Setting up the Ricoh C305 Press F5 to start the Presentation

Slides:



Advertisements
Similar presentations
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Advertisements

Opening the Chassis There are two screws at the top of the system and three at the base that should be removed to enable to (Delete) removal of the rear.
Installation of. Congratulations for choose this GSM car alarm system for your car. Taking a few minutes to watch this Installation Guide and read the.
UVM CricketSat Assembly Manual. Getting Started Make a hard copy print out of the following page It will help you identify the proper components Place.
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Department of Environmental Conservation 1 DATAMAX PRINTER SETUP MODULE 1.
CricketSat Receiver Assembly Instructions This is the instruction slides for the assembly of a receiver board. It would be a good idea to review soldering.
CricketSat Assembly.
Installing a double Dreamscreen. Check measurement Left.
Optical Manufacturing Solutions 1 Probe Assembly.
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
Solder Smoke and burnt fingers Elmer Night as Skyview Line voltage and frequency meter October 25, 2011 P Pinyot.
1 Check all equipment is included before returning. If you have an accident or the equipment is damaged or you need support please contact Blaize
CricketSat LP (Transmitter) Assembly Instructions This is the instruction slides for the assembly of a transmitter board. This is the board that will fly.
Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Applied Control Systems
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Adding to your Diagnostic Station Adding to your Diagnostic Station.
2008 Cadillac CTS With Original Antenna
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Assembly Manual Mike Fortney 04/02/2006 CricketSat LC Receiver.
Digital Camera Integration Presented by: Anna Vigil Electronics Engineering Technology Colorado State University-Pueblo.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
CricketSat Receiver Assembly Manual Mike Fortney 06/26/2006.
1 Student Hands On Training I (2007) Timing Circuit & Camera Integration Timing Circuit & Camera Integration.
SpectraSonde Assembly. What is the SpectraSonde? Reads temperature, pressure, and humidity data from the atmosphere. The SpectraSonde doesn’t fly like.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
Assembling a Computer Safety Precautions CPU Installation
Get to know your WOW (Workstation On Wheels). There are 3 types of WOW’s Howard Cart SV21 SV22.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
HDD INSTALLATION AND SETUP. HDD Introduction Hard disk is the most popular storage device used to store various kinds of data in most computers. Hard.
Apeshit Mods + kitsch-bent > LEDx3 ver. 1 3/31/2011 kitsch-bent.com.
Mercury G3 Service Tool Training Overview
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Content  1 Component  2 repair instruction  3 How to define problem  4 How to repair  5 How to disassemble  6 PC part  7 Button and Ports.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco PublicNew CCNA Jianxin Tang IT 1 V4.0 Ch3. Computer Assembly—Step by Step.
Computer Disassembly and Reassembly Presentation by: James Hinton, Derrick Sartain, and Steve Evans.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
Issues with USB communication to pump box Sonya Collier Qi Zhang’s Group – UC Davis.
Connecting the Smart Board  Created in 1991, A Smart Board is an interactive whiteboard that provides a student-centered learning environment. Go!
Trouble Shooting and Smart boards
Adding to your Diagnostic Station Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
Mechanical Components and Programming Ken Youssefi Introduction to Engineering – E10 1.
BASIC ELECTION TRAINING Presented by the DeSoto County Election Commission.
Input & Output devices. Input Device :keyboard a keyboard is an input device, partially modeled after the typewriter keyboard, which uses an arrangement.
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
RockOn! RockOn! Structure Build RockOn! 2009.
Maintenance of, or to Change a faulty MCB (motor control board) 2010 models onwards.
PostBase Automatic Feeder Component Removal Service Training
Installing Branch Circuits
Input Device :keyboard Types of key switch Components of Keyboard Keyboard switches Keyboard processor or circuitry Key matrix Types of key Switches.
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
Controller Rework.
fischertechnik® RoboPro Software for Gateway To Technology® RoboPro
Installing the SIM CARD and Battery
Wiring the Light and Relay
Fin & Countertop Sample Kit Instructions
Presentation transcript:

Setting up the Ricoh C305 Press F5 to start the Presentation Click right mouse button and select “Full Screen” Setting up the Ricoh C305 This PowerPoint presentation is to help you setup up the CPI system on the Ricoh C305 series. The original R&D was based on the 301 series, however the wiring should be identical for both models. To navigate through this presentation press the “Page Up” or “Page Down” keys then press “Enter”.

