Page 1 Akshay Prakash Yojana… Driven by Consumer Participation.

Slides:



Advertisements
Similar presentations
1 Conservation Program Cost-Effectiveness Tests Presentation to the: Florida Public Service Commission Workshop on Energy Efficiency Initiatives November.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Electricity cost risk modelling of the Energy Conservation Scheme (ECS) for the Gold mining industry of South Africa Lodewyk van der Zee
BG&E’s PeakRewards SM Demand Response Program Successful Approaches for Engaging Customers August 20, 2014.
Load Management System
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
Home Area Networks …Expect More Mohan Wanchoo Jasmine Systems, Inc.
1 Wal-Mart’s View on Demand Response Program Design Anoush Farhangi Angela Beehler.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Reactive Power Management - Case study -- Nandan Pathak (AE)
DEMAND SIDE MANAGEMENT IN UGVCL A K Verma IFS Managing Director.
PRESENTATION PREPARED & PRESENTED BY ER. PRAKASH NAKATE. D.E.E., D.C.O.  JUNIOR ENGINEER ( Maha Discom ), Section Office, Kandgaon, Tq.Karaveer,Dist.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
MAHAVITARAN Mumbai ( 6 th June 2005 to 5 th June 2006) Performance and Future Vision.
Plant Utility System (TKK-2210)
11 MEDA ACTIVITIES IN SUPPORT Of SME SECTOR. 2 Indian Energy Scenario Source: Ministry of Statistics and Programme Implementation, GoI.
Smart Cities & Smart Utility
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Over 3,300 Megawatts and Counting Growing and Transforming One of Nation’s Largest DSM Portfolios.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
OPPD’s Sustainability Efforts Denise Kuehn. Omaha Public Power District Public Utility –336,000 Customers –2,200 Peak –Generation (2,550 MW) –Transmission.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Macro Implications of Micro-Participation: Participatory Management of Electricity Distribution in Eastern India Ashwini K Swain IPPG.
Innovative approach to DSM through Open Access Jayant Deo MD & CEO, Indian Energy Exchange
Power Line Carrier Communication based Automated Meter Reading System
Infrastructure & Cities Sector – Smart Grid Division © Siemens AG All rights reserved. October 2012Page 1 The Smart Grid by Siemens Constant energy.
Akshay Prakash Yojana A Voluntary DSM Initiative November 2005 
AFREPREN/FWD Cogen Centre Training Workshop on Cogeneration in Africa
Smart Grid Research Consortium November 9, DM Goals/Objectives User adoption & consumer engagement Prove consumer behavioral change Prove consumer.
NATIONAL CONFERENCE Department of Agriculture, BIHAR, KHARIF-2014.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Euroheat & Power 1 Boosting Innovation from Research to Market District Cooling in Europe Potential and Benefits Tomas Bruce President Euroheat.
Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.
The EnergyMizer Power Reduction & Conditioning System ®
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
Tier 2 Power Supply Planning Workshop Advanced AMI Benefits Overview.
CUBA ELECTRIC INDUSTRY
Distribution Systems-General
EXPERIENCE SHARING OF AGDSM PROJECT AT CESC MYSORE Shri M. Muniraju Chief Engineer Chamundeshwari Electricity Supply Corporation Limited (CESC), Mysore.
19.2 Domestic electricity Paying for electrical energy  Most of the electrical appliances in your home use mains electricity.  Mains electricity: alternating.
What is Voltage Optimisation? Voltage optimisation is a generic term given to the managed reduction of voltages received from a supplier down to a value.
EmPower MD Act overview and Demand Response Training EmPower Maryland.
INTRODUCTION TO DEMAND SIDE MANAGEMENT(DSM) PRESENTED TO ZAMBIA ASSOCIATION OF MANUFACTURERS ENERGY EFFICIENCY AND CONSERVATION WORKSHOP 5-6 SEPTEMBER.
- 1 - Presentation reference Demand Side Bidding - an IEA Development Project for Competitive Electricity Markets Presentation to Metering Europe 2002.
Drought Update to EXCO 08 March Learning from the Hazelmere experience This is a continuation of the effects of the drought. Lessons learnt must.
“The same way of thinking that got you into trouble won’t get you out of it.”
Established in Started by visionary Engineers & Entrepreneurs with Proven Power Electronics background. Committed to energy conservation. Made a.
NON-RESIDENTIAL ENERGY MANAGEMENT HCDE, Facilitator and DRF Industries, LLC Consultants Energy Education, Energy Cost, TDU Charges, & Demand Reduction.
Advanced Meter School August 18-20,2015 Time of Use and Load Profile Jeremiah Swann.
Effects of Harmonics on Capacitors Electrical System
RELATIONSHIP BETWEEN A T&C LOSSES And TRANSFORMER FAILURE.
Engaging Energy Consumers Energy Action, Fuel Poverty & Climate Action Conference - March 2017 Aoife MacEvilly Commissioner for Energy Regulation Regulating.
in Smart Metering Solutions
INTRODUCTION TO LOAD SHEDDING TRANSFORMER
Summer Plan: 2013 (1st March – 31st May)
Apua workshop-ABIDJAN, 9 TO 10TH November, 2017
Why AMR Which network assets are overloaded or underutilized? What is the correlation between overloading and equipment breakdown? Which areas have the.
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
Demand Response and Kootenai Electric Shawn Dolan, P.E
EET 323 – Electrical System Design Lecture 9: Grounding
Sr. Lecturer in Electrical Engg. Govt. Polytechnic,Manesar
FFC Briefing to Portfolio Committee on Energy
Program Design Demand shifting program designed to reduce peak loads on summer weekdays Program produces substantive and measurable impacts on peak demand.
The Community Energy Future
Electricity Distribution and Energy Decarbonisation
Presentation transcript:

