Test and Test Equipment July 2011 San Francisco, California Dave Armstrong ITRS 2011 Test and Test Equipment – San Francisco, CA.

Slides:



Advertisements
Similar presentations
18 July 2001 Work In Progress – Not for Publication 2001 ITRS Test Chapter ITRS Test ITWG Mike Rodgers Don Edenfeld.
Advertisements

IRC Roll-Out/Plenary 4/4 Technology Node identified by xx90 –Minimum Half-Pitch of Metal 1 of either DRAM or Logic –Logic node presently being represented.
Key Trends High frequency serial interface data rate is scaling significantly faster than tester capability to test them High frequency (analog and digital)
RF and AMS Technologies for Wireless Communications Working Group International Technology Roadmap for Semiconductors Radio Frequency and Analog/Mixed-Signal.
ITRS Test TWG Don Edenfeld April 20 th, 2004 Spring Workshop - Stressa, Italy.
ITRS 2010 Test and Test Equipment – San Francisco, USA Test and Test Equipment July 2010 San Francisco, USA Roger Barth - Micron ITRS Test TWG.
Test TWG Spring Workshop - Koenigswinter, Germany Test TWG Spring ITRS Workshop Attendees: Mike Rodgers Prasad Mantri Roger Barth Wataru Uchida.
1 PIDS 7/1/01 18 July 2001 Work In Progress – Not for Publication P. Zeitzoff Contributors: J. Hutchby, P. Fang, G. Bourianoff, J. Chung, Y. Hokari, J.
July 13, 2010ITRS public conference – San Francisco1 More-than-Moore Roadmapping Update.
July 12, 2012ITRS public conference – San Francisco1 More-than-Moore Roadmapping Update.
ITRS Design ITWG Design and System Drivers Worldwide Design ITWG Key messages: 1.- Software is now part of semiconductor technology roadmap 2.-
ITRS Roadmap Design + System Drivers Makuhari, December 2007 Worldwide Design ITWG Good morning. Here we present the work that the ITRS Design TWG has.
Don Edenfeld Mike Rodgers ITRS Test TWG
Test and Test Equipment December 2010 Makuhari Meese, Japan
Assembly and Packaging TWG
Test and Test Equipment July 2012 San Francisco, USA Roger Barth.
© 2008 Cisco Systems, Inc. All rights reserved.Cisco Confidential 1 Bill Eklow October 26, D Test Issues.
FPGA (Field Programmable Gate Array)
Copyright 2001, Agrawal & BushnellVLSI Test: Lecture 31/22alt1 Lecture 31 System Test (Lecture 22alt in the Alternative Sequence) n Definition n Functional.
Apr. 20, 2001VLSI Test: Bushnell-Agrawal/Lecture 311 Lecture 31 System Test n Definition n Functional test n Diagnostic test  Fault dictionary  Diagnostic.
Copyright 2001, Agrawal & BushnellVLSI Test: Lecture 261 Lecture 26 Logic BIST Architectures n Motivation n Built-in Logic Block Observer (BILBO) n Test.
CHALLENGES IN EMBEDDED MEMORY DESIGN AND TEST History and Trends In Embedded System Memory.
Power Integrity Analysis and Optimization in the Substrate Design Harini M, Zakir H, Sukumar M.
Copyright 2001, Agrawal & BushnellDay-1 AM Lecture 11 Design for Testability Theory and Practice January 15 – 17, 2005 Vishwani D. Agrawal James J. Danaher.
Spring 08, Jan 15 ELEC 7770: Advanced VLSI Design (Agrawal) 1 ELEC 7770 Advanced VLSI Design Spring 2007 Introduction Vishwani D. Agrawal James J. Danaher.
Copyright 2001, Agrawal & BushnellVLSI Test: Lecture 11 Lecture 1 Introduction n VLSI realization process n Verification and test n Ideal and real tests.
Spring 07, Jan 16 ELEC 7770: Advanced VLSI Design (Agrawal) 1 ELEC 7770 Advanced VLSI Design Spring 2007 Introduction Vishwani D. Agrawal James J. Danaher.
“An Effective Diagnosis Method to Support Yield Improvement” Authors List: Camelia Eindhoven Univ. of Technology Camelia Eindhoven Univ.
ITRS-2001 Design ITWG Plan December 6, 2000 Bill Joyner, SRC/IBM.
