1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Accelerator Installation Plan Gregory Fries Project Engineer, Accelerator Systems Division CFAC Review of NSLS-II.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Thomas C. Nehring, P.E. Lead Electrical Engineer CFAC Review November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
Engineering & Buildings Procurement Seminar.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities CD-2 Planning May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
Specification & Quantities Estimating
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Status & Charge to ASAC Steve Dierker Associate Laboratory Director for Light Sources, NSLS-II Project Director.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CHILLED WATER & COMPR. AIR PIPING Thomas F. Joos, P.E. Lead Civil/Structural Engineer CFAC Review November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Construction Management At Risk Process
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David Dale Procurement Manager CFAC Status Meeting May 8, 2008.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
DTF implementation Roles and responsibilities
Meeting of the LCLS Facilities Advisory Committee
Far Experimental Hall Hutches Civil Construction
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities Advisory Committee Review October 5 - 6, 2010

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Project Overview LOB Status LOB & Ring Building Contractor Coexistence Plans LOB – Ring Building Coordination Site Logistics Plan Pre-Construction / Mobilization Requirements Actions To Date Construction Phasing Inspection Planning Schedule Status Conclusions

3 BROOKHAVEN SCIENCE ASSOCIATES Project Overview LOB Status Scope (WBS ) Construction of Laboratory Office Buildings (LOBs) # 1,2 & 3 – Full Build-Out - LOBs 1 & 3 – Core & Shell – LOB #2 – Temporary Toilets at LOBs 4 & 5, required for Code Compliance Each LOB features a mix of wet labs, dry labs, fabrication/assembly shops, and technical spaces that have easy access to the Ring Building experimental floor; Connection of Utility Services from Ring Building, including – Electric, Domestic Water, Sanitary Sewer, Chilled Water, Lab Gases (GN2, CA), Steam & Condensate; On Site Infrastructure Improvements – Associated Parking & Roads

4 BROOKHAVEN SCIENCE ASSOCIATES Project Overview LOB Status Contract amount = $34M Pre-bid estimate = $43M (Nov. 09) Contractor selected based on : Technical Evaluation Factors Safety Performance Technical Experience Proposed Mgt Team Proposed Subcontractors Past Performance & QA Contractor Price Best Value Selection

5 BROOKHAVEN SCIENCE ASSOCIATES Project Overview LOB Status Contractor: EW Howell DOE Approval:8/13/10 Contract Award:9/13/10 Notice to Proceed: Est. 10/6/10 Contract Completion Date6/29/12 –LOB 2 Target Beneficial Occupancy Date: 5/1/12 –LOB 1 Target Beneficial Occupancy Date: 6/1/12 –LOB 3 Target Beneficial Occupancy Date: 6/29/12

6 BROOKHAVEN SCIENCE ASSOCIATES LOB – Ring Building Coordination LOB Site Logistics Plan

7 BROOKHAVEN SCIENCE ASSOCIATES LOB & Ring Building Contractor Coexistence Plans LOB Pre-Construction Efforts –Provide LOB 4 Building Pad & Area Grading: 10/1/10 -Will Facilitate LOB Contractor Mobilization –Provide Temporary Electric at Trailer Area: Due 10/8/10 –Provide LOBs 1-3 Building Pad Turnover Requirements: Due 10/1/10 -Pads Certified: Survey & Compaction -As-Built Drawings for Underground Utilities –Provide As-built Drawings for LOB Utilities at Ring Building: -Work in Progress by Ring Building Contractor LOB – Ring Building Coordination

8 BROOKHAVEN SCIENCE ASSOCIATES LOB – Ring Building Coordination LOB & Ring Building Contractor Coexistence Plans Actions / Discussions To Date –Coordination Meeting Held with EW Howell & Torcon -Will Facilitate Contractor Site Utilization –Contractors Share Same Insurance Carrier for CCIP -Will Advise Each Other’s Rep. –EW Howell Plans for Segregating Workers -Take Daily Attendance -Different Color Hard Hat Sticker -Workers Not Shared on Daily Basis -Gated / controlled access to each contractor’s work area

9 BROOKHAVEN SCIENCE ASSOCIATES LOB – Ring Building Coordination LOB & Ring Building Contractor Coexistence Plans Establish Weekly Coordination Meetings with both Contractors Continue to provide As-built information to LOB Contractor Hold Safety meetings with LOB Contractor Ensure consistent approach to Inspections Utilize lessons learned from Ring Building BORE(s) for LOB construction

10 BROOKHAVEN SCIENCE ASSOCIATES Ring Bldg Construction Phasing Beneficial Occupancy Dates Construction of LOBs to be Coordinated with Ring Bldg Construction Phasing Phase Milestone Baseline 1 Pentant 1- BO 1-Feb-11 2 Pentant 5 - BO 9-Feb-12 3 RF Building - BO 23-Mar-11 4 Pentant 2 - BO 2-Jun-11 5 Pentant 3 - BO 27-Sep-11 6 Injection Building - BO 18-May-11 7 Pentant 4 - BO 28-Nov-11 8 Ring Bldg Const. Complete 30-Apr-12

11 BROOKHAVEN SCIENCE ASSOCIATES LOB 2 Building Pad & Connection Point Building Pad MEP Utilities from Service Building LOB – Ring Building Coordination

12 BROOKHAVEN SCIENCE ASSOCIATES LOB 1 MEP Connection Point LOB – Ring Building Coordination MEP Utilities from Service Building

13 BROOKHAVEN SCIENCE ASSOCIATES LOB – Ring Building Coordination MEP Utilities from Service Building LOB 1 MEP Connection Point

14 BROOKHAVEN SCIENCE ASSOCIATES Inspection Planning Staffing -Construction Engineer -Civil-Architectural Inspectors - 2 -Mechanical Inspectors - 2 -Electrical Inspector – 1 (another to be added) -Clerk of the Works / Asst. Project Engineer Organization -Inspectors to be dedicated to specific areas of responsibility -Facilitates Better understanding of area requirements & trade performance -Planning for Inspections more focused on “Interior Finishes” -Ensure Contractor Implements & adequately staffs QA Program LOB – Ring Building Coordination

15 BROOKHAVEN SCIENCE ASSOCIATES Inspection Planning, cont’d Control Testing –By Independent Outside Agencies under BNL contract -Concrete Testing -Soils Testing -Structural Steel Staff can be Augmented as needed by Liro-Gilbane LOB – Ring Building Coordination

16 BROOKHAVEN SCIENCE ASSOCIATES Inspection Planning, cont’d LOB – Ring Building Coordination

17 BROOKHAVEN SCIENCE ASSOCIATES Inspection Planning, cont’d Communication and Document Management Project Control Software – Contract Manager (formerly Expedition) –EW Howell issued license –EW Howell familiar with Contract Manager –Easily Create, Share and Access Project Documents -RFIs, Submittals, Transmittals LOB – Ring Building Coordination

18 BROOKHAVEN SCIENCE ASSOCIATES LOB – Ring Building Coordination Schedule Development Meeting Held 9/17/10 EW Howell to Prepare & Submit Schedules: –Preliminary 90 day: Due 10/4/10 –Detailed CPM Schedule: Due 10/25/10 Schedule Development to Follow WBS Format –Howell using same scheduling consultant for both LOB & ISB projects Schedule Status

19 BROOKHAVEN SCIENCE ASSOCIATES Conclusion Successfully advanced LOB program by over 1 year LOB Contractor has record of successful performance at BNL LOB & Ring Contractor site utilization requirements are established Initial interactions between the contractors are favorable High level of confidence in successfully completing LOBs with minimal impact on Ring Bldg