report Raj Hundal Feb 1, 2013.
Enhanced Curtailment Calculator (ECC) Task Force Joint Guidance Committee Presentation and Motion to the OC & MIC Standing Committee Meetings March 27-29,
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
Andrew Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
WECC Reliability Based Control Field Trial
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
Western Regulation Usage and Pilot Program Results 1.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung January 28, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
UFMP methodology changes in the updated webSAS February 2015 A video presentation reviewing the webSAS UFMP methodology changes going into effect March.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Peak RCCo Performance Metrics Draft –November 2013.
Unscheduled Flow Administrative Subcommittee Report for ISAS Robin Chung August 20, 2014 Salt Lake City, UT.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
Unscheduled Flow Administrative Subcommittee Report for MIC Pete Heiman October 14, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Unscheduled Flow Administrative Subcommittee Report Robin Chung October 8, 2014 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Unscheduled Flow Administrative Subcommittee ISAS Report Pete Heiman April 20, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Kenneth Silver Los Angeles Department of Water & Power
Brett Wangen Director of Engineering, Peak Reliability
Unscheduled Flow Administrative Subcommittee Report
Unscheduled Flow Administrative Subcommittee MIC/OC Report
Doug Reese, USFEATF Chair
Kenneth Silver Los Angeles Department of Water & Power
Mgr. Interconnection Reliability Initiatives
Mgr. Interconnection Reliability Initiatives
Unscheduled Flow Administrative Subcommittee Report
Enhanced Curtailment Calculator (ECC)
Doug Reese, USFEATF Chair
Unscheduled Flow Administrative Subcommittee Report
UFMP methodology changes in the updated webSAS
Unscheduled Flow Administrative Subcommittee ISAS Report
Study Results Drought Scenario Study
Two-Tier Firm Curtailment Overview
Unscheduled Flow Administrative Subcommittee Report for MIC
WIAB WECC Interchange Authority Backup
Presentation transcript:

USF Path 66 Analysis Update January 31, 2013 Robin Chung UFAS Chair

Background In 2012, WECC experienced significant utilization of the Unscheduled Flow Mitigation Plan (UFMP) From 2011 to 2012, Plan usage increased significantly The majority (~90%) of this increase was on Path 66, the California-Oregon Intertie UFAS tasked with determining cause(s) of this increase

Path 66 Hours of Coordinated Operation of Phase Shifters –2010 : 200 hours –2011: 322 hours –2012: 2513 hours Hours of Curtailments –2010 : 59 –2011: 55 –2012: 1112

Path 66 Relief MWh of Relief by Curtailment of Off-Path Schedules: –2010 : 8,059 –2011: 8,634 –2012: 138,139

For All Qualified Paths Hours of Coordinated Operation of Phase Shifters –2010 : 446 hours –2011: 714 hours –2012: 2787 hours Hours of Curtailments –2010 : 132 –2011: 206 –2012: 1300

Potential Contributing Causes Degree of on-Path Utilization Effectiveness of Qualified Controllable Devices (Phase Shifters) Appropriateness of Initiation and Termination of UFMP Events Interconnection-Wide Generation Dispatch Patterns Effect of Reliability- Based Control Field Trial (RBC)

Degree of Path Utilization From 2010 to 2012, Path 66 utilization has significantly increased Measured as percentage of on-Path schedules versus Path Limit (SOL) Usage is expected and entirely allowable; Path owners have a right to utilize their capacity

Path Increased Utilization Factors Path 66 SOL generally lower in 2012 compared to previous years –Significant restrictions for many hours (below 2800 MW SOL), including outage resulting in 600 MW SOL Path 66 on-Path scheduled energy was higher

Impact of Increased Path Utilization Less margin to absorb unscheduled flow: USF has a higher impact when SOL is reduced Observed that for most months in which on- Path schedules exceeded 65% of Path SOL, UFMP usage increased Conclusion: Path utilization deemed to be a large contributor to the 2012 USF increase

Phase Shifter Effectiveness Significant PST outages for 9 out of 12 months in 2012 Measure PST effectiveness by looking at COPS hours to contributing schedule curtailments Ratio of COPS/Curtailments in 2012 the lowest ratio in past 11 years –2010: 3.4 –2011: 3.5 –2012: 2.1

Phase Shifter Effectiveness One particular Qualified Device outage is believed to cause between MW of impairment to Path 66 USF relief Resulted in an additional MWh of off- Path curtailments during each hour of curtailment events Conclusion: Phase Shifter Effectiveness is deemed to be a large contributor to the 2012 USF increase

Appropriateness of Event Initiation and Termination Data in webSAS tool suggests some events did not meet the 95% Path loading threshold and that certain events were not terminated when they dropped below the 92% threshold UFAS review of details and circumstances around these events found they were generally in accordance with Plan documents

Explanation of webSAS Data Indicators Path Operator utilized alternate mitigation actions (circulation on the DC Intertie, independent use of PSTs) Indication that termination of event would result in immediate recurrence of USF problem Conclusion: Event Initiation and Termination is deemed to be a small/negligible contributor to the 2012 USF increase