Laboratory of Reliable Computing Department of Electrical Engineering National Tsing Hua University Hsinchu, Taiwan Delay Defect Characteristics and Testing.
Copyright 2001, Agrawal & BushnellDay-1 AM-1 Lecture 11 Testing Analog & Digital Products Dr. Vishwani D. Agrawal James J. Danaher Professor of Electrical.
BIST vs. ATPG.
EE 587 SoC Design & Test Partha Pande School of EECS Washington State University
Computer Measurement Group, India Reliable and Scalable Data Streaming in Multi-Hop Architecture Sudhir Sangra, BMC Software Lalit.
Copyright 2001, Agrawal & BushnellLecture 1 Introduction1 VLSI Testing Dr. Vishwani D. Agrawal James J. Danaher Professor of Electrical and Computer Engineering.
EE414 VLSI Design Design Metrics in Design Metrics in VLSI Design [Adapted from Rabaey’s Digital Integrated Circuits, ©2002, J. Rabaey et al.]
I N V E N T I V EI N V E N T I V E EDA360 - Is End-to-End Design a Riddle, a Rebus, or a Reality? April 6, 2011.
BS Test & Measurement Technique for Modern Semi-con devices & PCBAs.
ITRS Factory Integration Difficult Challenges Last Updated: 30 May 2003.
We buy good boards! (Improve yield from design to production) Christophe LOTZ ASTER Technologies IEEE 8 th International.
Design Verification An Overview. Powerful HDL Verification Solutions for the Industry’s Highest Density Devices  What is driving the FPGA Verification.
1 ITRS Design TWG Test Column Draft 1 Feb. 4, 2001.
Robust Low Power VLSI ECE 7502 S2015 Analog and Mixed Signal Test ECE 7502 Class Discussion Christopher Lukas 5 th March 2015.
Presented By : LAHSAINI Achraf & MAKARA Felipe.  Introduction  Difficult Challenges : > Difficult Challenges between 2013 – 2020 > Difficult Challenges.
ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTES Motivation and Introduction.
ECE 7502 Project Final Presentation
ECE 553: TESTING AND TESTABLE DESIGN OF DIGITAL SYSTEMS
© 2012 xtUML.org Bill Chown – Mentor Graphics Model Driven Engineering.
Test and Test Equipment Joshua Lottich CMPE /23/05.
Testability of Analogue Macrocells Embedded in System-on-Chip Workshop on the Testing of High Resolution Mixed Signal Interfaces Held in conjunction with.
1 Yield Analysis and Increasing Engineering Efficiency Spotfire Users Conference 10/15/2003 William Pressnall, Scott Lacey.
2D/3D Integration Challenges: Dynamic Reconfiguration and Design for Reuse.
Present – Past -- Future
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
EE141 © Digital Integrated Circuits 2nd Introduction 1 Principle of CMOS VLSI Design Introduction Adapted from Digital Integrated, Copyright 2003 Prentice.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
EE588 : Semiconductor Manufacturing Equipment and Systems Course Introduction Dr. Stephen Daniels Dublin City University.
I N V E N T I V EI N V E N T I V E Can innovations in Test serve as a beacon of light in a dark economy? Sanjiv Taneja VP and GM, Encounter Test.
EE141 © Digital Integrated Circuits 2nd Introduction 1 EE4271 VLSI Design Dr. Shiyan Hu Office: EERC 731 Adapted and modified from Digital.
Outcome of BI.DIS Fast Interlocks Peer Review
ELEC 7770 Advanced VLSI Design Spring 2016 Introduction
EEE2135 Digital Logic Design Chapter 1. Introduction
VLSI Testing Lecture 14: System Diagnosis
ELEC 7770 Advanced VLSI Design Spring 2014 Introduction
ELEC 7770 Advanced VLSI Design Spring 2012 Introduction
ELEC 7770 Advanced VLSI Design Spring 2010 Introduction
World-Views of Simulation
ITRS Design.
HIGH LEVEL SYNTHESIS.
Update on Multi Vendor Interop Project.
Presentation transcript:

Test and Test Equipment July 2011 San Francisco, California Dave Armstrong ITRS 2011 Test and Test Equipment – San Francisco, CA

