Community Managed Project approach Arto Suominen CTA/COWASH/MoWE/Ramboll.

Slides:



Advertisements
Similar presentations
Community Managed Project approach: an opportunity to improve the ownership in fluoride mitigation in Ethiopia Arto Suominen CTA/COWASH/MoWE/Ramboll GeoGen.
Advertisements

Water Integrity Forum, Delft June 5th 2013 Community Managed Project (CMP) approach: an opportunity to foster integrity in rural WaSH Experience from Ethiopia.
Water policy development in Uganda
Leveraging Community Capacity Financing Civil Society at the Local Level World Bank-InterAction Workshop Samantha de Silva, HDNSP March 02, 2006.
1 programme Management structure 2 Finn WASH-BG Programme fund 3 Fund request 4 Fund flow channels 5 Fund management 6 Bank accounts 7 Financial reports.
Planned FTF Projects to be launched in 2012 May 3, nd Quarterly Feed the Future Partners Coordination Meeting.
DEPARTMENT OF TRADE AND INDUSTRY INCREASING ACCESS TO FINANCE.
Presentation of the workshop results to the plenary session A) Strengthening rural entrepreneurship by connecting the local production with other economic.
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
Protection of Basic Services in Ethiopia The World Bank May 2006.
Key lessons learned on the CDD experience Towards a renewed CDD approach.
Rwanda Flora wishes you A Happy Valentine’s Day!.
Promoting Energy Efficiency In Buildings in Developing countries.
Mauritania MTEF Workshop Water and Sanitation Sector MTEF Experience in Uganda.
Kampala, Uganda, 23 June 2014 E-Waste Management in Uganda Michael Ocero, Acting Commissioner – IT Dept. Ministry of ICT ITU Regional.
E-Waste Management Policy and Strategy in Uganda
Industrial Standards Framework and Energy Management Aimee McKane, Lawrence Berkeley National Laboratory.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
Ontario’s Local Food Strategy Waterloo Region Food System Roundtable March 13, 2014.
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Global Project “Models for Implementing Multiple-Use Water Systems for Enhanced Land and Water Productivity, Rural Livelihoods and Gender Equity” Or “The.
Salvatore Zecchini Chairman OECD WP SMEE. Most governments are trying to promote entrepreneurship and SMEs The MENA region is no exception In Saudi Arabia.
INSTALLATION OF CAPACITOR BANKS IN COMMERCIAL/INDUSTRY BUILDINGS African Regional NAMA Workshop Kigali, Rwanda, 2015 By: Kennedy Amankwa, Energy Commission,
Department of Transport October 2007 Women in Transport Seminar Consolidated Action Plan Report.
«Проект по экономической реабилитации и построению мер доверия» Integrating interests and institutions in water resource management 25 th June, 2013 Eng.
Roles & Functions of the three levels of Rural Local Government in WATSAN Programme Arvind kumar REGIONAL WATSAN COORDINATOR B-TAST ( DFID- SWASTH)
Training of Trainers Integrated Water Resources Management Enabling Environment and Institutions.
Project Overview, Objectives, Components and Targeted Outcomes
Ethiopia Promoting Basic Services Social Accountability Program
INITIATING THE PLANNING PROCESS. CONTENT Outputs from this stage Stage general description Obtaining government commitment Raising awareness Establishing.
ILO Management of Training Institutions Workshop Flexible Training Delivery Trevor Riordan ILO Senior Training Policy Specialist.
1 Rights based rural development in practice 6 years of experience Chia sẻ Vietnam - Sweden.
Ministry for Women, Youth, Children and Persons with Disabilities.
Christopher Sheldon Senior Mining Specialist Mining Policy Division The World Bank Group Integrating Local Economic Development into World Bank Mining.
Community-Driven Development: An Overview of Practice Community Development Strategies – how to prioritize, sequence and implement programs CommDev Workshop.
Yemaneberhan Taddesse.  PASDEP(plan of accelerated and sustainable development for the Eradication of poverty) Poverty reduction strategy is the main.
Value Chain Financing for Agriculture and Rural Enterprises Conference Land Bank of the Philippines 12 April 2011 Department of Finance-National Credit.
MiniGrid Group NEP Off Grid Electrification Breakout session.
Water Supply and Sanitation in Sub-Saharan Africa Activities, Strategies and Lessons Learned of German Development Cooperation.
FARM Africa/SOS Sahel Ethiopia Strengthening Sustainable livelihoods and Forest Management Over view of the program April 6, 2013 Bahir dar.
South-South cooperation in IFAD’s business model October 2011 Ninth Replenishment of IFAD’s Resources.
DEVELOPMENT COOPERATION FRAMEWORK Presentation by Ministry of Finance 10 December 2013.
Capacity Building by the three International Metal Study Groups UNCTAD Workshop, Bangkok, September 2001 by: Ian Burrell ILZSG N ON -F ERROUS M ETALS C.
1 FAO REGIONAL WORKSHOP ON RICE AND AQUACULTURE FOR PRODUCTIVITY INCREASE AND MARKET DEVELOPMENT IN EAST AFRICA, KAMPALA,UGANDA, APRIL 2009 AQUACULTURE.
Country Partnership Strategy FY12-16 Consultations with Civil Society The World Bank Group June 2, 2011.
GEF-Assisted Integrated Ecosystem Management Project In The Trans- Boundary Areas Between Nigeria and Niger Republic.
An integrated segmentation approach to sanitation markets and financing March 19, 2009.
Urban Group Presentation. Commitment and Leadership Legislate Policies Increase Allocation Sanitation Champions at different levels Sanitation as a separate.
AU/UNIDO/Brazil High-Level Seminar on Biofuel.  Policies are required to reflect the country’s development vision for the sector  Required to establish.
1 Jakarta, May 12, 2009 OPENING AND KEYNOTE SPEECH MINISTER OF PUBLIC WORKS REPUBLIC OF INDONESIA MINISTRY OF PUBLIC WORKS INDONESIAN-DANISH WATER DAYS.
The EU Water Initiative and the EU ACP Facility New Instruments to promote sustainable development of water resources and affordable access Antonio Garcia-Fragio.
FINANCIAL SUSTAINABILITY OF WSPs: Overcoming the Barriers Eng. PETER NJAGGAH WASREB, Kenya Innovative Water Sector financing.7 th – 12 th November 2011,
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Energy Efficiency Opportunities for Manufacturing Industries
Overall Objectives of NAMA
4/29/2018 NDA STRATEGIC PLAN AND ANNUAL PERFORMANCE PLAN PRESENTATION TO THE PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 3 MAY 2017 MRS THAMO MZOBE CHIEF.
REFLECTED IN JAMAICA’S ENERGY POLICY
Bangladesh access to sanitation
Housing Development Program (HDP) in Ethiopia
Transform WASH Public Private Collaboration Sanitation Marketing
11/18/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY PORTFOLIO COMMITTEE – 02 MAY 2018.
The SWA Collaborative Behaviors
12/5/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY Select COMMITTEE – 19 June 2018.
EU CSF FUND II Project Launching Workshop
The UBSUP/SafiSan Programme
Patrick Mwangi & Japheth Mbuvi May 24, 2004
Rural Partnerships between Small Farmers and Private Sector
Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO
Pillars of Performance
Collaborative Incubation Model (CIM) Natalie Nasseri
Presentation transcript:

Community Managed Project approach Arto Suominen CTA/COWASH/MoWE/Ramboll

What the Policy and Strategy Says? Promote the development of water supply on participation-driven and responsive approaches without compromising social- equity norms. CMP works based on the community initiative, community-led principle

More policy and strategy quotes…. Create and promote a sense of awareness in communities of the ownership and their responsibilities for operation and maintenance of water supply systems The CMP has proved that the functionality of the water supply is high due to the high ownership

More policy and strategy quotes…. Ensure self-reliance, through the promotion of local self-financing of programs and projects, based on the overall socio-economic development conditions of local communities, and through appropriate incentive mechanisms. Engage the participation of banks, private operators, micro financing institutions, national water fund, and rural credit services, etc.

Provide incentives to local stakeholders such as community groups, manufacturers, and consulting firms etc. in terms of concessions in import duties, tax rebates, subsidies, credit facilities and through other similar economic instruments to encourage their participation in the planning, design, implementation and management of WSS systems More policy and strategy quotes….

Introduction… CMP approach Approach tested for 9 years in two regions in Ethiopia Approach expanded to 5 regions by now Over 8,000 water schemes implemented (2,5 million rural users) in 5 regions of Ethiopia Functionality rate close to 98%

Joint report of MoWE ad MoFED January 31, 2010 Open a serious dialogue with relevant WASH development partners for the adoption of CDF as a funding mechanism. There is no time to waste, as the sector is falling behind schedule to reach the UAP targets by 2012 Amhara and Benishangul-Gumuz regional governments should be urged to take immediate steps to scale up the CDF in their regions.

Statement by MoFED Jan 31, 2010 on Compatibility with Government Procedures: It was established that GoE procedures are effectively used in CDF. Outsourcing fund transfer management to a financial intermediary (ACSI) was not perceived to pose a regulatory problem for scaling up and/or replication in other regions.

Statement by MoFED Jan 31, 2010 on Quality and Fiduciary Controls: The participants found that the Woreda and community level control mechanisms are not only sufficient but effective. Also, it was found that with minor modifications to the existing CDF procurement and financial manuals it can be mainstreamed with the government procedures.

Business as usual Donor GoE Supplier or service provider Construction Community Handing over Poor ownership as the community considers that the constructed system is not theirs

Main principle of CMP Donor GoE Community Supplier or service provider Construction Hi community participation, high ownership and high functionality rate

What is community management? A.The community is managing the whole project (not managed by the district, zone or region) B.The community management includes 1.Making the application (expressing the demand) and providing up-front cash contribution 2.Signing of agreement with the supporting financier 3.Procuring all materials, equipment and services 4.Managing the construction/rehabilitation 5.Managing the project finance (own contribution and external support) and administration 6.Controlling the performance (operation and maintenance, social/public audits)

Why Community Managed Project approach? Increased ownership Improved functionality Increased O&M capacity (supply chain) Increased job opportunities at local level Increased women empowerment (leadership) Efficient use of available district capacity (redirecting district capacity for facilitation from implementation) Increased implementation efficiency (faster and cheaper, less wastage of materials) Enhancement of local banking sector

What is needed to make community management possible? Materials and equipment Technical support Financial support Institutional support Enabling environment Capacity building support M&E

Fund flow options in CMP Donor BoFED MoFED MFI Sector Bureau Regional Government WoFED CMP project managed by WASHCO Procurement by WASHCO Community contribution

Why MFI? Flexibility due to the buffering capacity O&M savings in MFI (up-front cash contribution or “community’s matching fund”) Personal savings in MFI MFI has better outreach than normal banks MFI is community focused (it’s main mission) Easy to access by rural people Credit facility For MUS For commercial credits (Micro banks) Micro insurance development for O&M Shared CMP and credit promotion

Main partners in CMP in Ethiopia

Thank You