I would like to show you the components that we are going to use in this installation. First we have the Optional Counter Interface, which is our key counter port. We have designed a circuit board that integrates and tracks both the ADF and glass top scanner. Together with the Key counter port they form the system’s main interface module.

There is also a reed relay and a magnet, the base components of the copier's Glass top Scanning and tracking mechanism.

The interface box, the first pair of wires wire on top are to be soldered to the ADF circuit board while the 2nd pair connect to the reed relay on the glass top scanner. The 20 pin Key Counter Port connector, and of course, the bottom one here is the 9-pin connector that attaches to the CPI system.

After you attach the Key Counter Port’s harness to the copier’s main board, you need to mount the circuit board on the interface box and secure it with these 4 screws. This unit then is placed and remains inside the copier.

This the back of the copier This the back of the copier. Here we have the interface box, the 2 cables, one is soldered to the ADF sensor and the other is connect to the relay for glass top scanning.

We are now going to work on the ADF circuit board and attach that to our Interface box.

First we have to remove the back cover to access the ADF circuit board, remove the screw

Open the glass cover and locate the 5 locking hinges Open the glass cover and locate the 5 locking hinges. Insert a screw driver and carefully pry them open.

We are now looking down on the ADF circuit board after the cover is removed. This is the board we are targeting. Remove all connecting cables from the board. Don’t worry, each is a different size and can only go in one direction. Remove the board and focus on the back of it.

This is the back of the ADF circuit board This is the back of the ADF circuit board. You have to solder the Black wire to the 3rd pin from the top right row. The Red wire is soldered to the 3rd pin below it, on the 2nd row. Polarity is important here so make sure you solder the proper pins in a clean manner and they do not contact any other pin or trace.

This is where the 2 wires we just soldered attach to the black interface box

The 2nd sensor we are going to setup is to detect scans from the glass top scanner.

This is 5 relay placed under the glass with this magnet This is 5 relay placed under the glass with this magnet. They generates a pulse each time a page is scanned.

Remove the ADF, turn it around and place it behind the copier while you are setting up the glass top sensor.

To access the scanning mechanism, locate and remove all 7 screws from the top panel.

Get the relay ready by removing the protective cover at the bottom of its double sided adhesive tape.

Scanner 1 2 3 4 5 Place the relay in the 2nd compartment to the right of the scanner, as close you can get to the scanner’s track .

Now lets get the magnet ready by removing the protective cover from its double sided tape.

1/8 ” Relay Secure the magnet to the right side of the scanner with the metal part under the white ribbon . Make sure it is level to the relay with a gap of about 1/8 of an inch.

This is how the setup should look when completed This is how the setup should look when completed. As the scanner platform slides down it activates the relay sending a pulse to the CPI system indicating a page has been scanned.

Lets get these wires routed properly to avoid being damaged when the back cover is placed. Try and guide them around these plastic pathways down to the black interface box.

This is how the back of the copier would look with the interface box This is how the back of the copier would look with the interface box. Try and place the box behind these 2 orange wires. If loose, secure it properly with soft foam or bubble wrap.

Replace the back cover. In order to guide the CPI 9-pin connector and harness out, you have to break off and remove one of the bottom notches from the back cover. When done, secure the CPI module with 4 screws drilled into the back of the copier. Make sure you do not damage any of the components during drilling.

The “Test chip” will allow you to the test the ADF and the Glass top sensors. Make sure you reduce the Fax speed to 14.4K Call Basil if you have any questions 321-622-5677