Presentation is loading. Please wait.

Presentation is loading. Please wait.

Civil Protection Financial Instrument – Prevention Projects

Similar presentations


Presentation on theme: "Civil Protection Financial Instrument – Prevention Projects"— Presentation transcript:

1 Civil Protection Financial Instrument – Prevention Projects
Knowledge Platform for assessing the costs and benefits of flood prevention measures

2 Project Identity Beneficiary: SIGMA Consultants Ltd (GR) Partners:
1. Middlesex University Higher Education Corporation, Flood Hazard Research Centre (UK) 2. National Institute of Hydrology and Water Management (RO) 3. Research Centre for Geography and Regional Planning, Universidade Nova de Lisboa, (PT) 4. University of Kassel (GE) 5. Universidad Pablo de Olavide (ES) Starting date: / Ending date: Total Budget = 585,000€ / EC contribution = 438,750€ (75%) 2/12

3 The need Project Policy Area The Need
Actions assessing the costs and benefits of risk prevention measures. The floods incidents in the EU member states have demonstrated that the cost of flood damage can be enormous, and might even increase in the future due to climate change. Decision makers, such as Local Administration Authorities, can base their decisions regarding the planning and implementation of flood prevention measures on Cost-Benefit analysis studies. Within the framework of the 2007/60 Floods Directive it is asked that Flood Risk Management Plans shall take into account relevant aspects such as costs and benefits, especially for trans-boundary river basins. The Need 3/12

4 Objective The Project intends to
FLOOD-CBA project aims at establishing a sustainable Knowledge Platform for the use of stakeholders dealing with the cost-benefit analysis of flood prevention measures in the context of different socio-economic environments within the EU. The Project intends to Facilitate the collection, assessment and the exchange of information amongst stakeholders and provide overview and detail on current models and best practices; Consolidate the methodology and data sources and enhance the comparability of results of Cost-Benefit Analysis; Strengthen the performance of the existing prevention mechanism especially in the project participating countries; Promote the transnational cooperation of competent bodies all over Europe. 4/12

5 Tasks Task Management and Reporting to European Commission
(Organizational Set-Up, Internal monitoring and evaluation, On-going Project Management, Quality Management & Assurance ) Building the Stakeholders’ Capacity (Development of a Peer to Peer Network, Collection of background Information, Assessment of stakeholders 'needs) Improving the Process of Knowledge (Development of common characterization framework, Set up of the knowledge base platform, Creation of support tools) Implementation of Pilot Activities (Training of stakeholders, FLOOD-CBA Exercise Test, Operation of FLOOD-CBA Helpline) Information, Dissemination and Capitalization Actions (Compilation of Communication and Dissemination Handbook, Information and publicity actions at regional/ national level, Information and publicity actions at EU and International level, Capitalization measures and Follow-up Activities) 5/12

6 Main deliverables and deadlines (1)
Task 1 02/2013 Project’s Monitoring and Evaluation System 03/2013 Quality Handbook 08/2013 1st Progress Report 04/2014 2nd Progress Report 12/2014 Final Report Seven Coordination Meetings Task 2 03/2013 Consultation Plan 04/ 2013 Stakeholders’ Questionnaire for the consultation process 07/ 2013 Information Exchange Network – List of members Report on Stakeholders’ views 6/12

7 Main deliverables and deadlines (2)
Task 3 10/2013 Common Characterization Framework 12/ 2013 Knowledge Base Platform 02/ 2014 Guidelines for the implementation of a Cost Benefit Analysis 07/ 2014 Guidelines for the presentation of other assessment methods of flood prevention measures Task 4 07/2014 Training seminars, one in each participating project country 06/ 2014 On line questionnaire on the operation of the FLOOD CBA Platform 07/ 2014 Results of answered questionnaires 08/ 2014 FLOOD CBA Helpline Centre 11/ 2014 Report of improvements for the operation of the Helpline Center 7/12

8 Main deliverables and deadlines (3)
Task 5 02/2013 Communication and Dissemination Handbook 03/ 2013 Project Website 08/ 2014 Books of Guidelines 10/ 2014 Booklet of the project achievements Capitalization Plan 12/ 2014 Exploitation Agreement Layman’s Report Articles and Newsletters Informative material 8/12

9 Major events 21-22/02/2013 1st Coordination Meeting in Thessaloniki
05/ 2013 2nd Coordination Meeting in Oxford 09/ 2013 3rd Coordination Meeting in Bucharest 12/ 2013 4th Coordination Meeting in Lisbon 04/ 2014 5th Coordination Meeting in Kassel 09/ 2014 6th Coordination Meeting in Seville 12/ 2014 7th Coordination Meeting in Thessaloniki (final) Six informative workshops, one in each participating country 07/ 2014 Six training seminars, one in each participating country Final conference in Thessaloniki 9/12

10 Follow-up Activities (1)
Development of a Capitalization Plan for the definition of the exploitation strategy Participation of the project partners in other networks and international events Set up of an Exploitation Agreement among the IEN members in order to facilitate and oversee the exploitation activities Maintenance of the FLOOD-CBA website for at least 5 years after the end of the project 10/12

11 Follow-up Activities (2)
The maintenance and enrichment of the knowledge base with updated information Operation of the FLOOD CBA Portal that will provide search and navigation functionalities to information sourced by the knowledge base and will certify the interactive communication of project partners with existing and new stakeholders Establishment of the FLOOD CBA Forum that will pursue new collaborations, coordinate new projects and provide technical support and know how experience 11/12

12 Communication with FLOOD CBA consortium
FLOOD CBA Website: SIGMA CONSULTANTS Ltd Tel 12/12


Download ppt "Civil Protection Financial Instrument – Prevention Projects"

Similar presentations


Ads by Google