Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.

Slides:



Advertisements
Similar presentations
Optics, Eugene Hecht, Chpt. 8
Advertisements

Polarized 3 He Target for A1n-A J. P. Chen, June 11, 2013, Hall A Meeting Overview Design Progress Progress in target lab Progress from users.
Polarized 3 He Target for 12 GeV Experiments J. P. Chen, February 12, 2013, Hall A Meeting Introduction Target performance for 6 GeV experiments 12 GeV.
Polarized 3 He Target Lab Update Presented by Xiaohui Zhan MIT Hall A Collaboration Meeting, Dec. 14, 2007.
Polarized He-3 Target Progress Polarized He-3 Target Progress Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Yi Qiang (DUKE) HALL A Collaboration.
G2p Hall Infrastructure Alan Gavalya May Overall g2p Target on Pivot in Hall A.
Polarized Targets and Physics Program Jian-ping Chen, Jefferson Lab JLab high luminosity polarized targets workshop, June 18-19, 2010  Introduction 
Lab 09: Performance Test 1 Advanced Energy Vehicle.
SPIN
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Frequency axis calibration and the state of affairs in Team Strontium
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Linac Laser Notcher Status David Johnson Todd Johnson, Vic Scarpine, Andrea Saewert, John Sobolewski PIP Meeting March 6, 2013 Beams Doc 4306.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
SPIN 2004 Oct. 14, 2004 W. Kim, S.S. Stepanyan, S. Woo, M. Rasulbaev, S. Jin (Kyungpook National University) S. Korea Polarization Measurements of the.
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
RF Cavity / Coupling Coil Module
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
Polarized 3 He Target for 12 GeV Experiments J. P. Chen, August 15, 2012, JLab  Experiments and requirements  Target performance from previous experiments.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
May Status of FCAL Issues to be addressed at the detector review.
HAPEX III / PVDIS Targets Dave Meekins. Target List Loops – LH2 25 cm – LD2 25 cm – 20 cm Spare Solid target – Dummy tgts of correct length – Optics tgt.
PIP Update Jan Agenda Summary Update – Current Activities – Updates (Ken, Pat and John) – Additional Meetings/Notes.
Today’s topic Alignment Polarization Mechanism 1.
Laser Notcher Demonstration Experiment Dave Johnson, Todd Johnson, Matt Gardner. Rick Tesarek, Vic Sacrpine.
HERA Operation 2004 M. Bieler, -MPY- PRC, Mai Performance Improvements in Remaining Problems - Improvement Program - Schedule 2004.
The polarized target for G E n Gordon D. Cates, Jr. University of Virginia Professor of Physics and Radiology G E n, - October 24, 2003.
Proton Improvement Plan Keith Gollwitzer January 5th, 2015 All Experimenters’ Meeting 11/5/2015Gollwitzer AEM.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
PIP Update July 30 th Agenda Summary Update – Current Activities/Updates – Project Controls Update: K. Domann – Linac Lattice – Valeriy Kapin.
PIP Update April 8 th Agenda Summary Update – Current Activities – Updates (V. Kapin: Booster Collimator) – Additional Meetings/Notes.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
2  Overview Microwave Path Alignment Kit ▪ Latest Product Line ▪ Features and Functions ▪ Mounting ▪ Operation ▪ Target and Report Models for Microwave:
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
1 Labs 1 Prop-TX PA Coupler RF S W I T C H Components to be purchased Labs built 30 dB PNA Reference Input PNA RF Output RF/Attenuator Switch Controller.
EDM Engineering Issues General Mechanical Considerations EDM Cryostat Plan D ANSYS EMAG Calculations ANSYS MECH Calculations 3 June ‘03 J. Boissevain.
Taikan SUEHARA, IN2P3-KEK collaboration meeting on ATF2, Annecy, 2007/10/15 Shintake Monitor: Installation and Commissioning Schedule Taikan SUEHARA, The.
Progress of Shintake Monitor Work KEK site meeting August 26, 2009 T. Yamanaka.
PIP Update April 10 th Agenda Summary Update – Current Activities/Updates – Startup Plans – Upcoming Talks, Reports, Meetings Updates/Talks: Eliana.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
Target Lab. Update Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Transversity Collaboration.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
Preliminary result of the target polarization 2004 Kaori Kondo COMPASS target team.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Design for a New Optical Table of the Shintake Monitor Takashi Yamanaka The University of Tokyo ATF2 weekly meeting 2007/9/26.
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Progress with System Integration of the CBM Silicon Tracking Detector
G0 Detector Working Group Meeting
Diffuser status October 2017
**Density Quiz Thursday**
Fundamental Neutron Physics BL-13
FourStar 4K x 4K JHK imager
مفهوم الموازنة العامة المقدمة
Synthetic Sapphire Absorbance at 1064 nm
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Overview of Polarized 3He Target
Target Analysis for Transversity
Polarized 3He target installation
Polarized He3 Target Upgrade (Stage I) for A1n/d2n
Presentation transcript:

Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target ladder assembly holder for optics target Pick-up coil/mounts Access/safety Enclosure and viewing Optics lines (including EPR, spectra-analyzer) Reference cell support Compass mounts BB fringe field shielding/compensation

Tasks for pol. 3 He (I) Target lab: Finish spin-reversal test RF sweep water calibration EPR New oven (arrive next week) test Test new components Test new optics Test/characterize new cells

Other tasks/issues for pol. 3 He (II) Other tasks/issues: Compass Vertical coils Optical fibers Lasers Cells Budget Manpower Readiness review Milestones