1 PMC – The project progress and work-plan
Siniša ILIĆ Madrid, UPM, Faculty of Technical Sciences, University of Priština in K. Mitrovica

2 The list of deliverables
The deliverables are listed in the Logical Framework Matrix in the Document (detailed project description)

3 WP1(PREP): Analysis, consulting and training
1.1 Report on analysis of EU master study programmes (MSP) [1XA + 1XV] (1) 1.2 Report on analysis of WB MSP [1XA + 1XV] (1) 1.3 Report on comparative analysis 1 (1) 1.4 Study Visits reports [4 visits] (2) 1.5 Consulting with the partners from the business (MoM) [6 WB consultations] (3) 1.6 Teachers trained [12 teachers trained] (4)

4 WP2(PREP): Preparation of Infrastructure
2.1 Hardware purchased [Equipment registered in Inventory] (5) 2.2 Software purchased 2.3 Literature purchased 2.4 Trained staff for equipment use (?) 2.5 Laboratory set up [7 labs Set up] (6) 2.6 Teaching materials designed [1 TM per course] (7) 2.7 Methodological instructions for teaching developed (Provided by UL) 2.8 Methodological instructions for students’ practice developed (To be prepared)

5 WP3(DEV): Creation of new curriculum for AcMS
3.1 Principles & model for AcMS developed 3.2 Teachers' competencies & learning outcomes developed 3.3 New curriculum for AcMS developed [printed book of cirriculum] (8) 3.4 Book of curriculum for AcMS printed [printed book of AcMs cirricula] (9)

6 WP4(DEV): Creation of new curriculum for VocMS
4.1 Principles & model for VocMS 4.2 Teachers' competencies & learning outcomes developed 4.3 New curriculum for VocMS developed [printed book of cirriculum] (8) 4.4 Book of curriculum for VocMS printed [printed book of VocMs cirricula] (10)

7 WP5(DEV): Introduction of AcMS and VocMS curricula
5.1 Students enrolled to AcMS [number of students enrolled to AcMs] (11) 5.2 Students enrolled to VocMS [number of students enrolled to VocMs] (12) 5.3 AcMS and VocMS introduced 5.4 Report on level of success of the new MSP 5.5 Report on students' feedback 5.6 Students' practice with business partners [At least 1 protocol on students internships signed] (13) 5.7 Lectures by experts from business held -> Report

8 WP6(QPLN): Quality Management
6.1 MoM [6 minutes of the Quality Board meetings] (14) 6.2 Adoption of the quality control plan 6.3 Report of the external expert [1 external report] (15) 6.4 Report of internal experts [2 internal reports (Report from Shahab & Slobodan] (16)

9 WP7(DISS&EXP): Dissemination
7.1 Promotion on internal meetings in partner institution [at least 2 planned per partner institution] (19) 7.2 Web site developed and published [number of visits] (18) 7.3 Promotional material produced [report on marketing material] (17) 7.4 Report on the project promotions in HEI visits ???

10 WP8(DISS&EXP): Sustainability
8.1 Accreditaion approved -> report on accreditation 8.2 Creation of Academic sustainability plan (20) 8.3 Creation of financial sustainability plan (20) 8.4 Protocol between HEIs and relevant stakeholders signed [at least 1 long-term agreement] (21) 8.5 Letters of support [at least 1 letter of support] (22)

11 WP9(MNGM): Management 9.1 Steering Committee MoM [6 MoM] (23)
9.2 PMC MoM [12 MoM] (24) 9.3 Development of guidelines on the project management and reporting 9.4 Interim Report submitted (25) 9.5 Final Report submitted (25)

12 Thank you for your attention