Test Team Akitoshi Nishimura Amit Majumdar Anne Gattiker Atul Goel Bill Price Burnie West Calvin Cheung Chris Portelli-Hale Dave Armstrong Dennis Conti Erik Volkerink Francois-Fabien Ferhani Frank Poehl Hirofumi Tsuboshita Hiroki Ikeda Hisao Horibe Brion Keller Nilanjan 'Mukherjee 'Rohit Kapur Sanjiv Taneja Satoru Takeda Sejang Oh Shawn Fetterolf Shoji Iwasaki Stefan Eichenberger Steve Comen Steve Tilden Steven Slupsky Takairo Nagata Takuya Kobayashi Tetsuo Tada Ulrich Schoettmer Wendy Chen Yasuo Sato Yervant Zorian Yi Cai Jerry Mcbride Jody Van Horn Kazumi Hatayama Ken Lanier Ken Taoka Ken-ichi Anzou Khushru Chhor Masaaki Namba Masahiro Kanase Michio Maekawa Mike Bienek Mike Peng Li Mike Rodgers Paul Roddy Peter Maxwell Phil Nigh Prasad Mantri Rene Segers Rob Aitken Roger Barth ITRS 2011 Test and Test Equipment – San Francisco, CA

Changes New Section on 3D Device Test Challenges Updated Adaptive Testing section Logic / DFT – Major re-write of this section thanks to the addition of some new team members representing the major three EDA vendorsr Numerous other changes to specialty devices info. Test Cost – Test cost survey completed that quantifies industry view Other updates will be published for the Logic, Consumer/SOC, RF, ad Analog section. ITRS 2011 Test and Test Equipment San Francisco, CA

4 Test Cost Components NRE DFT design and validation Test development Device Die area increase Yield loss Untested Units Work Cell Building People Consumables DUT Interface Test Equipment Handling Tools Factory Automation Good Units Reject Units False Pass Units False Fail Units Previous Data More challenges in the future ITRS 2011 Test and Test Equipment – San Francisco, CA

5 Test Cost Components NRE DFT design and validation Test development Device Die area increase Yield loss Untested Units Test Cell Good Units Reject Units False Pass Units False Fail Units 3D Technology Add Many Challenges Probably Good Units NRE DFT design and validation Test development NRE DFT design and validation Test development NRE DFT design and validation Test development Probably Good Units Analysis Die Stacking Test Cell Rejected Units Pass/Fail Good Die in a Failing Stack Smart Manufacturing ITRS 2011 Test and Test Equipment – San Francisco, CA

Wafer Probe Final Test Burn-in Stack / Card / System Test Fab data Design data Business data Customer specs RT A/O stands for Real-Time Analysis & Optimization ETest Optical Inspection Other inline data Assembly/Build Data FAB Field Operation RT A/O PTAD PTAD is Post- Test Analysis & Dispositioning PTAD Databases & Automated Data Analysis (This may include multiple databases. Analysis includes capabilities like post-test statistical analysis, dynamic routings and feedforward data.) Databases & Automated Data Analysis (This may include multiple databases. Analysis includes capabilities like post-test statistical analysis, dynamic routings and feedforward data.) Assembly Operations (This includes test operations at any level of assembly.) RT A/O Adaptive Test Flow

Unchanged Revised New Drop Drivers Device trends – Increasing device interface bandwidth and data rates – Increasing device integration (SoC, SiP, MCP, 3D packaging) – Integration of emerging and non-digital CMOS technologies – Complex package electrical and mechanical characteristics – Device characteristics beyond the deterministic stimulus/response model – 3 Dimensional silicon - multi-die and Multi-layer – Multiple Power modes and Multiple time domains – Fault Tolerant architectures and protocols Test process complexity – Device customization / configuration during the test process – Distributed test to maintain cost scaling – Feedback data for tuning manufacturing – Adaptive test and Feedback data – Higher Order Dimensionality of test conditions – Concurrent test within a DUT – Maintaining unit level test traceability ITRS 2011 Test and Test Equipment – San Francisco, CA

2011 Drivers (2) Economic Scaling of Test – Physical and economic limits of packaged test parallelism – Test data volume and feedback data volume – Effective limit for speed difference of HVM ATE versus DUT – Managing interface hardware and (test) socket costs – Trade-off between the cost of test and the cost of quality – Balancing General Purpose Equipment vs. Multiple Insertions for System Test and BIST 8 Unchanged Revised New Drop ITRS 2011 Test and Test Equipment – San Francisco, CA

