Updates on the Chinese Energy Sector and on the China LEAP Modeling Effort Yanjia Wang, Alun Gu, Aling Zhang EETC, Tsinghua University, China 4th Asia Energy Security Workshop 6-7 November 2006, Beijing, China
Part A: Update on the Chinese Energy Sector Yanjia Wang
Where Does China’s Energy Go? Basic facts in 2005 –Primary energy production billion tce, 10% higher than previous year; –Total energy consumption billion tce, 9.47% higher than 2004; –Coal consumption 2.14 billion ton, 11.4% higher –Power installed capacity: GW, 16.9% higher –Power generated: 2,497.5TWh, 13.82% higher –Crude oil consumption 3300 million ton, 13.8% higher –Crud oil import (net): 119 million ton, 1.4% higher –Petroleum import (net): million ton, 5.2% less –Elasticity of energy production & consumption: 0.96 –Elasticity of electricity production: 1.24 –Elasticity of electricity consumption: 1.22
Where Does China’s Energy Go? Macro control effected, but still a long way to go Elasticity of energy consumption Elasticity of electricity consumption Growth of crude oil import (net)--33.4%41.4%1.45% Growth of oil products import (net) %83.6%-33.9% Commissioned power capacity50GW66.7GW Total energy consumption growth rate 6.0%15.3%16.1%9.5%
Coal Plays Dominate Role Continuously Energy ProductionEnergy Consumption Year Coal Oil NG Elec
Power Industry YearCapacity/GWShare/% TotalThermalHydroNuclearTotalThermalHydroNuclear Wind 1.26GW PV 15MW
New Constructed Power Plant (10 4 kW)
??? ENERGY EFFICIENCY IN CHINA
Renewable Energy Law Effected on Jan. 1 st 2006 NDRC issued a document for pricing renewable energy for power generation on Jan. 4 th Biomass for power tariff = coal-fired tariff (including deSOx) yuan/kWh for 15 years Wind power: tendering price and lowest bidder’s price PV, geothermal, wave..: project based approval price
20% Energy Efficiency Target National 11 th Five-Year Plan( ): Energy intensity of GDP will decrease about 20% within 5 years. Give a quantified target on energy efficiency for the first time in five-year plans Divide total target to provincial, large industrial group, city, large energy consumers’ target to implement.
Tremendous Efforts Must be Made on Energy Efficiency Improvement GDP Annual Growth Rate ( ) (%) Total GDP Growth during 2006 to 2010 ( Times ) Energy Elasticity ( Government anticipation ) ( average ) ( growth rate of 2005 ) ( GDP double within 5 years )
Three Gorge Hydropower Fully Operate for the First Time 14×700MW generators fully operate on Oct ×700MW generators commissioned on Sept The first generator commissioned on July ×700MW generators will commission by the end of 2008 Sluice will reach designed level meter Water level before 156 meter (bottom) (taken on Aug. 8 th 2006) Water level reached meter (top) (taken on Oct. 22, 2006)
40GW Nuclear Power by 2020 First phase in Tianwan, Russian Pressed Water Reactor, being built. First and Second Phases in Qinshan, domestic Pressed Water Reactor, operating; The third phase in Qinshan, Canadian Heavy Water Reactor, being built; Sanmen, 6GW, domestic Pressed Water Reactor Yangjiang, authorized, technique to be chosen. Daya Bay, Ling’ao, French Pressed Water Reactor, operating Yangjiang 6GW, 2012 finished ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ ☆ Northeast Beijing North China Northwest Southwest East China Central South Weihai, 195MW Domestic Gas cooling reactor, Another two plants in Rongchen, Hai Yang are under planning Hongheyan 2GW, 2011 finished
Operated Nuclear Power Plant List
Qinshan I
Qinshan II
China Vice Primary Minister and Canadian Primary Minister attend the creamery of Qinshan III commissioned Qinshan III 2×700 MW US$2.88 billion
Daya Bay
Location of Nuclear Power Plants in Asia
Part B:China LEAP Modeling Effort
Basic assumptions Base year: 2000 (2005) Target year: 2030 Dataset: AES2005 LEAP2006 (slow calculation) Three scenarios: BAU, NAP,RAP Check inputs and outputs of base year (finish) GDP adjustment in 2004
The construction of new socialist countryside in China Narrow the widening gap between rural and urban China Improve agricultural production, living standards and public administration in the rural areas Rural facilities will be improved Rural consumption structure will be changed
Wind power industry update Wind power installed capacity in 2005: 1.26GW, increment: GW (39%) Localization of 70% Initial investment: yuan/kW In 2020, wind power installed capacity: 30GW (finish)
CDM projects in China CDM projects will decrease the operation cost in power industry in China (doing) Emission factor in China: about 0.8 kgCO2e/kWh(coal-fired) CERs (Certified emission reductions): US $ 10/tCO2e Emission reduction benefits: 0.064yuan/kWh Average electricity tariff: yuan/kWh
Nuclear power scenarios in China
Nuclear
Adjustment
Ongoing Transport sector (substitute fuel development) Renewable energy development in China: renewable energy power plants…......
Thank you!