E9-1-1 in the United States An Update Kathryn Condello VP, Industry Operations CTIA 202-736-3235 Kathryn Condello VP, Industry Operations.

Slides:



Advertisements
Similar presentations
MBS WIRELESS BILLING OPPORTUNITIES Nicholas Aldi, CFO/COO Telispire Mike Chalk, MBS Manager Phil Goble, CIO.
Advertisements

+ Tips for Helping Teachers Use Mobile Devices In the Classroom Webinar- VSTE Online Presented by Charles Randolph Instructional Technology Coordinator.
Kpmg 1 Industry Consultative Group 14 July 2000 Broadband Fixed Wireless Access 40GHz BFWACG(00)36 Market and financial modelling Preliminary Findings.
What: Bringing the Latest Technology to Consumers in Washington 1 © 2014 AT&T Intellectual Property. All rights reserved. AT&T, Globe logo and other marks.
What’s Going on Behind Wireless Public Safety Solutions WELCOME!
North American Portability Management LLC 1 NAPM LLC MEMBERSHIP INTRODUCTION.
RIte Share Premium Assistance Program Then and Now Kate Brewster, Manager Employer Contact Unit Center for Child and Family Health RI Department of Human.
Washtenaw County Strategic Space Plan Recommendations November 1, 2006.
This information is current as of 11/17/2004 and is subject to change- Verizon Wireless 1 Local Number Portability.
RIMTA Shrink Wrap Recycling Program AGENDA Shrink wrap overview The Problem The Team The Challenge The Recycling Program Pilot and First Year Success Factors.
GROWTH MANAGEMENT 0 David Hutchinson Office of Policy Planning Department of Transportation Proportionate Fair Share Mitigation.
National Emergency Number Association Montana - The Last Best Place Becky Berger Program Manager.
February 19, 2008 How Should We Think About IP-PSTN Interconnection? NARUC Committee on Telecommunications.
Stakeholder meeting on the SHIFT²RAIL Strategic Master Plan Manuel Pereira, IST Lisbon ERRAC Vice Chairman 20 th June 2014, Brussels 1.
ISE eFleet Suite Software Installation Manual
Yuhana Kennedy July Hypothesis The growth of cell phone usage in the U.S. has leveled off due to the fact that even though the U.S. population will.
1 Unified Communications Survey Summary Results Market Connections, Inc. June 2007.
Review of Power Blackout on Telecom P. J
NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Book 2.final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.
1 EDRP & Smart Metering Update 4 th February 2010 Richard Westoby, Andrew Monks and Ian Lansley.
Peering, network sharing, interconnects Eckart Zollner September 2014.
King George Wireless Authority Joseph W. Grzeika Chairman King George Board of Supervisors.
AB 1331: Status of Implementation March 11, 2010 Presentation to the Children’s Committee of CWDA Contact Hannah Haley, Policy Intern, John Burton Foundation.
ISP utilisation of the 5GHz spectrum Dr A.K.Brown.
Tools of the Trade: Building the Business Case and Legacy System Integration Presented by: Jerry Keely Customer Service Administrator.
Marketing Systems Group Southern California MRA Education Seminar Presentation September 17, 2005 Privacy and Current Issues.
1 High-Level Carrier Requirements for Cross Layer Optimization Dave McDysan Verizon.
RKA ILL Implications in a Bookless Library: Needs, Strategies and Solutions Kathryn Miller 2015.
1 Energy Prices Presentation to Joint Committee on Transport and Communications 25 th February 2015.
ITS : A National and Regional Perspective Tony Kane American Association of State Highway and Transportation Officials ITS –DC DOT Workshop Howard University.
1 E-911 Services Board Meeting General Business Meeting September 8,
IHRIS: Open Source Health Workforce Information Systems Pilot Project Name Event Location - Date.
NRIC IV Focus Group I, Subcommittee 1 Year 2000 Readiness of the Telephone Industry Report 2-final 1 NRIC IV Focus Group One Subcommittee 1 Network Assessment.
1 Wireless Telecommunications Bureau Agenda Meeting January 20, 2006.
1 Overview of Wireless Service Levels in California Michael Aguilar Regulatory Analyst Policy Analysis Branch Communications Division California.
Professional Project Management Service “Bringing It All Together”  The Project Manager is responsible for the overall planning and installation of Qwest.
It Takes a Mobile Village to Raise a Mobile Child: Strategies for Improving Mobile Learning through Improved Mobile Broadband.
National Communications System Briefing Template Hurricane Isabel: Government-Industry Partnership in Planning, Response and recovery CAPT J. Katharine.
SMT Joint TDSPs AMWG 17 Change Requests Update To RMS May 6, 2014 Bob Frazier Senior Director of Electric Technology CenterPoint Energy (representing SMT.
County 911 Coordinators Group Meeting Port Canaveral, Florida May 9, 2002.
Steve Gay - GIS Manager Mid America Regional Council Kansas City, MO.
County and Municipal Solid Waste Programs in Colorado David Snapp Environmental Protection Specialist Colorado Department of Public Health and Environment.
1 Inter-Municipal Cooperation: Tax Collection/Enforcement and The Utilization of One Tax Collection System By St. Lawrence County Schools, Villages, Towns.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
NEA Requirements Update -06 version summary. Posture Transport Considerations Issue –Ability of existing protocols used for network access to meet requirements.
Non-Mobile Wireless and Broadband Connectivity for Work Group (NMW-BBC WG) RICHARD MUSCAT DIRECTOR OF REGULATORY AFFAIRS BEXAR METRO NETWORK.
1 Transmission Work Group 1 st November 2012 Gas Security of Supply SCR Proposals Credit Implications for GB Gas Market EBCC Response Summary Mark Cockayne.
Federal Acquisition Service U.S. General Services Administration GSA Reverse Auction.
The Advance of mHealth The Application of Mobile Technology in Public Health.
Regional Concept for Transportation Operations: An action plan to address transportation operations in Southeast Michigan Talking Technology & Transportation.
Traffic Management System Status Update February, 2008.
ND 911 Association Preparing for NG /24/2010.
National Emergency Number Association The Wireless Industry’s Six Principles for E-911 Fees K. Dane Snowden VP, External & State Affairs CTIA – The Wireless.
State of Florida Wireless 911 Board Winston E. Pierce, Chair Bureau of Network Operations and Deployment STATE TECHNOLOGY OFFICE Status Update for Florida.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
E911
COR1000 Telecoms Project UK Link Committee Update May 2013.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
National Emergency Communications Plan Update National Association of Regulatory Utility Commissioners Winter Committee Meeting February 16, 2015 Ron Hewitt.
Company Background  Started in 1899 in Abilene, Kansas  Originally known as Brown Telephone Company  Third largest U.S. Wireless Network Operator as.
October 4-7, 2004 Los Angeles, CA E9-1-1 In a VoIP World Timothy Lorello SVP, Chief Marketing Officer TeleCommunication Systems (TCS) (410)
The Public Safety LTE & Mobile Broadband Market: Opportunities, Challenges, Strategies & Forecasts Publisher : Signals and Systems Publication.
Budget Workshop Capital Improvement Plan Presentation on Public Private Partnership and Strategy for Municipal Complex, HWY 50, and Coast to Coast Trail.
3 rd Party Registration & Account Management SMT Update To AMWG September 23, 2014.
Mainstream Fiber Networks partnership Proposal
Preparing for the Future
Mobile Satellite Services Market
2-4B Writing equations for Parallel & Perpendicular lines
The Monitoring Association
Presentation transcript:

E9-1-1 in the United States An Update Kathryn Condello VP, Industry Operations CTIA Kathryn Condello VP, Industry Operations CTIA

Size of Phase I Effort - US 6800 PSAPs (confirmed) 9 Carriers per PSAP 61,200 Program Management Contracts to enter into Policy Implication? –Unified State PSAP Arrangement –1 State Contact for All PSAPs

Status of Phase 1 Roll-Out Approximately 2100 PSAPs in 25 States report Phase 1 service with at least one carrier. –Estimate that 40m Wireless Subscribers are covered 4Q00, 12 Million ireless Subscribers were covered by Phase 1 Value of Phase 1 Service can not be understated –Service to existing subscribers (135M) and uninitialized phones –Ability to Call-Back the Wireless User –Ability to perform 1st-level geographic screening The two most populous states have NO Phase 1

Size of Phase II Effort 112,000 Cell Sites 25% of 135M Subscribers (34M Subs) With one full work year this equates to: –424 Sites Reconfigured per Day –129,000 Subscribers Swapped Out/Day

Status of Phase II Rollout: DEPLOYED: State of Rhode Island – One Carrier St. Clair County, ILL – One Carrier BUT DID YOU KNOW? Approximately 65% of US pops (155M) are covered by Phase 2-capable switch (one carrier example) SO, WHAT’S THE PROBLEM? DEPLOYED: State of Rhode Island – One Carrier St. Clair County, ILL – One Carrier BUT DID YOU KNOW? Approximately 65% of US pops (155M) are covered by Phase 2-capable switch (one carrier example) SO, WHAT’S THE PROBLEM?

Phase 1 Issues: Does the PSAP have the money, the infrastructure and the expertise to manage and implement Wireless E 9-1-1?

Phase 1: PSAP Money 32 States collect 911 surcharges from wireless customers –The correlation between those states collecting surcharges and the implementation of Phase 1 is strong. Some states have cost-recovery for carriers in place, others do not –There is a strong correlation in the level of Phase 1 deployment in those states with cost-recovery Some states have been collecting money, but it is not clear that either PSAPs or Carriers have access to it – (See NY and CA) Some states that have been collecting money, have now “tapped into” these funds to meet other needs Some states are now requesting increases in wireless surcharges to pay for Homeland Security related expenditures

Wireless Funding of CA

Wireless Funding of NY

Phase 1: PSAP Infrastructure: Average Wireless Infrastructure: State of the Art Average PSAP Infrastructure: More than 30 years old –Signalling Network - 50 yrs old, –Transport Network - 30 yrs old, –Switching/Routing - 20 yrs old

Phase 1: PSAP Expertise: Strong reliance on 3d party support, who are already stretched thin Despite existence of wireless standards (CAS / NCAS) some States continue to pursue alternative standards (RI) Continued delays in wireline development and implementation of J-STD 36 –Continuing issues of which J-STD!

Technology and Availability Concerns The ability for the Carrier to pre-plan state, regional or national roll-out of the Phase 2 technologies is hampered by two key PSAP issues: –It is difficult to plan a coordinated roll-out when the trigger is a PSAP request Significant consumer implications if service is rolled out in one market but the adjacent market is unserved –The Phase 1 “access ramp” has not yet been installed

Summary: There has been a paradigm shift –PSAP Readiness DOT Initiative/ FEMA Initiatives –LEC Readiness There has been a paradigm shift –PSAP Readiness DOT Initiative/ FEMA Initiatives –LEC Readiness

What’s Up Next? Un-initialized Phone Issue The Effect of LNP on Unintentional Calls Priority Un-initialized Phone Issue The Effect of LNP on Unintentional Calls Priority 9-1-1

For further Information / Questions: Kathryn Condello Kathryn Condello