Interconnection-Wide Generation Dispatch Patterns Large Generation outage (SONGS) of 2300 MW in CISO BA Good water year in Pacific NW Compared Net Scheduled Interchange (NSI) for 2 day period in March 2012 to comparable 2 day load period in March 2010

NSI Statistics Higher exports from BAs North of Path 66, particularly BPA Higher imports South of Path 66, particularly CAISO and LAWP Additional examination necessary to confirm this finding Conclusion: Generation Dispatch Patterns are deemed to be a medium contributor to the 2012 USF increase

Effect of Reliability-Based Field Trial (RBC) Several approaches examined by UFAS and other observers Conflicting conclusions exist based on available information and study Four different approaches taken

Minute-by-Minute ACE Analysis for 30 USF Events from 2012 Data consisted of BA ACE for each minute of a two- hour span of 30 events BAs organized into three geographic/electric regions –North of P66 –South of P66 –East of P66 Less than 10% of the minutes of the 30 events exhibited positive ACE in north bubble coincident with negative ACE in the south bubble. When effect of East group is considered, 39% of the minutes exhibit some exacerbating contribution of BA ACE to Path 66 USF

Powerex Analysis for 30 USF Events from 2012 Powerex used same 30-event data, assumed ACE is correlated and causatory Concluded that up to 47% impact on magnitude of USF energy/curtailments. Concludes that the degree of curtailment was worse under the period of RBC field trial

WSM Power Flow Analysis for 30 USF Events from 2012 WECC Staff conducted analysis using power flow adjustments to correct BAs found to be outside their L10 limits back to L10 Simulated the effects of operation without the RBC Field Trial; i.e. under the prior CPS2 limits In four cases, correction to the L10 would have increased the Path 66 USF (RBC was benefitting) In all but one of the remaining cases, correction to L10 would have provided an average of 2% reduction in path loading In one case, this correction to L10 exhibited a 19% decrease in path loading (SOL of Path MW) Analysis indicated that the RBC field trial had little effect on the number of USF events for Path 66

Detail Examination of March 28, 2012 Path 66 Event The data includes minutes prior to event initiation, while Path Operator making a determination about initiation UFMP. North of Path 66 BA group was only in excess of group ACE L10 for one minute; South group aggregate ACE was always within the group ACE L10 limit Indication that the RBC Field Trial operation was not contributing to the Path 66 USF for this event However, if we isolate BAs immediately adjacent to Path 66 (PACW, BPA north of Path 66 and CAISO, BANC, LDWP south of Path 66) there does seem to be an exacerbation of southbound flow on P66. Additional analysis needs to be done to determine impact of ACE of immediately adjacent BAs to the Qualified Path.

Other Observations related to RBC L10 limit went to 100 X L10 in April, 2011, and from that date forward P66 USF was lower than all previous months. There is no statistical correlation between ACE of the North and South BAs and the amount of USF appearing on Path 66 Relatively large ACE values, if aligned in a pattern with high positive ACE north of the Path 66 and high negative ACE south of the Path, will exacerbate the amount of USF on Path 66; Most of the ACE levels analyzed, however, would have been allowed under the prior BAL-001 Standard, and CPS2 performance would have been satisfactory.

Other Observations Related to RBC, Continued Path 66 Unscheduled flow annual energy totals have actually declined from 2010 to 2012

Conclusions and Recommendations to Date 1.Degree of Utilization of Path 66 was a large contributor to the increase of Path 66 USF events 2.Significant outages of several Qualified Devices eroded the effectiveness of the PST element of the Plan and drove much higher degrees of off-Path contributing schedule curtailments 3.While some instances of inappropriate execution of the UFMP occurred, this had little impact on the observed increase in Path 66 USF events 4.The Interconnection experienced considerable change in generation dispatch patterns, resulting in higher exports from the Pacific Northwest, and higher imports to California. UFAS categorizes this as a medium contributor to the increase of USF events on Path 66. Additional examination would be necessary to confirm this finding

5.The examination of the effects that the Reliability-Based Control Field Trial (RBC) had upon the Path 66 USF statistics is only preliminary at this time, yet the majority of the facts suggest that RBC is a small contributor to the 2012 Path 66 USF events. –Additional study is necessary to make a definitive conclusion –To pursue this analysis, study engineering resources would be necessary –No recommendation is warranted at this time for alteration of the RBC Field Trial based on UFAS examination of the facts

UFAS Recommendations UFAS should investigate the possibility of accelerating the return to service of key Qualified Devices under the UFMP Additional study engineering resources are necessary in order to make a definitive conclusion about the impacts of the RBC Field Trial on Path 66 USF statistics Analyses similar to that which was conducted for Path 66 is warranted for other Qualified Paths No adjustment or alteration to the RBC Field Trial is warranted at this time; however, the RC is encouraged to continue to assess ACE levels of key BAs when considering initiation or termination of UFMP steps