Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities.

Slides:



Advertisements
Similar presentations
Components of Building Construction – Building 101 Basic knowledge of your buildings, how to maintain them and things to look for on your spring walkthrough.
Advertisements

Update on FCPS Construction/Renovation Projects July 2009.
1 Zero Tax Increase Referendum: Community Information Session.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Summer DEPARTMENT ORGANIZATION Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental Management 2.3 millionsquare.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
Update on FCPS Construction/Renovation Projects August 2009.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Current Project Update October 25th 2012 Good Evening!!!
Construction Update September 2014 Madison Elementary School District.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Finance and Facilities. DuPage County, IL EAV Growth History (Five Year Average: -2.15%)
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Madison Elementary School District #38 Construction update Bond & Capital 6/5/12.
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
Bond Construction Update Facilities Advisory Committee Long Beach Community College District September 2, 2008 BUILDING  TOMORROW  TODAY 1.
Eldred Central School District Five Year Capital Facilities Plan September
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Madison Elementary School District Bond Project Update August 2013.
WISH LISTS. GHS Install building wide phone system w/voic Remodel Office area w/AC Enlarge parking lot near LC Replace asbestos floor tile Pave gravel.
Proposed Alternative to the Curved Wall Concept Friends of the Orange Depot By J David Derosier 1.
HIGHLAND PARK BOND WORK The final results will be AMAZING!
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Rio Del Oro Riverside Meadows Cobblestone. Plumas Lake Elementary School District ( Maintenance Department ) Here’s the life cycle I use for our Deferred.
2012 Planned Facilities Reconstruction Project. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
Congregational Informational Meeting May 23, 2011 Statesboro First United Methodist Church.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Trinity Lutheran Church Major Maintenance Tuesday, February 17, 2015.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Winchester Medical Center Campus Expansion June 21, 2011.
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
Capital Improvement Program for September 9, 2014.
SUMMER 2015 DEFERRED MAINTENANCE
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
1 Five Year Capital Improvement Schedule Lancaster County School District
Making Our Facilities Better Board of Directors Update – Wednesday, July 24, 2013.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
FY2017-FY2026 GDRSD Capital Plan-June 22, 2016 Jared Stanton, Director of Business and Finance.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Facilities Focus Group
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Capital Improvements Presentation
Dr. Joseph Meloche Superintendent of Schools Mrs
Progress Report 11/10/11.
The summer of 2018 and all the work that has taken place
2018 Bond Review and Proposal
Building & Property Committee
Mount Vernon Community School
Charter Oak Unified School District
Capital Outlay Workshop
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Recent Bond Accomplishments
Minuteman Vocational Technical Regional High School Progress
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Mount Vernon Community School
Minuteman Vocational Technical Regional High School Progress
EAST PENNSBORO AREA SCHOOL DISTRICT
Community Practice Asset Management.
Minuteman Vocational Technical Regional High School Progress
Facilities Update Garden Grove Unified School District
Presentation transcript:

Construction Update August 18, 2010 Rob Gaertner, P.E. Director of Facilities

Agenda IntroductionDr. Green Project OverviewRob Gaertner Questions/Comments

Introduction Projects were included in the 2010/11 Capital Funding Plan Address ongoing maintenance of the District’s facilities. The total value of the major construction contracts that were awarded is $861,390.

Roof Replacement at McKnight Elementary School Replaced 42,500 square feet of rubber roofing that was installed in Replace Greenhouse roofing, gutters and downspouts. Installed new roof insulation. Replaced and relocated roof drains. Installed new metal roof edge. Project should be substantially completed on August 25, 2010.

McKnight Elementary School

Installation of Elevators for the Cafeteria and Technology Education areas at NAI Replaced the existing chair lifts with elevators. Modified existing building to provide space for the two new elevators and equipment rooms. Provide a Student Activities area in the lobby outside of the Cafeteria. The Café Elevator is scheduled to be inspected on August 20, The Tech Ed Elevator is tentatively scheduled for inspection on August 27, 2010

NAI Cafeteria Elevator Installation

NAI Student Activities Area

NAI Tech Ed Elevator Installation

Masonry Repairs at Bradford Woods Elementary Removal and replacement of the glazed brick installed above the Kitchen and Receiving area doors. Removal and replacement of the five brick piers on the sides of the main entrance stairs. Project was completed on July 23, 2010.

Masonry Repairs at BWE

Greenhouse Masonry Repairs at McKnight This project included the repairs to the existing masonry around the base of the Greenhouse. Installation of a coating of mortar over the existing block to seal the existing masonry. Installation of a stainless steel flashing around the base of the greenhouse glazing to direct the water away from the masonry. Sealing of the new masonry coating. This project was completed on August 13, 2010

Greenhouse Masonry Repairs at McKnight

Installation of Additional Exterior Cameras at NASH Installed fourteen additional digital cameras around the exterior of NASH. –Student Parking Lot – 4 –Around the perimeter of the building - 10 Installed ten additional digital cameras around the interior of NASH. –Inside the Stair Towers – 8 –Cafeteria - 2 This project should be completed by August 30, 2010.

Installation of Exterior Door Card Key System at MMS Installed card key access control system on 4 exterior doors at MMS. –Auditorium Entrance –Gym Entrance –Receiving Area –Back of Gym This work was completed on August 17, 2010.

Other Projects Painting of the exterior steel at BWE. Repairs to the gutters at BWE, MES, MMS and the Baierl Center – In Progress. Modifications to the ductwork for the IT Server Room HVAC system. Concrete Sidewalk and Curbs Repairs at: –BWE, MES, McK, and NAI Driveway and Parking Lot Repairs at: –HES, IES, McK, NAI and Transportation

Other Projects Subdivision of Room 107 at IMS. Construction of the Cumberland Campus trail. Replacement of the projection screen on the stage at CMS. Installation of wall pads in the small gym at NAI – In Progress. Repairs to the locker room shower controls at NASH. Installation of electronic ballasts in the classrooms at NAI – On Going.

Questions/Comments