SAFER WP6: Dissemination of Results and End-Users Interface Lead Partner NOA, Athens Contributing partners: GFZ, AMRA, Cedim AG and all partners.

Slides:



Advertisements
Similar presentations
SAFER Seismic EArly Warning For EuRope Seismic Early Warning
Advertisements

1° Transnational Workshop – Rome 3rd- 4th February PROJECT WEBSITE AND PROJECT GRAPHIC DESIGN 1.
Science and Policy Integration for COastal Systems Assessment
Participants: all ORFEUS/KNMI, INGV (IT), NERC(UK), UIB(NO), GFZ(GE), NIEP(RO), ETHZ(CH), VUA(NL), IMO(IC), TUBITAK(TU), CSIC(ES), IST(PO), NOA(GR), UU(SE),
Audit. Types Scheduled Audits Programmatic Assurance >Field Monitoring, Annual Reviews Reviews of Partners Financial Records > Spot Checks > Special Audits.
Cultural Heritage in REGional NETworks REGNET Information Dissemination.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC.
Cultural Heritage in REGional NETworks REGNET. October 2001Project presentation REGNET 2 Task 1.7: Identification of Market segments and User groups WP1:
Cultural Heritage in REGional NETworks REGNET. July 2002Project presentation REGNET 2 WP6 – Dissemination AIT ONB SR IMAC SUL TARX MUS MOT SPAC CC IAT.
SEM11-06 Committee procedures ETSI Seminar © ETSI All rights reserved.
Contents of the EHES Joint Action Hanna Tolonen EHES JA Kick-off meeting, 21 January 2010, Luxembourg.
The DRIVER Infrastructure (Digital Repository Infrastructure Vision for European Research) Paolo Manghi ISTI - National Research Council, Italy.
EVIMAR The European Virtual Maritime Institute Bruxelles, Erik Styhr Petersen, R&D Manager, DMI.
Near-Field Tsunami Early Warning and Emergency Planning (NEARTOWARN) contract n /2011/614039/SUB/A5 Kick-off meeting of the projects funded after.
1 NECOBELAC Project WORK PACKAGE 3 Cross-national advocacy infrastructure.
From AgentLink II to AgentLink III Co-ordinators: Peter McBurney, University of Liverpool, UK Terry Payne, University of Southampton, UK.
IST Open, self organising repository for scientific information exchange - SciX Žiga Turk University of Ljubljana, Slovenia
Presented by Brad Jacobson The Publisher on the Web Exploiting the new online sales channels.
Chapter 3 Memory Management
AceMedia dissemination and awareness February 2006 Paola Hobson, Motorola Labs, aceMedia co-ordinator.
The “Knowledge sharing platform” in the 6th EC FP Initial training for National Contact Points Brussels 30th October 2002 by Belmiro MARTINS,
TG Projects status Nikos Houssos euroCRIS membership meeting Madrid, November 2012.
PRACE – The European HPC Infrastructure Liz Sim (EPCC) PRACE WP6 Operations – User Services Subtask Leader.
IST Open, self organising repository for scientific information exchange - SciX Žiga Turk University of Ljubljana, Slovenia
SAFER Seismic EArly Warning For EuRope Introduction to the 1st year`s meeting and project management (WP1) progress report Athens, 27 June Jochen Zschau,
Slide #1 of 16 / {ESC} Return to Main Menu / F1 Help PCS Schedule “The NEXT Generation of Parish Software” Archdiocese of Los Angeles PCS Parish Computer.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
I I Eli Keren Vice President of Sales and Marketing Miami Partner Conference, August 2011 Marketing.
1WP6 - Dissemination & OutreachPresenter initials DEWS - Distant Early Warning System WP6: Dissemination & Outreach Helmholtz-Zentrum Potsdam Deutsches.
SIBYL SeIsmic monitoring and vulneraBilitY framework for civiL protection.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
RUP Fundamentals - Instructor Notes
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
TEMPUS INFO DAYS SARAJEVO 7 JUNE GUIDE FOR APPLICANTS 2005 What’s new in Tempus ? Tempus.
E-PreS: Monitoring and Evaluation of Natural Hazard Preparedness at School Environments Stathes Hadjiefthymiades National Kapodistrian University of Athens.
Work package 7 Dissemination and Concertation EuropeanaConnect Plenary Meeting Berlin, May 2010 Monika Segbert, Eremo srl.
WAY FORWARD AND THE ROLE OF THE REGIONAL CENTER ON HEALTH IMPACT ASSESSMENT Regional Center for Air pollution Impact on Health Department of Occupational.
© 2010 VMware Inc. All rights reserved vSphere 4.1: Install, Configure, Manage.
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
Jean-Michel Courades, DG AGRI F3 European Rural Development Network
EGEE NA3 Status Prof. Malcolm Atkinson Director John Murison Training Manager CERN 14 th January 2004.
> 1 The information system of the ENGINE co-ordination action, Launching conference, Orléans, France, 15/02/2006 The information system of the ENGINE co-ordination.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Project management and executive planning of activities Управление проектом и планирование выполнения работ М.А. Коробейникова Marina Korobeinikova Life.
REAKT Strategies and tools for Real Time Earthquake Risk Reduction WP8: Dissemination Sandra Laskowski, Friedemann Wenzel (KIT) REAKT - 1st Annual Meeting,
1 Emergency Managers Weather Information Network in the GOES-N Era: a Status Report Satellite Direct Readout Conference for the Americas Miami, Florida.
Implementation recommendations 1st COPRAS review Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels Bart Brusse.
Steering Committee Meeting, Bologna, 10th February 2006 e-PRODAT European Data Protection Best Practices in e-Government Services e-PRODAT European Data.
Grant n° FP  Duration: 3 years  Type: Collaborative research project  Funding: ◦ Budget: € ◦ Funding: € ◦
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
RISKS CONSORTIUM Seismic and volcanic risks Ciência 2010 Lisboa, 5-6 Julho, 2010.
Kick Off Meeting Largs, Scotland
QALIBRA - Introduction
Dr. Stelios Panagiotou, Dr. Stelios C.A. Thomopoulos
Interactive risk assessment with the OiRA tool
PMC – The project progress and work-plan
HyTEC: Hydrogen Transport in European Cities
Dr. Stelios Panagiotou, Dr. Stelios C.A. Thomopoulos
Civil Protection Financial Instrument – Prevention Projects
From AgentLink II to AgentLink III Co-ordinators: Peter McBurney, University of Liverpool, UK Terry Payne, University of Southampton, UK.
We’re giving away software Scott Druery
PMC – The project progress and work-plan
WP5- Communication and Dissemination WP Leader: S-com
Dr. Popi KONIDARI Assistant to the Project Coordinator
Монголын даатгалын зах зээлийн бодлогын асуудлууд
Presentation transcript:

