Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21.

Similar presentations


Presentation on theme: "Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21."— Presentation transcript:

1 Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21 st, February, 2013. Bangalore Electricity Supply Company Limited

2 BESCOM Profile BESCOM Profile Bangalore Electricity Supply Company Limited (BESCOM) is Power Distribution Utility distributing electricity across 8 districts viz., Population Base : 2.07 Cr Consumer Base : 79 Lakhs Districts Peak Load Requirem ent (MW) Energy Require ment (MU ) Bangalore Urban 210041 Bangalore Rural 3657.13 Ramanagar 1001.95 Kolar 2755.37 Chikkaballapura 2454.78 Tumkur 4959.66 Chitradurga 2304.49 Davanagere 2905.66

3 Demand & Supply (2011-2013)

4 Energy Consumption(2011-2013)

5 For 2012-13 : Initially proposed by BESCOM: 32,193 MUs. Approved by KERC: 31,305 MUs. Consumption till date(17 th Feb-2013) : 24,576 MUs. Balance Upto end of March-2013 : 6,729 Mus( Adequate ).

6 Reasons for Shortages / Gap 1.Low Wind Energy Generation : means no ‘reserve’ available 2. Unforeseen shut downs of thermal generating units at RTPS (Raichur) : 150 MW 3.10 % Unforeseen shutdowns in CGS (Central Generating Station) share to the state : 150 MW Total Shortage of Load Expected : 300 MW

7 How BESCOM will close the GAP ? 1. Strict measures to stop illegal conversion of Single Phase to 3 Phase by IP Set owners and excess consumption [Open Delta] : 210 MW 2. Vigilance Activities : 60 MW 3. Shifting of Peak Load : 30 MW ( From 6 PM to 9 PM to beyond 9 PM)

8 Open Delta System 1. Open Delta System is a scheme which avoids illegal use of power supply to IP Sets. Thus there won’t be overloads or excess drawl from the network. 2. Effective Implementation saves 210 MW

9 Open Delta Configuration

10 Vigilance Activities : 60 MW 1. Strengthening of BESCOM Vigilance network by providing 30 additional vehicles & staff. 2. Extra Vigilance during peak hours and at night : to have check on illegal welding, lights, theft etc., 3. Both Special Vigilance Team & BESCOM Officers will be on strict vigil. Expected to do : 1500 inspections / Everyday.

11 Load Shifting : 30 MW 1. BESCOM would request consumers to shift the use of major loads like Water pumps, Geysers etc., from peak to non- peak hours ( after 10 PM) 2. BESCOMs brand ambassador Sri. Upendra will promote Conservation, and load shifting activities like above

12 Rural Power Supply Schedule during summer 8 SLOTS of 3 HRS DURATION Batches 6 am - 9 am 9 am - 12 noon 12 noon - 3 pm 3 pm - 6 pm 6 pm - 9 pm 9 pm - 12 am 12 am - 3 am 3 am - 6 am B1 Open Delta 3 Phase OFF Open Delta 3 Phase Single Phase B2 Open Delta OFF 3 Phase OFF Open Delta Single Phase 3 Phase Single Phase B3 Open Delta OFF 3 Phase Open Delta Single Phase 3 Phase 3 Phase : 3 Phase Power Supply Batches B1,B2, B3 will not have same timings, the batches will be intimated by issuing pamphlets. Single Phase: Single Phase Power Supply Open Delta: Open Delta Power supply OFF : No Power Supply

13 Reduction in Power Outages in past 5 years

14 In Case of any grievances ! Reach us 1. Online Complaint Registration Log onto www.bescomhelpline.com to register your complaintwww.bescomhelpline.com 2. 24×7 SMS Facility Just type BESCOM Subdivision code nature of complaint and send it to 92431 50000 3. 24×7 Helpline Call to BESCOMs 24X7 Customer Helpline (080-22873333)- (25 lines are there)

15 Thank You


Download ppt "Summer Plan: 2013 Summer Plan: 2013 (1 st March – 31 st May) Prepared by Mr. Mahadev, Chief General Manager, Operations Approved by Managing Director 21."

Similar presentations


Ads by Google