Page 1 Akshay Prakash Yojana… Driven by Consumer Participation

Page 2 Akshay Prakash Yojana (APY) Collective Responsibility Demand Side Measures Voluntary Program for Load curtailment Voluntary supply regulations System Stability Social benefits Improved Quality of Supply Driven by Consumer Participation

Page 3 The Trigger Simple Questions by children …. Social awareness of electricity being a scarce and precious resource Long term benefits of sparing electricity for education against short term illegal uses

Page 4 Akshay Prakash Yojana Voluntary Supply Regulations TRANSFER OF LOAD FROM PEAK TO OFF- PEAK PERIOD DEMAND SIDE MEASURES Villagers not to use any 3 phase load during 1800 hrs to 0500 hrs. Only lighting load to be allowed Restrict Load during 1800 hrs to 0500 hrs. to 20% of full load Removal of illegal / inefficient heavy consumption devices like heaters, cooking heaters etc. Adopt use of energy saving lighting, pumps and other devices; Use of capacitors

Page 5 Akshay Prakash Yojana Self Monitoring PILFERAGE REDUCTION COLLECTIVE RESPONSIBILITY Formation of surveillance committees for monitoring electricity use (Veej Dakshata Committee – VDC) Removal of all unauthorized connections Gram Sabhas pass resolution to carry out above activities

Page 6 BENEFITS Akshay Prakash Yojana Consumer Benefits Elimination of unplanned load shedding Enhanced Quality of Supply Reduction in consumer complaints Consumer Benefits Optimum utilisation of power for social benefits like education, cottage industry etc. Reduction in transformer break-downs and improvement in voltage

Page 7 BENEFITS Akshay Prakash Yojana MAHAVITARAN Benefits Better load management Reduction in commercial losses System stability Organization Benefits Resulting in improved commercial and operational performance Reduction in transformer repairs and maintenance cost

… “We must help ourselves and opt for Akshay Prakash Yojana. I think this is the only alternative available with us”...“I declare a reward of Rs. 10,000 to anyone finding people misusing power in my native place. However I will ensure that the guilty party pays a penalty of Rs. 1 lakh” Devidas Pawar Vice President Shetkari Sangathana Nashik District

Page 9 Case Study of Kalvan: Bej Village SYMPTOMS REASONS Highly irregular supply for past 6 years Feeders hand tripped every mins LT and HT fuse faults at frequent intervals Highly overloaded transformers and transformer failures Heavy misuse of power 183 households but only 2 residential connections Use of electricity for cooking and heating water (Hotplate-2hp and water heater-5 hp)

Page 10 Case Study of Kalvan: Bej Village SOLUTION BENEFITS Mass movement in village to reduce theft and conserve power-Initiated by Shri. Devidas Pawar Patrols by villagers to undercover theft and misuse Adoption of metered connections by all consumers 23 villages in Kalvan adopted Akshay Prakash Yojana Partial coverage of Kalvan Taluka Uninterrupted Power for 23 Hours Facilitating education, irrigation and quality of life Maximum Load reduction from 285A to 90A for Bej & New Bej due to theft reduction Present evening load of 20A under APY Scheme

Page 11 Load Profile of Bej Feeder Pre and Post Akshay Prakash Yojana Hours

Page 12 Impact Analysis: Kalvan Division Load Profile of Kalvan Division-Typical Day Pre and Post Akshay Prakash Yojana Bej Village – Daily Units Consumed In MU

Page 13 Impact Analysis Load Profile of Sanganmer Division Pre and Post Akshay Prakash Yojana

Page 14 Impact Analysis Load Profile of Nasik Division Pre and Post Akshay Prakash Yojana

Page 15 Impact Analysis Load Profile of Nasik U/ Chadigaon Division Pre and Post Akshay Prakash Yojana

Page 16 Akshay Prakash – Kandagaon yojana

Page 17 Akshay Prakash – Kandagaon yojana

Page 18 Akshay Prakash Yojana MahaVitaran Initiatives Need for better utilisation as electricity is scarce and precious ; Educate to remove pilferage and avail continuous supply Educate Assured light load in evening peak time; Load Monitoring to ensure that demand remains within 20% Technical Support Consumer awareness programs ; advertisements, workshops, video films and school visits Communicate Recognise and Felicitate villages ; Visits by Energy Minister and MD MahaVitaran Recognition

Page 19 Thank you