SAFER WP6: Dissemination of Results and End-Users Interface Lead Partner NOA, Athens Contributing partners: GFZ, AMRA, Cedim AG and all partners

WP6.1:Dissemination of results Establishemnt of a web site structured and managed by AMRA ( Steadily updated Currently there are 30 SAFER publications, expected to increase 20 presentations 15 technical articles A long-number of deliverables in the reserved area

WP6.1:Dissemination of results Production of an informative SAFER brochure. Preparation of a special booklet about the main achievements in the 5 test-areas. Schedule to publish a special book on seismic early warning, of international standards (Springer), based mainly on SAFER results.

WP6.2:Interface with end users Creation of an End Users Group (EUG) with representatives from the SAFER test- sites EUG special meetings and discussions organized within the frame of the annual general SAFER meetings Production of a special report about the status of civil protection as regards seismic early warning (prepared by NOA).

WP6.3: Production of a Dynamic Decision Support Module: DDSM General software frame of a DDSM for scenario simulation and rapid response (Cedim AG) In detail test and assessment of the DDSM`s operational capabilities for at least one of the above cities (CedimAG): the Cairo case

WP6.4: Synergy with other EU funded projects Contineous update and contact with other relevant EU projects running in parallel to SAFER. Representatives attend SAFER and vice- versa EU-Projects: NERIES, TRANSFER, SEAHELLARC etc. USA-Project: CSEP (SAFER WP5).