Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP7 - Project Management Software Development Plan Increment.

Slides:



Advertisements
Similar presentations
Three Steps To Graphical Analysis Graphs are one of the tools of the trade for Physicists. There are three basic things you can do with a graph. 1. You.
Advertisements

1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 29.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 101.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
1 Spiral 1 Requirements Demonstrate GENI Clearinghouse & control framework in Spiral 1 projects as a central GENI concept. Demonstrate End-to-end.
Spearheading Internet technology and policy development in the African Region IPv4 exhaustion The Situation in Africa AfriNIC-9 Mauritius, 27th November.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
Quality Assurance Plan Change & Configuration Management Motorola Technology Center Italy Turin - 7/8 June, 2001.
RegNet: Cultural Heritage in Regional Networks IST Kick-off: Graz, April 2001 Clustering.
Cultural Heritage in REGional NETworks REGNET The REGNET Demonstration (Trial service) – D10.
Cultural Heritage in REGional NETworks REGNET January 2002PMG03 Barcelona – Management Issues 2 Management Issues 0ctober 2001 – January 2002.
Cultural Heritage in REGional NETworks REGNET Validation and Preparation of Demonstration – D7.
Carlo DonzellaStatus Task 2.51 Status of Task 2.5 Carlo Donzella - TINC Barcelona, 28/01/02.
Cultural Heritage in REGional NETworks REGNET Project Management and Coordination.
Cultural Heritage in REGional NETworks REGNET January 2002PMG03 Barcelona - WP7 Status 2 WP 7 - Management Task 7.1 – Project Management Project.
Cultural Heritage in REGional NETworks REGNET Implementation of the version 2 of the REGNET-Demonstrator – D8 Implementation of the version 2 of the REGNET-Demonstrator.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 T Setup of the Legal Framework and Partnership Model Best.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting
Cultural Heritage in REGional NETworks REGNET. June 2002REGNET Project 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT ICCS ZEUS VALT.
Cultural Heritage in REGional NETworks REGNET Review Meeting (REV-01-01), , Brussels.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 T1.3. IDENTIFICATION OF STANDARDS TO BE USED 1. OBJECTIVES 2.
Florence Meeting, September 2001 Regnet CULTURAL HERITAGE IN REGIONAL NETWORKS Interim Report 6.1 – Information Dissemination D 13 – Information.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Definition of supported Business Functions BUSINESS PROCESS MODELLING.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP 5 - Overview Development of a Technological Implementation.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 1: Usability Testing.
Cultural Heritage in REGional NETworks REGNET WP2: Implementation of the System and Preparation of Services and Product Generation Structure and deliverables.
Cultural Heritage in REGional NETworks REGNET REPORT OF THE STATE OF WORK OF GRANOLLERS EMERGING ART COLLECTION.
Cultural Heritage in REGional NETworks REGNET Status of Task 2.1 Project Management Group Meeting
08/06/2001ZEUS Consulting SA1 REGNET System Specification Brief introduction Kostas Giotopoulos.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 Project Management and Co-ordination Overall project status: The.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
Cultural Heritage in REGional NETworks REGNET T2.4: Business Process Re-engineering.
Cultural Heritage in REGional NETworks REGNET. 4. July 2002REV02 Luxembourg – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
Cultural Heritage in REGional NETworks REGNET. REGNET Development process.
Cultural Heritage in REGional NETworks REGNET June 2002PMG04 Sofia - WP7 Status 2 WP 7 - Management Task 7.1 – Project Management Project Presentation.
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT.
07/06/2001ZEUS Consulting SA1 Title: Work Package 1 Work Plan Status Anastasia Pagoulatou.
Cultural Heritage in REGional NETworks REGNET Den Haag Meeting (RN-PTG014) 21-22/11/2002.
Cultural Heritage in REGional NETworks REGNET Review Meeting (REV-01-01), , Brussels.
08/06/2001ZEUS Consulting SA1 REGNET E-Business Data Management Kostas Giotopoulos.
Cultural Heritage in REGional NETworks REGNET WP 4 Demonstration, Assessment and Evaluation.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET June 2002PMG04 Sofia – Management Issues 2 Management Issues January 2002 – June 2002 Reporting.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP 7 - Management Task 7.1 – Project Management Task 7.2 – Quality.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP 7 - Management Task 7.1 – Project Management Task 7.2 – Quality.
Cultural Heritage in REGional NETworks REGNET REGNET System Operation – D9.
Cultural Heritage in REGional NETworks REGNET Technological Implementation Plan – D12.
June 2006Made available under EPL v1.01 Scope of OpenUP Some slides used in discussion Mark Dickson.
CERN – BT – 01/07/ Cern Fabric Management -Hardware and State Bill Tomlin GridPP 7 th Collaboration Meeting June/July 2003.
Grade D Number – Multiplying Decimals 1. O.8 x x x x x x x x x
15. Oktober Oktober Oktober 2012.
Figures-Chapter 2.
Base view of Joystick Cam cutting grid Customer details Base contacts Additional options Pot Overview of the VCS0 cam cutting sheet.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Thirteenth Lecture Hour 8:30 – 9:20 am, Sunday, September 16 Software Management Disciplines Process Automation (from Part III, Chapter 12 of Royce’ book)
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Work Package 1 Title: ‘Analysis of the State of the Art and Development.
Sistemas de Información Agosto-Diciembre 2007 Sesión # 9.
Presentation transcript:

Cultural Heritage in REGional NETworks REGNET

October 2001Project presentation REGNET 2 WP7 - Project Management Software Development Plan Increment 1 Architecture - Validation 1st Version 04/02 10/01 12/01 Increment 2 Portal-Prototype 02/02 Increment 3 1st REGNET Version VALT MOT ZEUS

October 2001Project presentation REGNET 3 WP7 - Project Management Software Development Plan Increment 4 Implementation of Version 2 Increment 5 Changes Increment 6 Refinement 2nd Version 06/02 Release 12/02 04/02 08/02 Increment 7 Freezing 10/02

October 2001Project presentation REGNET 4 REGNET Quality Framework WP7

October 2001Project presentation REGNET 5 REGNET Quality Framework Defined steps and set Quality Goals for main activities Produced Guidelines for Preview (TB) and Q_Gate (Peer Review - Editorial Board Meeting) Addressed basic set of Metrics REGNET Configuration and Change Management Defined basic rules Configuration Management, Naming Convention and identified a tool for development phase Defined workflow, guidelines, Templates (CR – Change Request), roles and responsibility (G. CCB, WAs CCBs) for Change Management WP7

October 2001Project presentation REGNET 6 Change Management Process WP7