2011 Difficult Challenges Cost of Test and Overall Equipment Efficiency – Progress made in terms of test time, capital cost, multisite test – Continued innovation in DFT, Concurrent Test, Balancing DPM vs. Cost – Gains in some cases are now limited by Overall Equipment Efficiency Test Development as a Gate to Volume Production (Time to Market) – Increasing device complexity driving more complex test development. – Complexity also driven by the diversity of different types of device interfaces on a single chip. Potential yield losses – Tester inaccuracies (timing, voltage, current, temperature control, etc) – Over testing (e.g., delay faults on non-functional paths) – Mechanical damage during the testing process – Defects in test-only circuitry or spec failures in a test mode e.g., BIST, power, noise – Some IDDQ-only failures – Faulty repairs of normally repairable circuits – Decisions made on overly aggressive statistical post-processing – Multi-die stacks / TSV – Power management issues 9 ITRS 2011 Test and Test Equipment San Francisco, CA Unchanged Revised New Drop

2011 Difficult Challenges (2) Detecting Systemic Defects – Testing for local non-uniformities, not just hard defects – Detecting symptoms and effects of line width variations, finite dopant distributions, systemic process defects Screening for reliability – Effectiveness and Implementation of burn-in, IDDQ, and Vstress testing – Screening of multiple power down modes and binning based on power requirements – Detection of erratic, non deterministic, and intermittent device behavior 10 ITRS 2011 Test and Test Equipment – San Francisco, CA Unchanged Revised New Drop

2011 Future Opportunities Test Program Automation – Automatic generation of an entire test program. – Tester independent test programming language. – Mixed Signal still a test programming challenge Scan Diagnosis in the Presence of Compression Simulation and Modeling – Seamless integration of simulation & modeling into the testing process. – A move to a higher level of abstraction with Protocol Aware test resources. – Focused test generation based on layout, modeling, and fed back fabrication data. Convergence of Test and System Reliability Solution – Re-use of test collateral in different environments (ATE, Burn-in, System, Field) 11 Unchanged Revised New Drop 11 ITRS 2011 Test and Test Equipment – San Francisco, CA

Summary Stacked devices change many things for test. – The methods and approach seem available. – Considerable work ahead of us to implement. Adaptive testing is becoming a standard approach – Significant test data accumulation, distribution, and analysis challenges. Ongoing changes to the RF, Analog, and Specialty devices. Many more details to be published in the final document.

Thank You!

Backup

Tester Local Database For real-time data analysis & actions. Resident on Tester or in Test Cell. Latency: <1 second Retention: hours Local Database For real-time data analysis & actions. Resident on Tester or in Test Cell. Latency: <1 second Retention: hours Adaptive Test Database Architecture Example Database Data availability for production – lot setup or dispositioning. Latency: minutes Retention: hours to days Database Data availability for production – lot setup or dispositioning. Latency: minutes Retention: hours to days Large Database For long-term storage Latency: minutes Retention: months … with longer-term retrieval options. (data is available forever) Large Database For long-term storage Latency: minutes Retention: months … with longer-term retrieval options. (data is available forever) World-wide, cross-company databases

3D Device Testing Challenges Test Access Die level Access Die in Stack Access Test Flow/Cost/Resources Heterogeneous Die in the Stack Die in Stack Testing Die to Die Interactions Debug/Diagnosis DFT Test data managements, distribution, & security Power Implications

SOC / Logic Update Takes the device roadmap data and calculates: Fault Expectations both inside and outside the various cores using multiple fault models. Required test pattern lengths given five different assumptions: » Flat test patterns » Test implemented taking advantage of the circuit hierarchy » Tests implemented using compressed flat patterns. » Tests implemented using compressed hierarchal test patterns. » Using low power scan test approach.

LCD Device Probing Challenge Overcome New probe needle arrangement 4 layers + 4 layers = 8 layers could provide solution for LCD driver probe pad continually narrow down.

Higher Site Count Camera Chips Chief º Max º Min º Chief ray EPD D Tan( )= (D/2)/EPD D=Pupil diameter F-number = EPD / D Single site Four sites

MEMs Sensors For Handheld Devices GyroAccelerometers E-CompassPressure Expect a 10% yearly growth